0% found this document useful (0 votes)
35 views29 pages

Vessel'S Midnight Ullage Report

The midnight ullage report of the FSO Surya Putra Jaya lists the volume measurements of 8 cargo tanks containing Oyong crude oil. Tank volumes ranged from 262 to 5,594 cubic meters. No free water was reported in any tank. Total oil volume was 204,248 barrels with 0.22% BS&W. The daily report notes 888 barrels of oil received in the last 24 hours, no offloading, and storage levels and temperatures. Meetings were held to review activities, safety equipment testing, and routine maintenance.

Uploaded by

nawhi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
35 views29 pages

Vessel'S Midnight Ullage Report

The midnight ullage report of the FSO Surya Putra Jaya lists the volume measurements of 8 cargo tanks containing Oyong crude oil. Tank volumes ranged from 262 to 5,594 cubic meters. No free water was reported in any tank. Total oil volume was 204,248 barrels with 0.22% BS&W. The daily report notes 888 barrels of oil received in the last 24 hours, no offloading, and storage levels and temperatures. Meetings were held to review activities, safety equipment testing, and routine maintenance.

Uploaded by

nawhi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 29

VESSEL'S MIDNIGHT ULLAGE REPORT

VESSEL: FSO SURYA PUTRA JAYA


PRODUCT: OYONG CRUDE OIL

TANK ULLAGE ULLAGE VOLUME VOLUME FREE WATER OIL VOL V.C.F. OIL VOLUME W.C.F
CORRECTED T.O.V. T.O.V. Interface Int. Cor'ed Volume G.O.V. TEMP TEMP API 60 F TABLE 6 @ 60F TABLE 11
NO. m.cm m.cm CU.M. BBLS m.cm m.cm CU.M. VOL.(BBLS) BBLS C F G.S.V. G.S.V. N.S.V.

1C 10.600 10.291 1,973.792 12,415 trace 12,415 30.4 86.7 43.4 0.98695 12,253 21.932 12,231 0.12630
2C 15.941 15.634 785.103 4,938 trace 4,938 32.0 89.6 43.4 0.98550 4,867 10.706 4,856 0.12630
3C 4.283 3.976 5,594.152 35,186 trace 35,186 30.4 86.7 43.4 0.98695 34,727 62.509 34,664 0.12630
4C 4.810 4.504 5,420.805 34,096 trace 34,096 31.0 87.8 43.4 0.98640 33,632 60.538 33,572 0.12630
5C 4.928 4.622 5,385.286 33,872 trace 33,872 30.5 86.9 43.4 0.98685 33,427 56.826 33,370 0.12630
6C 10.077 9.771 3,276.703 20,610 17.829 17.523 140.965 887 19,723 30.8 87.4 43.4 0.98660 19,459 42.810 19,416 0.12630
7C 4.737 4.431 5,420.321 34,093 18.172 17.866 19.211 121 33,972 32.0 89.6 43.4 0.98550 33,479 56.915 33,422 0.12630
8C 4.791 4.485 4,814.616 30,283 trace 30,283 30.5 86.9 43.4 0.98685 29,885 50.804 29,834 0.12630
SL.P 10.354 10.040 262.582 1,652 14.719 14.405 122.303 769 882 30.4 86.7 43.4 0.98695 871 2.438 868 0.12630
SL.S 8.283 7.966 325.475 2,047 trace 2,047 30.5 86.9 43.4 0.98685 2,020 5.657 2,015 0.12630
TOTAL
TOTAL 33,259 209,192 282 1,777 207,415 204,619 204,248
REMARKS: 888 65 823 811 809

: PRODUCTION LOADING INTO COT 6C

Gross Volume :(T.O.V.) 209,192 Oil Volume @ 60 F :(N.S.V.) 204,248 DRAFT FWD 9.90 m AFT
Less Free Water : 1,777 Less OBQ/ROB :
Oil Volume :(G.O.V.) 207,415 Overall Loaded Vol @ 60 F:
Oil Volume @60F:(G.S.V.) 204,619 Long tons/Metric tons :
Long Tons/Metric Tons : 25,843 26,259 Vessel Experience Factor :
API 60 F : 43.4 Adjusted Volum @ 60 F : Capt. Saiful Bahri
B.S & W. % Vol :. 0.22 Long Tons/Metric Tons : CARGO INSPECTOR
BERTH: OYONG
PORT: OYONG OILFIELD
DATE: 16-Apr-16

