Production loading into COT 6C 1.2 Maintenance - Routine maintenance of deck and engine department - Marking labels on deck - Preparation for CARSURIN verification - Painting on deck - Collecting garbage into container at laydown area - Assisting surveyor for checking cargo oil pump and stripping pump 1.3 Meetings - Toolbox meeting at 0630 hrs: Review previous day's activities, marking labels on deck, assisting surveyor, renewing items, maintenance works - Supervisory meeting at 1630 hrs: Routine maintenance, painting, garbage collection 1.4 Drills/Training Nil 1.5 Incidents Nil

Uploaded by

nawhi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
39 views27 pages

Vessel'S Midnight Ullage Report

Production loading into COT 6C 1.2 Maintenance - Routine maintenance of deck and engine department - Marking labels on deck - Preparation for CARSURIN verification - Painting on deck - Collecting garbage into container at laydown area - Assisting surveyor for checking cargo oil pump and stripping pump 1.3 Meetings - Toolbox meeting at 0630 hrs: Review previous day's activities, marking labels on deck, assisting surveyor, renewing items, maintenance works - Supervisory meeting at 1630 hrs: Routine maintenance, painting, garbage collection 1.4 Drills/Training Nil 1.5 Incidents Nil

Uploaded by

nawhi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 27

VESSEL'S MIDNIGHT ULLAGE REPORT

VESSEL: FSO SURYA PUTRA JAYA


PRODUCT: OYONG CRUDE OIL

TANK ULLAGE ULLAGE VOLUME VOLUME FREE WATER OIL VOL V.C.F. OIL VOLUME W.C.F
CORRECTED T.O.V. T.O.V. Interface Int. Cor'ed Volume G.O.V. TEMP TEMP API 60 F TABLE 6 @ 60F TABLE 11
NO. m.cm m.cm CU.M. BBLS m.cm m.cm CU.M. VOL.(BBLS) BBLS C F G.S.V. G.S.V. N.S.V.

1C 16.06 15.787 605.697 3,810 Nil 3,810 29.9 85.8 44.7 0.98711 3,761 5.641 3,755 0.12537
2C 17.06 16.797 366.567 2,306 Nil 2,306 29.7 85.5 44.7 0.98726 2,276 4.553 2,272 0.12537
3C 11.21 10.952 2,774.487 17,451 Nil 17,451 31.2 88.2 44.7 0.98591 17,205 25.808 17,179 0.12537
4C 9.98 9.723 3,296.693 20,736 Nil 20,736 31.3 88.3 44.7 0.98586 20,442 30.664 20,412 0.12537
5C 17.08 16.821 422.873 2,660 Nil 2,660 29.8 85.6 44.7 0.98721 2,626 3.939 2,622 0.12537
6C 9.54 9.279 3,476.995 21,870 18.132 17.866 15.866 100 21,770 31.9 89.4 44.7 0.98531 21,450 42.900 21,407 0.12537
7C 14.30 14.043 1,529.562 9,621 Nil 9,621 30.1 86.2 44.7 0.98691 9,495 14.242 9,480 0.12537
8C 9.81 9.556 2,977.543 18,728 Nil 18,728 31.2 88.2 44.7 0.98591 18,464 27.696 18,437 0.12537
SL.P 11.17 10.883 235.473 1,481 15.820 15.533 86.049 541 940 30.3 86.5 44.7 0.98676 927 2.319 925 0.12537
SL.S 9.06 8.756 300.199 1,888 15.225 14.926 103.081 648 1,240 30.3 86.5 44.7 0.98676 1,223 3.059 1,220 0.12537
TOTAL
TOTAL 15,986 100,550 205 1,289 99,261 97,869 97,708
REMARKS: 1,001 54 946 933 930

PRODUCTION LOADING INTO COT 6C

Gross Volume :(T.O.V.) 100,550 Oil Volume @ 60 F :(T.C.V.) 97,869 DRAFT FWD 7.10 m AFT
Less Free Water : 1,289 Less OBQ/ROB :
Oil Volume :(G.O.V.) 99,261 Overall Loaded Vol @ 60 F:
Oil Volume @60F:(G.S.V.) 97,869 Long tons/Metric tons :
Long Tons/Metric Tons : 12,270 12,467 Vessel Experience Factor :
API 60 F : 44.5 Adjusted Volum @ 60 F : Capt. Saiful Bahri
B.S & W. % Vol :. 0.20 Long Tons/Metric Tons : CARGO INSPECTOR
BERTH: OYONG
PORT: OYONG OILFIELD
DATE: 1-Aug-16

