1. The Ebara Hydro Booster system consists of multiple variable speed pumps coupled in parallel and controlled by a microcomputer controller to provide constant water pressure. 2. The system includes frequency inverters to enable variable speed operation of the pumps for energy savings and pressure control. Diaphragm tanks and pressure sensors are also included. 3. The controller monitors system parameters like pressure and flow to start and stop pumps as needed to maintain constant pressure, distribute run times evenly among pumps, and ensure backup operation and continuous water supply in case of pump or inverter failure.

Uploaded by

nettomd
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
299 views

Ebara Variable Speed and Constant Pressure Booster

1. The Ebara Hydro Booster system consists of multiple variable speed pumps coupled in parallel and controlled by a microcomputer controller to provide constant water pressure. 2. The system includes frequency inverters to enable variable speed operation of the pumps for energy savings and pressure control. Diaphragm tanks and pressure sensors are also included. 3. The controller monitors system parameters like pressure and flow to start and stop pumps as needed to maintain constant pressure, distribute run times evenly among pumps, and ensure backup operation and continuous water supply in case of pump or inverter failure.

Uploaded by

nettomd
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 27

UN

EBARA VARIABLE SPEED and CONSTANT PRESSURE BOOSTER SYSTEM

The EBARA Hydro Booster system consists of two or more and suitable gate valves are fitted for optimal system
EVM pumps coupled in parallel and mounted on a operation.
common baseplate, integrally provided with a EBARA
Hydro Controller electrical cabinet and all the necessary Diaphragm Pressure Tank
common pipe work and fittings. All EBARA Hydro Booster A pre-charged diaphragm tank is fitted to the discharge
system is factory assembled and tested, pre-set according pipe with a compatible Butyl-rubber diaphragm. Generally
to customer requirement. It is ready-to-connect at site. this tank serves basic functions of supplying water at a
Scope of supply includes instruction manual. very low flow and minimising effect of water hammering.

Fully assembled and certified Hydro Booster set type UN Pressure Sensor
generally consist of multiple pumps arranged in parallel, 1-5V to transmit control type signals to the EBARA Hydro
mounted on a common baseframe, pipework complete Booster Controller, located at the discharge side or/suction
with EBARA microcomputer controller unit, frequency side (depend on systems offered).
inverters, pressure sensor and complete with all internal
electrical wiring. Frequency Converter
Constant water pressure is achieved due to variable
EBARA Hydro Booster system type UN is a variable speed drive made possible by the use of frequency
speed control booster system utilising advance and converters. To ensure highly reliable EBARA system, each
proven microcomputer namely EBARA Hydro pump is equipped with frequency converter unit, thus
Controller unit to provide constant pressure to suit ensure optimal operation of pumping system.
your system requirement.
Flow Switch
Applications Flow switch is used to enhance system operation by
General water supply i.e schools, hotels, hospitals, high- receiving signal to cut-out pump operation during low-
rise buildings, etc. flow or no-flow condition. Thus can be used as dry-running
Industrial water supply protection device.
Irrigation system for garden, parks, golf courses, etc.
All booster pump station Ebara Controller
This micro-processor controller unit is fitted to the Hydro
Pumps Booster Control Panel to control variable speed pumping
2 or more EBARA pumps are arranged for parallel operation. It provides One-touch operating possibility to
operation. All parts contact with liquid are of stainless steel. interpret various signals from pressure transmitter and
flow switch, thereby enhance constant pressure system
Baseframe & Common Pipe work operation. In addition, it provides various advance
Galvanized pipe work enable easy connection to all operative functions that maintain constant pressure and
commonly used pipe fittings. The pipework is sized trouble-free water supply system.
suitable for maximum hydraulic unit capacity. Check valve
UN

ISOMETRIC DRAWING

4 5

3
6

8
9
10
No. Part Name
11 1 Control Panel
12
2 Controller
3 Suction Manifold
4 Gate Valve
5 Pump
6 Expansion Tank
7 Discharge Manifold
8 Pressure Switch
9 Pressure Transmitter
10 Pressure Gauge
11 Check Valve
12 Flow Switch
UN

EBARA VARIABLE SPEED BOOSTER SYSTEM


UN

EBARA VARIABLE SPEED BOOSTER SYSTEM


1. Advance energy saving system 5. Cyclic & forced cyclic operation
This unit is operating on variable speed drive control During continuous operation, if the pump continuously
incorporated with logic control system. Thus saving energy run over 6 hours, second pump will start to run parallel
for most demanding conditions. and then change over to new one. This would ensure
even operating hours for multiple pumping system; thus
2. Constant pressure water supply prolong life span of pumps.
The variable speed pumping system would ensure
constant water pressure for the furthest point with pipe
friction loss compensation capability.

Fig. Cyclic Operating System

Fig. Pipe Friction Loss Compensation Operation

3. Highly reliable inverters being used


Individual frequency inverters are provided for each pump,
thus reduces emergency risk with automatic change over
and back-up system. During pump or inverter failure,
second pump will start automatically and back-up
operation to ensure water supply continues.

