Roxas Substation Pert-Cpm

This document outlines the construction schedule for the Roxas Substation project from December 2016 to September 2017. It includes milestones for mobilization, stake out, layout, board up, supply and installation of switchyard structures and conductors, construction of the power house and guard house, and installation of lighting, air conditioning, plumbing and water systems with expected start and finish dates. The overall project completion date is scheduled for September 14, 2017 after 276 days of work.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
239 views

Roxas Substation Pert-Cpm

This document outlines the construction schedule for the Roxas Substation project from December 2016 to September 2017. It includes milestones for mobilization, stake out, layout, board up, supply and installation of switchyard structures and conductors, construction of the power house and guard house, and installation of lighting, air conditioning, plumbing and water systems with expected start and finish dates. The overall project completion date is scheduled for September 14, 2017 after 276 days of work.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

ROXAS SUBSTATION Mobilization Temfacil Stake Out

Project Start
Start: Tue 12/13/16ID: 0 Start: Tue 12/13/16 ID: 3 Start: Wed 12/14/16ID: 4 Start: Fri 12/16/16 ID: 5
Finish: Thu 9/14/17Dur: 276 days Milestone Date: Tue 12/13/16 Finish: Tue 12/13/16Dur: 1 day Finish: Thu 12/15/16Dur: 2 days Finish: Fri 12/16/16 Dur: 1 day
Comp: 0% ID: 1 Res: Res: Res:

Layoutting Board Up
Start: Fri 12/16/16 ID: 6 Start: Sat 12/17/16 ID: 7
Finish: Fri 12/16/16 Dur: 1 day Finish: Fri 12/30/16 Dur: 14 days
Res: Res:

Completion of Construction of
Temfacil and Board Up
Milestone Date: Fri 12/30/16
ID: 8

Supply and Installation of Substation Steel Structure ( Switchyard


SupplyArea
and) Installation of Switchyard Overhead Conductors and Hardwares
Start: Wed 12/14/16ID: 20 Start: Sun 3/19/17 ID: 49
Finish: Sat 3/18/17 Dur: 95 days Finish: Sat 4/1/17 Dur: 14 days
Res: Res:

Construction of Power House Construction of Guard House Lighting and Power System
Start: Wed 12/14/16ID: 32 Start: Sat 4/8/17 ID: 33 Start: Tue 3/14/17 ID: 52
Finish: Fri 5/12/17 Dur: 150 days Finish: Fri 5/12/17 Dur: 35 days Finish: Fri 5/12/17 Dur: 60 days
Res: Res: Res:

Airconditioning System
Start: Sat 4/22/17 ID: 34
Finish: Fri 5/12/17 Dur: 21 days
Res:

Plumbing System
Start: Sat 4/29/17 ID: 35
Finish: Fri 5/12/17 Dur: 14 days
Res:

Water Line System


Start: Sat 4/29/17 ID: 36
Finish: Fri 5/12/17 Dur: 14 days
Res:

Power House & Guard House


Completed
Milestone Date: Fri 5/12/17
ID: 37

Detailed Engineering
Start: Wed 2/22/17 ID: 2
Finish: Fri 4/7/17 Dur: 45 days
Res:

Construction of 115kV Substation Equipment Foundation ( Switchyard Area ) 50MVA Power Transformer Completion of Equipment
Start: Sat 12/17/16ID: 9 Start: Sat 12/17/16 ID: 10 Foundation
Finish: Sun 2/26/17Dur: 72 days Finish: Fri 12/30/16 Dur: 14 days Milestone Date: Sun 2/26/17
Comp: 0% Res: ID: 19

69kV A-Frame, Foundation 69kV H-Frame, Foundation


Start: Mon 12/26/16ID: 11 Start: Mon 12/26/16ID: 12
Finish: Sun 1/22/17 Dur: 28 days Finish: Fri 1/27/17 Dur: 33 days
Res: Res:

69kV Power Circuit Breaker, Deadtank 69kV Disconnect Switch 69kV Surge Arrester 69kV Potential Transformer 69kV Current Transformer 69kV Post Insulator
Start: Mon 1/16/17 ID: 13 Start: Thu 1/19/17 ID: 14 Start: Mon 1/23/17 ID: 15 Start: Mon 1/30/17 ID: 16 Start: Fri 2/3/17 ID: 17 Start: Mon 2/6/17 ID: 18
Finish: Fri 1/27/17 Dur: 12 days Finish: Thu 2/2/17 Dur: 15 days Finish: Tue 2/7/17 Dur: 16 days Finish: Sat 2/11/17 Dur: 13 days Finish: Sun 2/12/17 Dur: 10 days Finish: Sun 2/26/17 Dur: 21 days
Res: Res: Res: Res: Res: Res:

