The document provides details of a reinforced concrete pile including: - The pile has a total length of 13.8m with a top level of 1.8m and toe at -12m. - Longitudinal reinforcement consists of 6 bars with a diameter of 25mm. - Spiral reinforcement has a spacing of 200mm. - Checks show the provided shear reinforcement of 0.58% is not sufficient and needs to be increased to the required 0.6%.

Uploaded by

Monal Raj
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
45 views12 pages

Reinforcement Master

The document provides details of a reinforced concrete pile including: - The pile has a total length of 13.8m with a top level of 1.8m and toe at -12m. - Longitudinal reinforcement consists of 6 bars with a diameter of 25mm. - Spiral reinforcement has a spacing of 200mm. - Checks show the provided shear reinforcement of 0.58% is not sufficient and needs to be increased to the required 0.6%.

Uploaded by

Monal Raj
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 12

Pile top level 1.

8 m
Pile Toe level -12 m
Pile Cage length
Total Pile length 13.8 m 2/3 9.2 11.7 12.95
1/3 4.6 5.85 7.1
13.8
Pile length
5 1.8
5 -12

Cut-off level
0 1.8
10 1.8

Extended Pile
Anchorage
length at Total cage
5 3.05 top 1.25 m length
5 1.8 Lap length 1.25 m 16.3

Pile dia 800 mm Pt provided 0.58%


Area of c/s 502655 mm 2 Ptrequired 0.60% 30.16 cm^2
5027 cm2 NOT SAFE

Lognitudinal Reinforcement

No. of Area of bar Area of bar Total area


Bars Dia of Bars (mm^2) (cm^2) (cm^2)
6 25 490 4.9
29.4
0 16 201 2.01
6

Spacing Check

Max. dia of Longnitudinal bar 25 mm


Dia of later reinforcement 12 mm
Pile Cover 100 mm
Effective dia. 575.5 mm
Perimeter 1808 mm
Spacing 301 mm
Clear spacing 276 mm

Spiral Reinforcement

Spacing 200 mm

No. of Area of bar Area of bar Total area


Bars Dia of Bars (mm^2) (cm^2) (cm^2)
2 10 156 1.56 7.8
0 1 2 3 4 5 6 7 8 9 10
4

-2

-4 Pile lengt
Cut-off le
Extended
-6

-8

-10

-12

-14
10

Pile length
Cut-off level
Extended Pile
Pile top level -0.875 m
Pile Toe level -12 m
Pile Cage length
Total Pile length 11.125 m 2/3 7.42 9.42 10.41667
1/3 3.71 4.71 5.708333
11.125
Pile length
5 -0.875
5 -12

Cut-off level
0 -0.875
10 -0.875

Extended Pile
Anchorage
length at Total cage
5 0.125 top 1m length
5 -0.875 Lap length 1m 13.125

Pile dia 800 mm Pt provided 0.62%


Area of c/s 502655 mm 2 Ptrequired 1.00% 50.27 cm^2
5027 cm2 NOT SAFE

Lognitudinal Reinforcement

No. of Area of bar Area of bar Total area


Bars Dia of Bars (mm^2) (cm^2) (cm^2)
10 20 314 3.14
31.4
0 25 490 4.9
10

Spacing Check

Max. dia of Longnitudinal bar 25 mm


Dia of later reinforcement 12 mm
Pile Cover 100 mm
Effective dia. 575.5 mm
Perimeter 1808 mm
Spacing 181 mm
Clear spacing 156 mm

Spiral Reinforcement

Spacing 200 mm

No. of Area of bar Area of bar Total area


Bars Dia of Bars (mm^2) (cm^2) (cm^2)
2 12 226 2.26 11.3
0 1 2 3 4 5 6 7 8 9 10
2

-2

-4

Pile lengt
Cut-off le
-6
Extended

-8

-10

-12

-14
10

Pile length
Cut-off level
Extended Pile

You might also like