Fig. Forced Cyclic Operation

6. APNC & APR System

Fig. Custom Design Control Panel

4. User-friendly operation
Ebara unique controller permits easy access and displays
most data in the front panel. The controller is a
microcomputer board with LCD operation adjustment and
instant information display. Fig. APNC - Automatic Pump Number Charge-Over System

Fig. APR - Automatic Pump Rest At Small Demand


Fig. Ebara Proven - Designed Controller
UN

EBARA VARIABLE SPEED BOOSTER SYSTEM - OPERATION METHOD



Advance pump stop
Advance pump start

Advance pump start


Advance pump stop


5th to 2nd pump stop

5th to 2nd pump stop


3rd to 5th pump start

3rd to 5th pump start


2nd pump start

2nd pump start


When water flow is low
When water flow is great

A. When water flow is low


4 If the volume of water used decreases, the flow switch
1 If water is used, the inner pressure of the pipes drop,
is triggered and the delayed pumps shut down in
triggering the pressure sensor, and advance pump
order, eventually leaving only the advance pump
(Ex: No.1) starts up.
operational.
5 If water stops being used, the flow switch is triggered,
5 If water stops being used, the flow switch is triggered,
and advance pump (Ex: No. 1) stops after the required
and advance pump stops after the required time has
time has elapsed. At this time, the advance pump
elapsed. At this time, the advance pump rotates. (Ex:
rotates. (Ex: The advance pump changes from No. 1
The advance pump changes from No. 1 to No. 2.)
to No. 2)
6 If water is used again, the inner pressure of the pipes
6 If water is used again, the inner pressure of the pipes
drops, triggering the pressure sensor, and 2nd pump
drops, triggering the pressure sensor, and advance
(Ex: No. 2) starts up.
pump (Ex: No. 2) starts up.
7 If the flow continues to increase, the rotational speed
10 If water stops being used, the flow switch is triggered,
of advance pump (Ex: No. 2) reaches maximum and
and advance pump (Ex: No. 2) stops after the required
2nd pump (Ex: No. 3) starts up.
time has elapsed. At this time, the advance pump
8 As the volume of water used increases in order, the
rotates. (Ex: The advance pump changes from No. 2
delayed pumps start in order from the 3rd (Ex: No. 4)
to No. 3.) In the same way, the advance pump rotates
to the 4th (Ex: No. 5), to the 5th (Ex: No. 1), to a
in order from No. 3 to No. 4, No. 4 to No. 5 and No. 5
maximum of 5 pumps.
to No. 1, while steps 1 , 5 , 6 , and 10 are
9 If the volume of water used decreases, the flow switch
repeated in order.
is triggered and the delayed pumps shut down in
order, eventually leaving only the advance pump
B. When water flow is great
operational.
1 If water is used, the inner pressure of the pipes drop,
10 If water stops being used, the flow switch is triggered,
triggering the pressure sensor, and advance pump
and advance pump (Ex: No. 2) stops after the required
(Ex: No.1) starts up.
time has elapsed. At this time, the advance pump
2 If the flow continues to increase, the rotational speed
rotates. (Ex: The advance pump changes from No. 2
of advance pump reaches maximum and 2nd pump
to No. 3.)
(Ex: No. 2) starts up.
In the same way, the advance pump rotates in order
3 As the volume of water used increases in order, the
from No. 3 to No. 4, No. 4 to No. 5, and No. 5 to No.
delayed pumps starts in order from the 3rd (Ex: No.
1, while steps 1 - 10 are repeated in order.
3) to the 4th (Ex: No. 4), to the 5th (Ex: No. 5), to a
maximum of 5 pumps.
UN

EBARA VARIABLE SPEED BOOSTER SYSTEM - CONTROLLER

The heart of the system is the EBARA controller unit, 1 x Power on indicating light
which is user-friendly and permits One-touch operation. 1 x Power selector switch (ALT/PAR/Rotation/P1 to P5)
It controls the sequence of pump operation with signals 1 x Mode selector switch (Auto/Test)
input from the pressure sensor and/or flow switch in Auto 1 x Power main on off switch
& Alternate mode. This user-friendly controller unit oper- 1 x Set switch
ates compatible with other electrical components to en- 1 x Function / Monitor switch
sure smooth function of booster system. 1 x Buzzer stop switch
1 x Alarm reset switch
EBARA controller unit generally provides the below 1 x Run switch
One-touch functioning features: 1 x Stop switch
1 x LCD System parameter displays
UN

EBARA VARIABLE SPEED BOOSTER SYSTEM - UNIQUE FEATURE


Unique Feature- Receiving (Water) tank

Note 1. * Short circuit E12-E15, E22-E25 (when using the dual tank system) with the jumper cable (included).
2. Water reduction is detected by timer control. Therefore, the empty display may be triggered during
the period when the suction amount is greater than the volume of water flowing into the water tank.

