The document summarizes the methodology and findings of a structural condition assessment of several sewage treatment plants. It lists 11 STPs and their capacities. Observations from site visits found that the digestor dome roofs at Kasarwadi Phase I, Bhatnagar Chinchwad, and Chikhali STPs were in distressed condition, as was the pump house roof and distribution chamber at Kasarwadi Phase I and Chikhali STP respectively. The walls at these locations were still structurally sound enough to support new membrane roofs. All other newer structures were found to be in good condition.

Uploaded by

samirbendre1
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
203 views4 pages

PCMC-structural Condition Assessment Inception Report

The document summarizes the methodology and findings of a structural condition assessment of several sewage treatment plants. It lists 11 STPs and their capacities. Observations from site visits found that the digestor dome roofs at Kasarwadi Phase I, Bhatnagar Chinchwad, and Chikhali STPs were in distressed condition, as was the pump house roof and distribution chamber at Kasarwadi Phase I and Chikhali STP respectively. The walls at these locations were still structurally sound enough to support new membrane roofs. All other newer structures were found to be in good condition.

Uploaded by

samirbendre1
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 4

1.

Methodology of Condition Assessment

All the sites are visited and structures are visually inspected .

The overall structural system is studied. All visual signs of distress are studied and noted.
Visual observations/distress mapping is carried out as per following procedure.

Following distress is observed specifically

a. Structural cracks
b. Corrosion cracks
c. Spalling of concrete
d. Reinforcement corrosion
e. Reinforcement buckling
f. Leakage
g. Deflection

2. List of structures
A list of structures to be assessed for their structural condition will be prepared. Those
structures which can be hydraulically useful if retained will be investigated.

Capacity
Sr.No STP
(MLD)
1 Chikhali 1 16
2 Chikhali 2 16
3 Akurdi 30
4 Ravet 20
5 Chinchwad Phase I (Bhatnagar) 30

M/s. Tandon Urban Solutions Pvt. Ltd. 1


6 Chinchwad Phase II 30
7 Kasarwadi Phase I 40
8 Kasarwadi Phase II 40
9 Kasarwadi Phase III 40
10 Charholi 21
11 Sangvi Phase I 15
12 Sangvi Phase II (Dapodi) 20
13 Pimple Nilakh 20

3. Observations

Ditress was observed in the following structures and hence they are specifically
mentioned. All the other structures are new and hence in good condition.

Kasarwadi phase I- the roof of digestor domes are in poor condition. The walls
are in good condition and can take load of membrane roof dome. Additional
central column from may be taken from raft slab for membrane support.

Kasarwadi phase I pump house roof is in highly distressed condition. It needs to


be removed and replaced with new

Bhatnagar Chinchwad- digestor dome roofs are in distressed condition. Walls


are ok for taking load of membrane roof load.

Chikhali STP- digestor dome roofs are in distressed condition. Walls are ok for
taking load of membrane roof load.

M/s. Tandon Urban Solutions Pvt. Ltd. 2


Chikhali STP- distribution chamber is in distressed condition. Strengthening will
be necessary.

Kasarwadi phase I pump house roof

Kasarwadi phase I- the roof of digestor dome

M/s. Tandon Urban Solutions Pvt. Ltd. 3


Chikhali STP- distribution chamber

M/s. Tandon Urban Solutions Pvt. Ltd. 4