WEIGHT W.C.F. WEIGHT


TABLE 13
LT M/T

1,547.524 0.12833 1572.397


614.645 0.12833 624.524
4,386.016 0.12833 4456.512
4,247.738 0.12833 4316.012
4,221.831 0.12833 4289.688
2,457.660 0.12833 2497.161
4,228.444 0.12833 4296.407
3,774.450 0.12833 3835.116
109.983 0.12833 111.751
255.158 0.12833 259.259

25,843 26,259

10.30 m TRIM 0.40 m


LIST NIL

Capt. Boy R. Togas


MASTER
OYONG OPERATORS DAILY REPORT
FSO SURYA PUTRA JAYA 16-Apr-16 @ 2400 HRS

Staff

Surya Putra Jaya Master Capt. Boy R Togas Santos Rep. Capt. Saiful Bahr

Crude Storage Lifting

24 Hours Total (bbls) 888 Last Lifting 25-No

BS and W % 0.22 Lifting Vol (bbls) 228,952

Storage Gross (bbls) Next Lifting


207,415 N/A

Storage Net / G.S.V (Nbbls) 204,619 Next Lifting Vol (bbls) N/A

Storage Net / N.S.V (Nbbls) 204,248

Days to Tank Tops 281 Vessel ETA N/A

Total Crude This Month (Nbbls) 204,619

Water Offtake

Water Received 24hrs (bbls) 65 Offtake 24 Hours (bbls) 0

Total Water in Cargo (bbls) 1,777

Total P/W Received (bbls) 69,113

Water Drawn off (bbls) 0 Loading/Incoming Temp 40.0

Specific Gravity 0 Storage tanks's temperature 30.8

PFW PH 0
Note: PRODUCTION LOADING INTO COT 6C
OIW Average (mg/I) 10.4

OIW Peak (mg/I) 0

Non Regulated Waste

Category Vol (m3) Kg Comments

Soft Waste 0 0

Non Metal Waste 0.0 0

Metal Waste 0 0

Regulated Waste
Category Vol (m3) Kg Comments

Solid Hazardous Waste 0 0

Solid Hazardous From Process 0 0

Liquid Chemical Waste 0 0

Biological Waste 0 0

Liquid Hazardous Waste (Oil) 0 0

SMF (Synthetic Mineral Fibre) 0 0


OYONG OPERATORS DAILY REPORT

Fuel
FSO-MFO FSO-MDO Service Vessel
MDO

Opening (m3) 357,742 ###61,941 0

Received / Bunkered (m3) 0 0 0


###
Consumption (m3) 0 1,324

Closing (m3) 357,742 60,617 0

Supply Remaining (days)

Remarks :

Meetings

Type Time Comment

1. Review previous day activity


2. Weekly test LSA and FFA equipment
3. Final coating Main deck at COT 5C area
4. Weekly test lifeboat engine
5. Final coating catwalk
6. Work place inspection on deck
7. Weekly test Navigation / GMDSS equipment
8. Garbage collection in to garbage container at lay down
Tool box meeting 06.30 9. House keeping
10. Check and repair AC accommodation
11. Install PVC pipe line for fresh water supply to galley roo
12. Welding both Anchor Wash Pipe
13. House keeping in engine room
14. Garbage collection in engine room in to garbage conta
15. Weekly test safety device and emergency machinery

1. Deck and engine Dept. routine maintenance


2. EHS and Security re induction to all crew
3. Review the work place inspection
4. Ship drill and safety learn
Supervisory Meeting 16.30
Incidents

Type Reference Comments


NIL

Drills
Type Time Comme

S.T.O.P. Audit program

Hazard Observation Card : 4


1. light cover at poop deck there is no 09.00 Can cause electrical shor
### 2. Renewed nipple grease at main deck COT 8C area 10.00 Can cause property damag
3. Installed platform export hose bolts at laydown 10.00 Can cause property loos (
4. Handle installation in garbage containers 10.00 Difficulties when opening
Capt. Saiful Bahri