PROTECTION FEATURES REMOTE MONITORING FEATURES


Automatic back up system ensure smooth and The same operation conditions of the pumping system can be
continuous pumping operation during the observed and monitored at remote station with only 2 wire connection.
below malfunction: No additional electrical supply is required. Buzzer is provided, and
- electrical leakage, distance within 500 m is permissible.
- discharge pressure drop,
- inverter tripped Display Items:
1) Normal display
Freezes pump Operation when Low Water Digital : Discharge pressure, Pump Operation Hz (each pump).
level at suction tank. Fault Display for below: Operation current (each pump), Voltage.
- suction tank water level Others : Electrical source (LED Display).
- system interlock Operation mode (Auto, Test, No. of Pump)
- electrical leakage System interlock.
- low discharge pressure. *Option (IN-LINE 2) Fault Display
BOOSTING mode) Discharge pressure drop (each pump),
Inverter fault (each pump),
Water level (over-flow, insufficient, shortage conditions).
Item Standard Optional
Operation system Pump speed Inverter variable speed control drive
Pressure control Constant pressure with system loss compensation
Number of pump control Single alternate, Parallel alternate, Up to 5 pumps cyclic
Pumps rest at small flow rate
Installation area Indoor Outdoor
Ambient temperature Up to 40C Weather-proof available
Pump Vertical multistage Pump: Model EVM 3M, CDX and other EBARA model
Power source Three phase, 380/400/415 V, 50 Hz
Pressure tank Type Pre-charged Diaphragm
Capacity 18L Over 18L
Max. working pressure 10 bar Up to 20 bar
Pressure sensor 3 Wire for DC 12V
Output Voltage 1 - 5V
Control panel Main components Inverter (each pump), Control panel (Remote type) Water level board,
& Controller Main circuit breaker, Main control CPU board Main supply noise filter
Interface board, Pilot light, Isolator, Voltage detection board Surge protector
Control circuit noise filter, Electric leakage breaker
Protection Electric thermal device, controlled by microcomputer
Display Items Discharge pressure {digital display}
Pump operation current {digital display}
Voltage {digital display}
Pump operation frequency {digital display}
Power {red LED}
Operation condition {running pump}
Operation mode {Automatic or manual}
Storage tank selection {Tank 1 or 2}
Storage tank water level condition {normal}
System interlock
Failure : Shortage or full of storage tank
Low discharge pressure. *Option: IN-LINE BOOSTING mode
Inverter trip
External output signal Pump running
(No voltage, normal open Pump failure
contact) Storage tank condition {Full, low, shortage}
External input signal System interlock {on/off}
SPECIFICATIONS FOR VARIABLE SPEED PRESSURE BOOSTER UNIT

(No voltage, normal open


contact)
UN
UN

CUSTOM BUILT HYDRO BOOSTER SYSTEM (available upon request)

Applications Product Options Features / Benefits

Inline boosting system consistent pressure.


specially design for: no suction tank required i.e:
automatic water supply direct boosting from suction
system. pipe.
water supply distribution. flexible usage i.e. capable of
integrating with existing.
pumping system with minimal
UN-IB
modification works.

automatic booster system consistent pressure.


for housing estate, reduce storage tank size.
hospitals, condominium empties water effectively to
and high-rise building. process and utilities etc.

UN-GB

golf course irrigation. automatic irrigation of


required capacity and
pressure setting.
economical design.
economy set.

UN-GC

general boosting for automatic boosting system


factories, plant and for large-scale water supply.
booster station. ensure constant pressure.
maintenance free operation.

UN-SP
UN

SELECTION GUIDE

2UN-EVM3
260

240

220

200
UN EVM 22F5/2.2

180

UN EVM 18F5/2.2
160
Total Head (m)

140
UN EVM 15N5/1.5

120
UN EVM 13N5/1.5

100
UN EVM 11N5/1.1

UN EVM 9N5/1.1
80

UN EVM 7N5/0.75
60
UN EVM 6N5/0.75

UN EVM 5N5/0.55
40
UN EVM 4N5/0.55
UN EVM 3N5/0.37
20
UN EVM 2N5/0.37

0 1.5 3 4.5 6 7.5 9


Capacity (m3/hr.)