WEIGHT W.C.F. WEIGHT


TABLE 13
LT M/T

471.468 0.12738 479.027


285.375 0.12738 289.951
2,157.005 0.12738 2191.587
2,562.860 0.12738 2603.950
329.193 0.12738 334.471
2,689.192 0.12738 2732.307
1,190.353 0.12738 1209.438
2,314.869 0.12738 2351.982
116.269 0.12738 118.133
153.379 0.12738 155.839

12,270 12,467

9.20 m TRIM 2.10 m


LIST NIL

Capt. Boy R. Togas


MASTER
OYONG OPERATORS DAILY REPORT
FSO SURYA PUTRA JAYA 1-Aug-16 @ 2400 HRS

Staff

Surya Putra Jaya Master Capt. Boy Richard Togas Santos Rep. Capt. Saiful Bah

Crude Storage Lifting

24 Hours Total (bbls) 1,001 Last Lifting 17-Ju

BS and W % 0.20 Lifting Vol (bbls) 209,

Storage Gross (bbls) Next Lifting


99,261

Storage Net / G.S.V (Nbbls) 97,869 Next Lifting Vol (bbls)

Storage Net / N.S.V (Nbbls) 97,708

Days to Tank Tops 223 Vessel ETA

Total Crude This Month (Nbbls) 97,869

Water Offtake

Water Received 24hrs (bbls) 54 Offtake 24 Hours (bbls)

Total Water in Cargo (bbls) 1,289

Total P/W Received (bbls) 74,851

Water Drawn off (bbls) 0 Loading/Incoming Temp 40.0

Specific Gravity 0 Storage tanks's temperature 31.9

PFW PH 0
Note: PRODUCTION LOADING INTO COT 6C
OIW Average (mg/I) 10

OIW Peak (mg/I) 0

Non Regulated Waste

Category Vol (m3) Kg Comments

Soft Waste 0 0

Non Metal Waste 0.0 0

Metal Waste 0 0

Regulated Waste
Category Vol (m3) Kg Comments

Solid Hazardous Waste 0 0

Solid Hazardous From Process 0 0

Liquid Chemical Waste 0 0

Biological Waste 0 0

Liquid Hazardous Waste (Oil) 0 0

SMF (Synthetic Mineral Fibre) 0 0

Note :
OYONG OPERATORS DAILY REPORT

Fuel
FSO-MFO FSO-MDO Service Vessel
MDO

Opening (m3) 307,062 ### 91,199 0

Received / Bunkered (m3) 0 0 0


###
Consumption (m3) 4,500 2,214

Closing (m3) 302,562 88,985 0

Supply Remaining (days)

Remarks :

Meetings

Type Time Comment

1. Review previous day activity


2. Marking label on deck
3. Assist indospec surveyor for check Cargo Oil Pump
4. Renew sofa cover crew mess room
5. Renew vacuum valve COT 6C
6. Painting catwalk port main deck
7. Preparation boiler for assist indospec surveyor check ca
8. Maintenance RO No.2
9. Fabrication CO2 portable fire extinguisher laundry area
Tool box meeting 06.30
compressor cover

1. Deck and Engine Dept. routine maintenance


2. Marking label on deck
3. Preparation CARSURIN verification
4. painting on deck
Supervisory Meeting 16.30 5. Collecting garbage into garbage container at laydown
6. Assist indospec surveyor for check Cargo Oil Pump and
Incidents

Type Reference Comments


NIL

Drills
Type Time Com

S.T.O.P. Audit program

Observation Card Report : 2


1. Pressure gauge discharging not insatall 08.30 LT Cannot detection pressure ( Closed )
### 2. Pipe pressure fresh water line leaking 09.15 LT Replacing leaky pipes ( Closed )
Capt. Saiful Bahri