25-Nov-15

bbls

N/A

N/A

N/A

deg C

deg C

O COT 6C

19116 / 204220
e Vessel

Comment

nt
C area

equipment
ontainer at lay down

ation
er supply to galley room

m in to garbage container at lay down


mergency machinery

ntenance
ll crew
Comment

ause electrical short circuit ( Progress )


use property damage ( Closed )
ause property loos ( Closed )
lties when opening and closing the lid ( Closed )
FSO SURYA PUTRA JAYA - DAILY ACTIVITY REPORT 16-AP

1. LOG OF EVENT 24 HOURS


1.1 Operations
Cargo operations :
PRODUCTION LOADING IN TO COT 6C

Mooring/Unmooring :
12.00: TB. KST.51 portside alongside
17.12: TB. KST.51 cast off

Bunkering/Debunkering :
12.12: Commenced transfer FW to TB. KST.51
17.00: Completed transfer FW to TB. KST.51 = 50T

Personnel & Material Transfer :


08.36: 1 Person Nalco by. KST.51 ( In )
17.05: 1 Person Nalco by. KST.51 ( Out )

1.2 Planned/Unplanned Maintenance


DECK :
1. Assist transferred Nalco Personnel
2. Weekly test LSA and FFA equipment
3. Weekly test Navigation / GMDSS equipment
4. Tested over fill level alarm COT
5. Final coating Main deck at COT 5C area
6. Work place inspection on deck
7. Garbage collection in to garbage container at lay down
8. Final coating catwalk at cot 4C area (main deck starboard side)
9. Installed garbage container cover handle ( category 3 )
10. Renewed hose handling platform bolt and nuts
ENGINE :
1. Repaired AC accommodation expansion valve
2. Weekly test lifeboat engine
3. Weekly test safety device and emergency machinery
4. Installed PVC pipe line for fresh water supply to galley room
5. Garbage collection in engine room in to garbage container at lay down
6. House keeping in engine room
7. Megger test all electrical equipment
8. Welding both Anchor Wash Pipe in engine room workshop.
9. Running up 2 A/E:
07.30 - 08.30: Open garbage container lid
11.00 - 12.00: Close garbage container lid

2. PERMIT TO WORK PW MW HW CSE IP VAL


317 965 294 132 7 508
2.1 J HA 317 965 294 132 5 508
3. BUNKERS(M3) CONS RCVD
M.F.O 0 0
M.D.O 1,324 0
4. FRESH WATER (MT) CONS RCV TRNSF PROD
BLR 0 0 0 0
DOM 10 0 50 12
5. DISPERSANT, FOAM, CHEMICALS (LTRS) OSD REC CONS
REASON FOR USE 200 0 0
6. POB IN OUT
1 1
MAN HOURS ( POB X 12 HRS )
Previous man hours 136276 Days W/O LTI 870 Since 28-Nov-13
Man hours today 300
Total man hours 136576
Safe man hours 136576
7. EHS INCIDENT AND STATISTIC REPORTING
ITEM IMS Number
First Aid Cases
Medical Treatment Injury
Lost time - Injury
Near Misses
Toolbox and Safety Meetings `
Hazard observations
Incidents
Environmental Incident
Safety Inductions
Note :
Toolbox meeting conducted by Master, Chief Officer and Chief Engineer with deck / engine crew.
8. DRILLS/EXERCISES

9. EHS AUDIT/INSPECTION

10. ISSUES WITH LOCAL COMMUNITY

11. VESSEL ARRIVAL/DEPARTURE

12. ON BOARD TRAINING / SAFETY MOVIE / OTHERS


16-APRIL-16 @2400 HRS

TOTAL
2223
2221
TRANS ROB
0 357,742
0 60,617
ROB `
80
150
ROB
200
POB
25

28-Nov-13

Previous Today Total


0 0 0
0 0 0
0 0 0
0 0 0
1278 2 1280
802 4 806
3 0 3
0 0 0
1134 0 1134

NIL

NIL

NIL

NIL

NIL
FUEL STATUS REPORT

Vessel Name FSO. SURYA PUTRA JAYA


Period Apr-16

MDO

Opening A/E A/E A/E Closing


Receive Transfer Cons. Adj.
Date Balance No.1 No.2 No.3 Balance Remarks
( Ltr ) ( Ltr ) ( Ltr ) ( Ltr ) ( Ltr ) (Hrs) (Hrs) (Hrs) ( Ltr )
01 82,988 0 0 1,358 0 24.0 2.5 0.0 81,630
02 81,630 0 0 1,373 0 24.0 3.5 0.0 80,257
03 80,257 0 0 1,320 0 24.0 0.0 0.0 78,937
04 78,937 0 0 1,365 0 24.0 3.0 0.0 77,572
Internal cargo transfer
05 77,572 0 0 1,629 0 9.5 24.0 0.0 75,943 and De ballasting