2UN-EVM5
260

240

220

200

UN EVM 19F5/4.0
180
UN EVM 18F5/4.0

UN EVM 16N5/3.0
160
Total Head (m)

140
UN EVM 14N5/3.0

120
UN EVM 12N5/2.2

UN EVM 11N5/2.2
100
UN EVM 10N5/2.2

80
UN EVM 8N5/1.5

UN EVM 7N5/1.5
60
UN EVM 6N5/1.1

UN EVM 5N5/1.1
40
UN EVM 4N5/0.75

UN EVM 3N5/0.55
20
UN EVM 2N5/0.37

0 2.5 5 7.5 10 12.5 15


Capacity (m3/hr.)
UN

SELECTION GUIDE

2UN-EVM10
260

240

220

200
UN EVM 18F5/7.5

180
UN EVM 16F5/7.5

UN EVM 15F5/5.5
160
Total Head (m)

UN EVM 14N5/5.5

140
UN EVM 12N5/5.5

120
UN EVM 11N5/4.0

UN EVM 10N5/4.0
100

UN EVM 8N5/3.0
80

UN EVM 6N5/2.2
60
UN EVM 5N5/2.2

UN EVM 4N5/1.5
40
UN EVM 3N5/1.1

20 UN EVM 2N5/0.75

0 5 10 15 20 25 30
Capacity (m3/hr.)

2UN-EVM18
260

240

220

200
UN EVM 12F5/11

180

UN EVM 10F5/11
160
Total Head (m)

140

UN EVM 8F5/7.5
120
UN EVM 7F5/7.5

100
UN EVM 6F5/5.5

UN EVM 5F5/5.5
80

UN EVM 4F5/4.0
60

UN EVM 3F5/3.0
40
UN EVM 2F5/2.2

20

0 8 16 24 32 40 48
Capacity (m3/hr.)
UN

SELECTION GUIDE

2UN-EVM32
300

280

260

240

220

200
UN EVM 9-0F5/18.5

UN EVM 9-3F5/18.5
Total Head (m)

180
UN EVM 8-0F5/15
UN EVM 8-3F5/15
160
UN EVM 7-0F5/15
UN EVM 7-3F5/15
140
UN EVM 6-0F5/11

UN EVM 6-3F5/11
120
UN EVM 5-0F5/11

100
UN EVM 5-3F5/11

UN EVM 4-0F5/7.5
80
UN EVM 4-3F5/7.5

UN EVM 3-0F5/5.5
60
UN EVM 3-3F5/5.5

UN EVM 2-0F5/4.0
40
UN EVM 2-2F5/3.0

UN EVM 1-0F5/2.2
20

0 14 28 42 56 70 84
Capacity (m3/hr.)

2UN-EVM45
260

240

220

UN EVM 8-2F5/30
200

UN EVM 7-0F5/30
180
UN EVM 7-2F5/30

UN EVM 6-0F5/22
160
Total Head (m)

UN EVM 6-2F5/22
140
UN EVM 5-0F5/18.5

UN EVM 5-2F5/18.5
120

UN EVM 4-0F5/15
100
UN EVM 4-2F5/15

UN EVM 3-0F5/11
80

UN EVM 3-2F5/11
60
UN EVM 2-0F5/7.5

UN EVM 2-2F5/5.5
40

UN EVM 1-0F5/4.0
20
UN EVM 1-1F5/3.0

0 20 40 60 80 100 120
Capacity (m3/hr.)
UN

SELECTION GUIDE

2UN-EVM64
200
UN EVM 7-1F5/37
UN EVM 7-2F5/37
190
UN EVM 7-3F5/37
180
UN EVM 6-0F5/37
170
UN EVM 6-1F5/37
UN EVM 6-2F5/30
160
UN EVM 6-3F5/30
150
UN EVM 5-0F5/30
140
UN EVM 5-1F5/30
UN EVM 5-2F5/30
130
UN EVM 5-3F5/30
Total Head (m)

120
UN EVM 4-0F5/22

110
UN EVM 4-1F5/22
UN EVM 4-2F5/18.5
100
UN EVM 4-3F5/18.5

90
UN EVM 3-0F5/18.5
UN EVM 3-1F5/15
80
UN EVM 3-2F5/15
70 UN EVM 3-3F5/15

60
UN EVM 2-0F5/11
UN EVM 2-1F5/11
50
UN EVM 2-2F5/7.5
40

30
UN EVM 1-0F5/5.5
UN EVM 1-1F5/4.0
20

10

0 28 56 84 112 140 168


Capacity (m3/hr.)

3UN-EVM3
260

240
UN EVM 26F5/3.0

220

UN EVM 22F5/2.2
200

180
Total Head (m)

UN EVM 18F5/2.2
160

140
UN EVM 15N5/1.5

UN EVM 13N5/1.5
120

UN EVM 11N5/1.1
100

UN EVM 9N5/1.1
80

UN EVM 7N5/0.75
60
UN EVM 6N5/0.75

UN EVM 5N5/0.55
40
UN EVM 4N5/0.55

UN EVM 3N5/0.37
20
UN EVM 2N5/0.37

0 7 14
Capacity (m3/hr.)
UN

SELECTION GUIDE

3UN-EVM5
260

240

220

200
UN EVM 19F5/4.0

UN EVM 18F5/4.0
180
Total Head (m)

UN EVM 16N5/3.0
160

UN EVM 14N5/3.0
140

UN EVM 12N5/2.2
120
UN EVM 11N5/2.2

100 UN EVM 10N5/2.2

UN EVM 8N5/1.5
80
UN EVM 7N5/1.5

UN EVM 6N5/1.1
60
UN EVM 5N5/1.1

UN EVM 4N5/0.75
40
UN EVM 3N5/0.55

UN EVM 2N5/0.37
20

0 5.5 11 16.5 22 27.5 32


Capacity (m3/hr.)