17-Jun-16

209,560

deg C

deg C

O COT 6C

21371 / 97672
e Vessel

Comment

Cargo Oil Pump

c surveyor check cargo oil pump running

uisher laundry area and fly wheel emergency

ntenance

tainer at laydown
Cargo Oil Pump and Stripping pump
Comment

( Closed )
osed )
FSO SURYA PUTRA JAYA - DAILY ACTIVITY REPORT

1. LOG OF EVENT 24 HOURS


1.1 Operations
Cargo operations :
PRODUCTION LOADING INTO COT 6C
08.00: Line Up
08.18: Start cargo pump No.1
08.26: Start ballast pump
11.10: Finish cargo pump No.1
11.15: Start cargo pump No. 2
14.07: Finish cargo pump N0. 2
14.15: Start cargo pump NO. 3
17.25: Finish cargo pump No. 3
17.40: Completed

Mooring/Unmooring :
19.12: Pb. Sarah splash port alongside
22.12: Pb. Sarah splash cast off

Bunkering/Debunkering :
NIL

Personnel & Material Transfer :


07.20: 1 Person SKK Migas, 1 Person Nalco by. KST.51 ( Out )
07.22: 1 Person Inca, 2 Person Oryx by. KST.51 ( In )
09.45: 1 Document Cb. Adventurer 1 by. Cb.Adventurer 1 ( Out )
09.46: 1 Document Cb. Adventurer 1 by. Cb. Adventurer 1 ( In )
16.45: 1 Manhole cover seagood by. KST.51 ( Out )
16.46: 1 Person Inca, 2 Person Oryx by. KST.51 ( Out )

1.2 Planned/Unplanned Maintenance


DECK :
1. Assist transferred SKK MIGAS and Contractor personnel
2. Assist INDOSPEC surveyor for check Cargo Oil Pump
3. Marked label on deck
4. Renewed sofa cover crew mess room
5. Painted catwalk port main deck
6. Re Installed vacuum valve COT 6C
7. Transferred materials sea good to KST.51
8. De ballasting

ENGINE :
1. Replaced 3 way valve and renewed fine filter RO No.2
2. Assist INDOSPEC surveyor for check Cargo Oil Pump
3. Fabricated scupper drain pipe
4. Fabricated CO2 portable fire extinguisher laundry area and fly wheel emergency compressor cover
5. Running up A/E No. 2 & 3 for:
06.00 - 18.00: - Cargo Oil Pump Running for INDOSPEC surveyor check
- Transferred materials sea good to KST.51

2. PERMIT TO WORK PW MW HW CSE IP VAL


349 1210 326 141 7 679
2.1 J HA 349 1210 326 141 5 679
3. BUNKERS(M3) CONS RCVD
M.F.O 4,500 0
M.D.O 2,214 0
4. FRESH WATER (MT) CONS RCV TRNSF PROD
BLR 10 0 0 0
DOM 7 0 0 6
5. DISPERSANT, FOAM, CHEMICALS (LTRS) OSD REC CONS
REASON FOR USE 200 0 0
6. POB IN OUT
3 5
MAN HOURS ( POB X 12 HRS )
Previous man hours 166464 Days W/O LTI 977 Since 28-Nov-13
Man hours today 276
Total man hours 166740
Safe man hours 166740
7. EHS INCIDENT AND STATISTIC REPORTING
ITEM IMS Number
First Aid Cases
Medical Treatment Injury
Lost time - Injury
Near Misses
Toolbox and Safety Meetings `
Observations card report
Incidents
Environmental Incident
Safety Inductions
Note :
Toolbox meeting conducted by Master, Chief Officer and Chief Engineer with deck / engine crew.
8. DRILLS/EXERCISES

9. EHS AUDIT/INSPECTION

10. ISSUES WITH LOCAL COMMUNITY

11. VESSEL ARRIVAL/DEPARTURE

12. ON BOARD TRAINING / SAFETY MOVIE / OTHERS


01-AUG-16 @2400 HRS

`
TOTAL
2712
2710
TRANS ROB
0 302,562
0 88,985
ROB `
80
150
ROB
200
POB
25

28-Nov-13

Previous Today Total


0 0 0
0 0 0
0 0 0
0 0 0
1284 2 1286
578 2 580
3 0 3
0 0 0
1279 0 1279

NIL

NIL

NIL

NIL

NIL
FUEL STATUS REPORT

Vessel Name FSO. SURYA PUTRA JAYA


Period Aug-16

MDO

Opening A/E A/E A/E Closing


Receive Transfer Cons. Adj.
Date Balance No.1 No.2 No.3 Balance Remarks
( Ltr ) ( Ltr ) ( Ltr ) ( Ltr ) ( Ltr ) (Hrs) (Hrs) (Hrs) ( Ltr )
01 91,199 0 0 2,214 0 0.0 24.0 12.0 88,985 Indospec surveyor check
18 16