Site Development Grading Ground leveling and gravel surfacing


Start: Wed 1/4/17 ID: 21 Start: Mon 2/27/17 ID: 22 Start: Mon 3/13/17 ID: 23
Finish: Sat 6/24/17 Dur: 172 days Finish: Sun 3/12/17 Dur: 14 days Finish: Sun 3/26/17 Dur: 14 days
Comp: 0% Res: Res:

Completion of Site Development

Milestone Date: Sat 6/24/17


ID: 31

Construction of Perimeter CHB Seclusion Fence Drainage system


Start: Wed 1/4/17 ID: 24 Start: Fri 2/3/17 ID: 25
Finish: Wed 4/5/17 Dur: 92 days Finish: Thu 3/23/17 Dur: 49 days
Res: Res:

Structural excavation/fill, concreting of cable trenches including


Concrete
steel plate
Ductbank
cover and cable trays Concrete Pedestal
Start: Wed 2/1/17 ID: 26 Start: Mon 2/6/17 ID: 27 Start: Mon 2/27/17 ID: 28
Finish: Sat 6/24/17 Dur: 144 days Finish: Sun 2/26/17 Dur: 21 days Finish: Sun 3/12/17 Dur: 14 days
Res: Res: Res:

Concrete Pavement Access Road Network


Start: Mon 2/27/17 ID: 29 Start: Mon 3/13/17 ID: 30
Finish: Sun 3/12/17 Dur: 14 days Finish: Sun 3/19/17 Dur: 7 days
Res: Res:

Installation of Switchyard Electrical Equipment 69kV Power Circuit Breaker, Deadtank 69kv MVSG( 8 Vertical sections) 69kV Control Panel
Start: Fri 2/3/17 ID: 38 Start: Wed 3/15/17 ID: 39 Start: Mon 7/31/17 ID: 45 Start: Mon 8/14/17 ID: 46
Finish: Mon 8/14/17Dur: 193 days Finish: Wed 3/15/17Dur: 1 day Finish: Sun 8/13/17 Dur: 14 days Finish: Mon 8/14/17Dur: 1 day
Comp: 0% Res: Res: Res:

Completion of Equipment
Installation
Milestone Date: Mon 8/14/17
ID: 47

69kV Disconnect Switch


Start: Fri 2/3/17 ID: 40
Finish: Fri 2/3/17 Dur: 1 day
Res:

69kV Surge Arrester


Start: Wed 2/8/17 ID: 41
Finish: Wed 2/8/17 Dur: 1 day
Res:

69kV Potential Transformer


Start: Sun 2/12/17 ID: 42
Finish: Sun 2/12/17 Dur: 1 day
Res:

69kV Current Transformer


Start: Mon 2/13/17 ID: 43
Finish: Mon 2/13/17Dur: 1 day
Res:

69KV Post Insulator


Start: Mon 2/27/17 ID: 44
Finish: Mon 2/27/17Dur: 1 day
Res:

Supply and Installation of Equipment Grounding System Completion of Substation


Project Finish
Start: Wed 2/22/17 ID: 48 Electrical Works
Finish: Sat 4/22/17 Dur: 60 days Milestone Date: Thu 9/14/17 Milestone Date: Thu 9/14/17
Res: ID: 54 ID: 55

Assembly of One (1) 50MVA Power Transformer and Oil Filling Power and Control Cables and Accesssories Testing and Commissioning of Substation
Start: Wed 2/15/17 ID: 50 Start: Tue 8/15/17 ID: 51 Start: Tue 9/5/17 ID: 53
Finish: Tue 2/28/17 Dur: 14 days Finish: Mon 9/4/17 Dur: 21 days Finish: Thu 9/14/17 Dur: 10 days
Res: Res: Res:

Critical Critical Milestone Critical Summary Critical Inserted Critical Marked Critical External Project Summary Highlighted Noncritical
Project: ROXAS SUBSTATION
Noncritical Milestone Summary Inserted Marked External Highlighted Critical
Date: Wed 2/22/17
Page 1