3UN-EVM10
260

240

220

UN EVM 18F5/7.5
200

UN EVM 16F5/7.5
180

UN EVM 15F5/5.5

160
Total Head (m)

UN EVM 14N5/5.5

140
UN EVM 12N5/5.5

UN EVM 11N5/4.0
120
UN EVM 10N5/4.0

100

UN EVM 8N5/3.0
80

UN EVM 6N5/2.2
60
UN EVM 5N5/2.2

UN EVM 4N5/1.5
40
UN EVM 3N5/1.1

UN EVM 2N5/0.75
20

0 7.5 15 22.5 30 37.5 45


Capacity (m3/hr.)
UN

SELECTION GUIDE

3UN-EVM18
260

240

220

200 UN EVM 12F5/11

180

UN EVM 10F5/11
160
Total Head (m)

140

UN EVM 8F5/7.5
120
UN EVM 7F5/7.5

100
UN EVM 6F5/5.5

80 UN EVM 5F5/5.5

UN EVM 4F5/4.0
60

UN EVM 3F5/3.0
40
UN EVM 2F5/2.2

20

0 16 32 48 64 80 96
Capacity (m3/hr.)

3UN-EVM32
300

280

260

240

220

UN EVM 9-0F5/18.5
200
UN EVM 9-3F5/18.5
Total Head (m)

UN EVM 8-0F5/15
180
UN EVM 8-3F5/15

160 UN EVM 7-0F5/15

UN EVM 7-3F5/15
140
UN EVM 6-0F5/11

UN EVM 6-3F5/11
120
UN EVM 5-0F5/11
UN EVM 5-3F5/11
100
UN EVM 4-0F5/7.5
UN EVM 4-3F5/7.5
80

UN EVM 3-0F5/5.5
60 UN EVM 3-3F5/5.5

UN EVM 2-0F5/4.0
40 UN EVM 2-2F5/3.0

UN EVM 1-0F5/2.2
20

0 21 42 63 84 105 126
Capacity (m3/hr.)
UN

SELECTION GUIDE

3UN-EVM45
260

240

220

UN EVM 8-2F5/30
200

UN EVM 7-0F5/30
180
UN EVM 7-2F5/30

UN EVM 6-0F5/22
160
Total Head (m)

UN EVM 6-2F5/22

140
UN EVM 5-0F5/18.5

UN EVM 5-2F5/18.5
120

UN EVM 4-0F5/15
100
UN EVM 4-2F5/15

UN EVM 3-0F5/11
80

UN EVM 3-2F5/11
60
UN EVM 2-0F5/7.5

UN EVM 2-2F5/5.5
40

UN EVM 1-0F5/4.0
20 UN EVM 1-1F5/3.0

0 30 60 90 120 150 180


Capacity (m3/hr.)

3UN-EVM64
210

200
UN EVM 7-1F5/37
UN EVM 7-2F5/37
190
UN EVM 7-3F5/37

180
UN EVM 6-0F5/37
170 UN EVM 6-1F5/37
UN EVM 6-2F5/30
160
UN EVM 6-3F5/30

150
UN EVM 5-0F5/30

140 UN EVM 5-1F5/30


UN EVM 5-2F5/30
Total Head (m)

130 UN EVM 5-3F5/30

120
UN EVM 4-0F5/22
UN EVM 4-1F5/22
110
UN EVM 4-2F5/18.5
100 UN EVM 4-3F5/18.5

90
UN EVM 3-0F5/18.5
UN EVM 3-1F5/15
80
UN EVM 3-2F5/15
UN EVM 3-3F5/15
70

60 UN EVM 2-0F5/11
UN EVM 2-1F5/11
50
UN EVM 2-2F5/7.5

40

30 UN EVM 1-0F5/5.5
UN EVM 1-1F5/4.0
20

10

0 42 84 126 168 210 252


Capacity (m3/hr.)
UN

SELECTION GUIDE

4UN-EVM3
260

240

220

UN EVM 22F5/2.2
200

180

UN EVM 18F5/2.2
160
Total Head (m)

140 UN EVM 15N5/1.5

UN EVM 13N5/1.5
120

UN EVM 11N5/1.1
100

UN EVM 9N5/1.1
80

UN EVM 7N5/0.75
60
UN EVM 6N5/0.75

UN EVM 5N5/0.55
40
UN EVM 4N5/0.55

UN EVM 3N5/0.37
20
UN EVM 2N5/0.37

0 3 6 9 12 15 18
Capacity (m3/hr.)