NIL

NIL
FUEL STATUS REPORT

Vessel Name FSO. SURYA PUTRA JAYA


Period Aug-16

MFO

Opening Closing
Receive Transfer Consumption Adjusment
Date Balance Balance Remarks
( Ltr ) ( Ltr ) ( Ltr ) ( Ltr ) ( Ltr ) ( Ltr )
01 307,062 0 0 4,500 0 302,562 Indospec Surveyor Check
LOG SHEET DOMESTIC & SANITARY WASTE WATER

Vessel Name FSO. SURYA PUTRA JAYA


Periode 2016

Quantity Domestic Waste Water ( M3 )


Date
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
1 11 12 12 11 10 14 11 12
2 10 10 12 13 10 12 12
3 14 14 13 11 12 13 11
4 13 13 12 14 11 11 13
5 12 11 11 12 13 13 12
6 11 13 13 12 13 11 11
7 14 14 13 10 14 12 11
8 13 12 12 10 14 12 12
9 10 13 14 11 13 13 12
10 11 14 14 14 13 11 11
11 11 14 14 13 12 12 13
12 14 12 13 13 14 12 12
13 10 13 14 11 11 11 11
14 10 14 13 11 11 12 12
15 12 13 14 12 13 13 13
16 13 14 12 12 13 14 13
17 10 11 14 11 14 14 11
18 11 13 14 14 14 11 13
19 12 12 12 13 12 11 12
20 14 11 13 13 11 12 13
21 10 13 12 12 14 11 12
22 12 12 13 12 12 11 12
23 11 12 14 14 12 13 10
24 12 14 12 11 10 11 10
25 14 13 11 12 11 14 11
26 13 14 13 12 13 12 11
27 12 12 10 11 14 12 12
28 14 11 12 11 13 11 12
29 12 14 11 13 11 12 11
30 14 14 12 13 12 12
31 13 12 12 11

TOTAL 373 368 393 361 383 363 363 12 0 0 0 0


LOG SHEET DOMESTIC & SANITARY WASTE WATER

Vessel Name FSO. SURYA PUTRA JAYA


Periode 2016

Quantity Sanitary Waste Water ( M3 )


Date
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
1 7 8 8 7 7 8 8 8
2 8 7 8 7 7 8 8
3 8 8 8 8 8 7 8
4 7 8 8 8 8 8 7
5 8 8 7 8 8 8 8
6 8 8 8 7 7 8 7
7 7 8 8 7 8 7 8
8 8 7 8 8 8 8 8
9 8 8 8 7 8 8 8
10 8 8 8 8 7 7 7
11 8 8 8 8 8 8 8
12 8 8 8 8 8 8 8
13 7 8 7 7 8 8 8
14 8 8 8 8 7 8 8
15 7 8 8 8 8 8 8
16 7 8 8 8 8 8 7
17 8 7 8 7 8 8 8
18 8 8 8 8 8 7 8
19 8 8 8 8 7 8 8
20 8 8 7 7 8 8 8
21 7 7 8 7 8 8 8
22 8 8 8 8 7 8 7
23 8 8 8 8 8 8 7
24 8 8 8 7 7 7 7
25 8 8 8 7 8 8 8
26 8 8 7 8 8 8 7
27 7 8 7 8 8 8 8
28 8 7 7 8 8 7 8
29 8 8 8 7 7 8 7
30 8 8 7 8 8 8
31 8 8 8 8

TOTAL 240 227 242 227 239 234 239 8 0 0 0 0


LOG SHEET COOLING WATER

Vessel Name FSO. SURYA PUTRA JAYA


Periode 2016

Quantity Cooling Water Discharge ( M3 )