06 75,943 0 0 1,335 0 1.0 24.0 0.0 74,608

07 74,608 0 0 1,422 0 0.0 24.0 9.0 73,186


08 73,186 0 0 1,401 0 0.0 24.0 7.5 71,785
09 71,785 0 0 1,373 0 3.5 24.0 0.0 70,412
10 70,412 0 0 1,350 0 2.0 24.0 0.0 69,062
Cargo heating COT 2C
11 69,062 0 0 1,566 0 5.0 0.0 24.0 67,496 and 6C
12 67,496 0 0 1,445 0 3.5 0.0 24.0 66,051 Stripping line
13 66,051 0 0 1,380 0 4.0 0.0 24.0 64,671
14 64,671 0 0 1,365 0 3.0 0.0 24.0 63,306
15 63,306 0 0 1,365 0 3.0 0.0 24.0 61,941
16 61,941 0 0 1,324 0 2.0 0.0 24.0 60,617
17
18
19
20
21
22
23
24
25
26
27
28
29
30
18 16

NIL

NIL
Remarks

nal cargo transfer


d De ballasting

o heating COT 2C
and 6C
tripping line
FUEL STATUS REPORT

Vessel Name FSO. SURYA PUTRA JAYA


Period Apr-16

MFO

Opening Closing
Receive Transfer Consumption Adjusment
Date Balance Balance Remarks
( Ltr ) ( Ltr ) ( Ltr ) ( Ltr ) ( Ltr ) ( Ltr )
01 361,319 0 0 0 0 361,319
02 361,319 0 0 0 0 361,319
03 361,319 0 0 0 0 361,319
04 361,319 0 0 0 0 361,319
Internal cargo transfer and
05 361,319 0 0 2,552 0 358,767 De ballasting
06 358,767 0 0 0 0 358,767

07 358,767 0 0 0 0 358,767
08 358,767 0 0 0 0 358,767
09 358,767 0 0 0 0 358,767
10 358,767 0 0 0 0 358,767
Cargo Heating COT 2C and
11 358,767 0 0 805 0 357,962 6C
12 357,962 0 0 220 0 357,742 Stripping line
13 357,742 0 0 0 0 357,742
14 357,742 0 0 0 0 357,742
15 357,742 0 0 0 0 357,742
16 357,742 0 0 0 0 357,742
17
18
19
20
21
22
23
24
25
26
27
28
29
30
LOG SHEET DOMESTIC & SANITARY WASTE WATER

Vessel Name FSO. SURYA PUTRA JAYA


Periode 2016

Quantity Domestic Waste Water ( M3 )


Date
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
1 11 12 12 11
2 10 10 12 13
3 14 14 13 11
4 13 13 12 14
5 12 11 11 12
6 11 13 13 12
7 14 14 13 10
8 13 12 12 10
9 10 13 14 11
10 11 14 14 14
11 11 14 14 13
12 14 12 13 13
13 10 13 14 11
14 10 14 13 11
15 12 13 14 12
16 13 14 12 12
17 10 11 14
18 11 13 14
19 12 12 12
20 14 11 13
21 10 13 12
22 12 12 13
23 11 12 14
24 12 14 12
25 14 13 11
26 13 14 13
27 12 12 10
28 14 11 12
29 12 14 11
30 14 14
31 13 12

TOTAL 373 368 393 190 0 0 0 0 0 0 0 0


LOG SHEET DOMESTIC & SANITARY WASTE WATER

Vessel Name FSO. SURYA PUTRA JAYA


Periode 2016

Quantity Sanitary Waste Water ( M3 )