4UN-EVM5
260

240

220

200
UN EVM 19F5/4.0

UN EVM 18F5/4.0
180
Total Head (m)

UN EVM 16N5/3.0
160

UN EVM 14N5/3.0
140

UN EVM 12N5/2.2
120
UN EVM 11N5/2.2

100 UN EVM 10N5/2.2

UN EVM 8N5/1.5
80
UN EVM 7N5/1.5

UN EVM 6N5/1.1
60
UN EVM 5N5/1.1

UN EVM 4N5/0.75
40
UN EVM 3N5/0.55

UN EVM 2N5/0.37
20

0 5.5 11 16.5 22 27.5 33


Capacity (m3/hr.)
UN

SELECTION GUIDE

4UN-EVM10
260

240

220

UN EVM 18F5/7.5
200

UN EVM 16F5/7.5
180
UN EVM 15F5/5.5

160 UN EVM 14N5/5.5


Total Head (m)

140
UN EVM 12N5/5.5

UN EVM 11N5/4.0
120

UN EVM 10N5/4.0
100

UN EVM 8N5/3.0
80

UN EVM 6N5/2.2
60
UN EVM 5N5/2.2

UN EVM 4N5/1.5
40
UN EVM 3N5/1.1

UN EVM 2N5/0.75
20

0 10 20 30 40 50 60
Capacity (m3/hr.)

4UN-EVM18

260

240

220

200 UN EVM 12F5/11

180

UN EVM 10F5/11
160
Total Head (m)

140
UN EVM 8F5/7.5

120
UN EVM 7F5/7.5

100 UN EVM 6F5/5.5

UN EVM 5F5/5.5
80

UN EVM 4F5/4.0
60
UN EVM 3F5/3.0

40
UN EVM 2F5/2.2

20

0 16 32 48 64 80 96
Capacity (m3/hr.)
UN

SELECTION GUIDE

4UN-EVM32
300

280

260

240

220

UN EVM 9-0F5/18.5
200
UN EVM 9-3F5/18.5
Total Head (m)

UN EVM 8-0F5/15
180
UN EVM 8-3F5/15

160 UN EVM 7-0F5/15


UN EVM 7-3F5/15

140
UN EVM 6-0F5/11
UN EVM 6-3F5/11
120
UN EVM 5-0F5/11

UN EVM 5-3F5/11
100
UN EVM 4-0F5/7.5
UN EVM 4-3F5/7.5
80
UN EVM 3-0F5/5.5
UN EVM 3-3F5/5.5
60

UN EVM 2-0F5/4.0
40 UN EVM 2-2F5/3.0

UN EVM 1-0F5/2.2
20

0 28 56 84 112 140 168


Capacity (m3/hr.)

4UN-EVM45
260

240

220

UN EVM 8-2F5/30
200
UN EVM 7-0F5/30

180 UN EVM 7-2F5/30

UN EVM 6-0F5/22
160
Total Head (m)

UN EVM 6-2F5/22

140
UN EVM 5-0F5/18.5

UN EVM 5-2F5/18.5
120

UN EVM 4-0F5/15

100
UN EVM 4-2F5/15

UN EVM 3-0F5/11
80

UN EVM 3-2F5/11

60
UN EVM 2-0F5/7.5

UN EVM 2-2F5/5.5
40

UN EVM 1-0F5/4.0
UN EVM 1-1F5/3.0
20

0 40 80 120 160 200 240


Capacity (m3/hr.)
UN

SELECTION GUIDE

4UN-EVM64
210

200
UN EVM 7-1F5/37
UN EVM 7-2F5/37
190 UN EVM 7-3F5/37

180
UN EVM 6-0F5/37
170 UN EVM 6-1F5/37

UN EVM 6-2F5/30
160 UN EVM 6-3F5/30

150
UN EVM 5-0F5/30
UN EVM 5-1F5/30
140
UN EVM 5-2F5/30
Total Head (m)

UN EVM 5-3F5/30
130

120
UN EVM 4-0F5/22
UN EVM 4-1F5/22
110
UN EVM 4-2F5/18.5
100 UN EVM 4-3F5/18.5

90 UN EVM 3-0F5/18.5
UN EVM 3-1F5/15
80
UN EVM 3-2F5/15
UN EVM 3-3F5/15
70

60 UN EVM 2-0F5/11
UN EVM 2-1F5/11
50
UN EVM 2-2F5/7.5

40

30 UN EVM 1-0F5/5.5
UN EVM 1-1F5/4.0
20

10

0 56 112 168 224 280 336


Capacity (m3/hr.)