Date
JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC
1 4,952 4,977 4,963 4,977 4,942 4,980 4,969 4,951
2 4,938 4,956 4,971 4,945 4,981 4,975 4,974
3 4,973 4,962 4,969 4,952 4,975 4,982 4,970
4 4,961 4,971 4,967 4,961 4,965 4,968 4,977
5 4,946 4,968 4,970 4,988 4,931 4,972 4,969
6 4,927 4,955 4,972 4,959 4,929 4,975 4,965
7 4,938 4,962 4,968 4,935 4,942 4,973 4,968
8 4,981 4,966 4,977 4,964 4,983 4,969 4,971
9 4,972 4,959 4,975 4,972 4,957 4,968 4,970
10 4,963 4,957 4,968 4,951 4,975 4,977 4,968
11 4,959 4,963 4,973 4,974 4,981 4,975 4,972
12 4,945 4,968 4,975 4,967 4,939 4,969 4,971
13 4,937 4,961 4,972 4,931 4,968 4,971 4,974
14 4,962 4,966 4,969 4,925 4,975 4,975 4,969
15 4,976 4,971 4,970 4,982 4,952 4,970 4,972
16 4,948 4,967 4,968 4,943 4,981 4,982 4,970
17 4,952 4,959 4,966 4,954 4,949 4,968 4,971
18 4,928 4,967 4,971 4,958 4,975 4,969 4,977
19 4,942 4,960 4,977 4,951 4,935 4,973 4,968
20 4,965 4,965 4,975 4,985 4,991 4,970 4,975
21 4,928 4,963 4,970 4,976 4,972 4,975 4,970
22 4,951 4,961 4,969 4,972 4,958 4,977 4,952
23 4,972 4,966 4,973 4,961 4,978 4,971 4,945
24 4,938 4,972 4,974 4,972 4,984 4,977 4,962
25 4,944 4,968 4,982 4,931 4,975 4,974 4,980
26 4,958 4,962 4,958 4,983 4,963 4,970 4,971
27 4,967 4,951 4,981 4,925 4,961 4,968 4,981
28 4,935 4,966 4,963 4,971 4,964 4,971 4,975
29 4,951 4,958 4,972 4,964 4,960 4,968 4,965
30 4,962 4,957 4,937 4,972 4,972 4,951
31 4,958 4,981 4,969 4,967

TOTAL 153,529 143,947 154,096 148,766 153,882 149,184 154,039 4,951 0 0 0 0

Averag
e/Day 4,953 5,141 4,971 4,959 4,964 4,973 4,969 160 0 0 0 0
LOG SHEET RESERVOIR OSMOSIS WASTE WATER

Vessel Name FSO. SURYA PUTRA JAYA


Periode 2016

Quantity R.O Waste Water ( M3 )


Date
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
1 130 65 25 140 95 50 45 30
2 30 80 90 105 60 45 50
3 130 125 105 140 70 50 70
4 40 120 35 115 55 85 80
5 75 125 95 135 80 65 135
6 40 70 120 120 120 55 70
7 125 100 95 125 120 115 85
8 100 75 115 140 125 110 110
9 110 85 90 70 105 115 105
10 135 85 105 135 85 120 100
11 120 65 75 120 105 115 75
12 80 105 90 155 115 120 55
13 50 110 110 60 105 80 45
14 125 90 75 100 95 95 40
15 120 60 85 70 40 145 45
16 95 95 75 60 75 75 45
17 115 80 85 80 80 40 55
18 100 95 100 110 65 60 50
19 105 100 55 120 20 125 55
20 145 95 125 125 75 135 105
21 95 85 105 120 115 145 110
22 120 100 135 115 70 85 90
23 110 70 120 100 105 75 90
24 80 50 130 95 100 80 75
25 105 25 120 60 60 115 45
26 115 70 130 115 100 55 50
27 100 70 155 115 85 40 85
28 110 75 125 110 95 45 85
29 105 95 145 65 90 55 85
30 145 135 80 75 45 30
31 100 150 70 50

TOTAL 3,155 2,465 3,200 3,200 2,655 2,540 2,215


DATA PERSONNEL ON BOARD

VESSEL : FSO SURYA PUTRA JAYA


MONTH OF : AUG 2016

DATE CREW SPJ SANTOS VISITOR/KONTRAKTOR DAILY TOTAL REMARKS


1-Aug-2016 23 1 1 25

TOTAL 23 1 1 25