5UN-EVM3
260

240

220

UN EVM 22F5/2.2
200

180

UN EVM 18F5/2.2
160
Total Head (m)

UN EVM 15N5/1.5
140

UN EVM 13N5/1.5
120

UN EVM 11N5/1.1
100

UN EVM 9N5/1.1
80

UN EVM 7N5/0.75
60
UN EVM 6N5/0.75

UN EVM 5N5/0.55
40
UN EVM 4N5/0.55

UN EVM 3N5/0.37
20
UN EVM 2N5/0.37

0 4 8 12 16 20 24
Capacity (m3/hr.)
UN

SELECTION GUIDE

5UN-EVM5
260

240

220

200
UN EVM 19F5/4.0

UN EVM 18F5/4.0
180

UN EVM 16N5/3.0
160
Total Head (m)

UN EVM 14N5/3.0
140

UN EVM 12N5/2.2
120
UN EVM 11N5/2.2

UN EVM 10N5/2.2
100

UN EVM 8N5/1.5
80
UN EVM 7N5/1.5

UN EVM 6N5/1.1
60
UN EVM 5N5/1.1

UN EVM 4N5/0.75
40
UN EVM 3N5/0.55

20 UN EVM 2N5/0.37

0 6.5 13 19.5 26 32.5 39


Capacity (m3/hr.)

5UN-EVM10
260

240

220

UN EVM 18F5/7.5
200

UN EVM 16F5/7.5
180
UN EVM 15F5/5.5

UN EVM 14N5/5.5
160
Total Head (m)

140
UN EVM 12N5/5.5

UN EVM 11N5/4.0
120
UN EVM 10N5/4.0

100
UN EVM 8N5/3.0

80

UN EVM 6N5/2.2
60
UN EVM 5N5/2.2

UN EVM 4N5/1.5
40
UN EVM 3N5/1.1

UN EVM 2N5/0.75
20

0 12.5 25 37.5 50 62.5 75


Capacity (m3/hr.)
UN

SELECTION GUIDE

5UN-EVM18

260

240

220

200
UN EVM 12F5/11

180

UN EVM 10F5/11
160
Total Head (m)

140
UN EVM 8F5/7.5

120
UN EVM 7F5/7.5

UN EVM 6F5/5.5
100

UN EVM 5F5/5.5
80

UN EVM 4F5/4.0
60
UN EVM 3F5/3.0

40
UN EVM 2F5/2.2

20

0 20 40 60 80 100 120
Capacity (m3/hr.)

5UN-EVM32
300

280

260

240

220

UN EVM 9-0F5/18.5
200
UN EVM 9-3F5/18.5

UN EVM 8-0F5/15
Total Head (m)

180
UN EVM 8-3F5/15

UN EVM 7-0F5/15
160
UN EVM 7-3F5/15

140
UN EVM 6-0F5/11
UN EVM 6-3F5/11
120
UN EVM 5-0F5/11

UN EVM 5-3F5/11
100
UN EVM 4-0F5/7.5
UN EVM 4-3F5/7.5
80

UN EVM 3-0F5/5.5
60 UN EVM 3-3F5/5.5
UN EVM 2-0F5/4.0
40 UN EVM 2-2F5/3.0

UN EVM 1-0F5/2.2
20

0 35 70 105 140 175 210


Capacity (m3/hr.)
UN

SELECTION GUIDE

5UN-EVM45
260

240

220

UN EVM 8-2F5/30
200
UN EVM 7-0F5/30

UN EVM 7-2F5/30
180

UN EVM 6-0F5/22
160
Total Head (m)

UN EVM 6-2F5/22

140
UN EVM 5-0F5/18.5

UN EVM 5-2F5/18.5
120
UN EVM 4-0F5/15

100 UN EVM 4-2F5/15

UN EVM 3-0F5/11
80

UN EVM 3-2F5/11
60
UN EVM 2-0F5/7.5

UN EVM 2-2F5/5.5
40

UN EVM 1-0F5/4.0
UN EVM 1-1F5/3.0
20

0 50 100 150 200 250 300


Capacity (m3/hr.)

5UN-EVM64

200 UN EVM 7-1F5/37


UN EVM 7-2F5/37
UN EVM 7-3F5/37
190

180
UN EVM 6-0F5/37
UN EVM 6-1F5/37
170
UN EVM 6-2F5/30
UN EVM 6-3F5/30
160

150
UN EVM 5-0F5/30
UN EVM 5-1F5/30
140
UN EVM 5-2F5/30
UN EVM 5-3F5/30
130
Total Head (m)

120 UN EVM 4-0F5/22


UN EVM 4-1F5/22
110
UN EVM 4-2F5/18.5

100 UN EVM 4-3F5/18.5

90 UN EVM 3-0F5/18.5
UN EVM 3-1F5/15
80
UN EVM 3-2F5/15
UN EVM 3-3F5/15
70

60 UN EVM 2-0F5/11
UN EVM 2-1F5/11
50
UN EVM 2-2F5/7.5

40

30 UN EVM 1-0F5/5.5
UN EVM 1-1F5/4.0
20

10

0 70 140 210 280 350 420


Capacity (m3/hr.)
UN

DIMENSIONAL DRAWING (2UN)

D1 W
'X`
H3

HYDRO BOOSTER

E D TP

MCCB

TANK TANK

DISCHARGE
H2

SUCTION
H1

L1 L2

SIDE VIEW VIEW 'X'

DIMENSION HI H2 H3 D1 W L1 L2 D E TANK SUCTION DISCHARGE PIPE


MODEL mm mm mm mm mm mm mm mm mm LITER MANIFOLD MANIFOLD CONNECTION
mm mm
2UN-EVM 3 75 725 800 250 600 1030 780 350 180 18 50 50 NPT

2UN-EVM 5 75 725 800 250 600 1030 780 350 180 18 50 50 NPT

2UN-EVM 10 100 725 800 250 600 1100 910 390 210 24 65 65 NPT

2UN-EVM 18 100 725 800 250 600 1245 910 440 305 24 80 80 FLANGE

2UN-EVM 32 100 725 800 250 600 1755 910 440 305 100 100 100 FLANGE

2UN-EVM 45 100 725 800 250 600 1865 1200 550 305 100 150 150 FLANGE

2UN-EVM 64 100 725 800 250 600 1865 1200 550 305 100 150 150 FLANGE
UN

DIMENSIONAL DRAWING (3UN)

D1 W

'X`
H3

HYDRO BOOSTER

E D D TP

MCCB

TANK TANK

DISCHARGE
H2

SUCTION
H1

L1 L2

SIDE VIEW VIEW 'X'

DIMENSION HI H2 H3 D1 W L1 L2 D E TANK SUCTION DISCHARGE PIPE


MODEL mm mm mm mm mm mm mm mm mm LITER MANIFOLD MANIFOLD CONNECTION
mm mm
3UN-EVM 3 100 625 900 250 700 1380 780 350 180 18 50 50 NPT

3UN-EVM 5 100 625 900 250 700 1380 780 350 180 18 50 50 NPT

3UN-EVM 10 100 625 900 250 700 1490 910 390 210 24 65 65 NPT

3UN-EVM 18 150 625 900 250 700 1685 910 440 305 24 100 100 FLANGE

3UN-EVM 32 150 625 900 250 700 2195 910 440 305 100 150 150 FLANGE

3UN-EVM 45 150 625 900 250 700 2415 1200 550 305 100 150 150 FLANGE

3UN-EVM 64 150 625 900 250 700 2415 1200 550 305 100 150 150 FLANGE
UN

DIMENSIONAL DRAWING (4UN)

D1 W

'X`

HYDRO BOOSTER
H3

E D D D TP

MCCB

TANK TANK

DISCHARGE
H2

SUCTION
H1

L1 L2

SIDE VIEW VIEW 'X'

DIMENSION HI H2 H3 D1 W L1 L2 D E TANK SUCTION DISCHARGE PIPE


MODEL mm mm mm mm mm mm mm mm mm LITER MANIFOLD MANIFOLD CONNECTION
mm mm
4UN-EVM 3 100 625 900 250 700 1730 780 350 180 18 65 65 NPT

4UN-EVM 5 100 625 900 250 700 1730 780 350 180 18 65 65 NPT

4UN-EVM 10 150 625 900 250 700 1880 910 390 210 24 80 80 FLANGE

4UN-EVM 18 150 625 900 250 700 2125 910 440 305 24 100 100 FLANGE

4UN-EVM 32 150 625 900 250 700 2635 910 440 305 100 150 150 FLANGE

4UN-EVM 45 150 625 900 250 700 2965 1200 550 305 100 200 200 FLANGE

4UN-EVM 64 150 625 900 250 700 2965 1200 550 305 100 200 200 FLANGE
UN

DIMENSIONAL DRAWING (5UN)

D1 W

'X`

HYDRO BOOSTER
H3

E D D D D TP

MCCB

TANK TANK

DISCHARGE
H2

SUCTION
H1

L1 L2

SIDE VIEW VIEW 'X'

DIMENSION HI H2 H3 D1 W L1 L2 D E TANK SUCTION DISCHARGE PIPE


MODEL mm mm mm mm mm mm mm mm mm LITER MANIFOLD MANIFOLD CONNECTION
mm mm
5UN-EVM 3 150 500 1100 250 800 2080 780 350 180 18 80 80 FLANGE

5UN-EVM 5 150 500 1100 250 800 2080 780 350 180 18 80 80 FLANGE

5UN-EVM 10 150 500 1100 250 800 2270 910 390 210 24 100 100 FLANGE

5UN-EVM 18 150 500 1100 250 800 2565 910 440 305 24 150 150 FLANGE

5UN-EVM 32 150 500 1100 250 800 3075 910 440 305 100 200 200 FLANGE

5UN-EVM 45 150 500 1100 250 800 3515 1200 550 305 100 200 200 FLANGE

5UN-EVM 64 150 500 1100 250 800 3515 1200 550 305 100 200 200 FLANGE