Date
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
1 7 8 8 7
2 8 7 8 7
3 8 8 8 8
4 7 8 8 8
5 8 8 7 8
6 8 8 8 7
7 7 8 8 7
8 8 7 8 8
9 8 8 8 7
10 8 8 8 8
11 8 8 8 8
12 8 8 8 8
13 7 8 7 7
14 8 8 8 8
15 7 8 8 8
16 7 8 8 8
17 8 7 8
18 8 8 8
19 8 8 8
20 8 8 7
21 7 7 8
22 8 8 8
23 8 8 8
24 8 8 8
25 8 8 8
26 8 8 7
27 7 8 7
28 8 7 7
29 8 8 8
30 8 8
31 8 8

TOTAL 240 227 242 122 0 0 0 0 0 0 0 0


LOG SHEET COOLING WATER

Vessel Name FSO. SURYA PUTRA JAYA


Periode 2016

Quantity Cooling Water Discharge ( M3 )


Date
JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC
1 4,952 4,977 4,963 4,977
2 4,938 4,956 4,971 4,945
3 4,973 4,962 4,969 4,952
4 4,961 4,971 4,967 4,961
5 4,946 4,968 4,970 4,988
6 4,927 4,955 4,972 4,959
7 4,938 4,962 4,968 4,935
8 4,981 4,966 4,977 4,964
9 4,972 4,959 4,975 4,972
10 4,963 4,957 4,968 4,951
11 4,959 4,963 4,973 4,974
12 4,945 4,968 4,975 4,967
13 4,937 4,961 4,972 4,931
14 4,962 4,966 4,969 4,925
15 4,976 4,971 4,970 4,982
16 4,948 4,967 4,968 4,943
17 4,952 4,959 4,966
18 4,928 4,967 4,971
19 4,942 4,960 4,977
20 4,965 4,965 4,975
21 4,928 4,963 4,970
22 4,951 4,961 4,969
23 4,972 4,966 4,973
24 4,938 4,972 4,974
25 4,944 4,968 4,982
26 4,958 4,962 4,958
27 4,967 4,951 4,981
28 4,935 4,966 4,963
29 4,951 4,958 4,972
30 4,962 4,957
31 4,958 4,981

TOTAL 153,529 143,947 154,096 79,326 0 0 0 0 0 0 0 0

Averag
e/Day 4,953 5,141 4,971 2,644 0 0 0 0 0 0 0 0
LOG SHEET RESERVOIR OSMOSIS WASTE WATER

Vessel Name FSO. SURYA PUTRA JAYA


Periode 2016

Quantity R.O Waste Water ( M3 )


Date
JAN FEB MAR APR MAY JUN
1 130 65 25 140
2 30 80 90 105
3 130 125 105 140
4 40 120 35 115
5 75 125 95 135
6 40 70 120 120
7 125 100 95 125
8 100 75 115 140
9 110 85 90 70
10 135 85 105 135
11 120 65 75 120
12 80 105 90 155
13 50 110 110 60
14 125 90 75 100
15 120 60 85 70
16 95 95 75 60
17 115 80 85
18 100 95 100
19 105 100 55
20 145 95 125
21 95 85 105
22 120 100 135
23 110 70 120
24 80 50 130
25 105 25 120
26 115 70 130
27 100 70 155
28 110 75 125
29 105 95 145
30 145 135
31 100 150

TOTAL 3,155 2,465 3,200


DATA PERSONNEL ON BOARD

VESSEL : FSO SURYA PUTRA JAYA


MONTH OF : APRIL 2016

DATE CREW SPJ SANTOS VISITOR/KONTRAKTOR DAILY TOTAL REMARKS


1-Mar-2016 23 0 10 33
2-Mar-2016 23 0 9 32
3-Mar-2016 23 0 9 32
4-Mar-2016 23 0 7 30
5-Mar-2016 23 1 7 31
6-Mar-2016 23 0 0 23
7-Mar-2016 23 0 0 23
8-Mar-2016 25 0 0 25
9-Mar-2016 25 0 0 25
10-Mar-2016 25 0 0 25
11-Mar-2016 25 1 0 26
12-Mar-2016 25 0 0 25
13-Mar-2016 25 0 1 26
14-Mar-2016 25 0 1 26
15-Mar-2016 25 0 0 25
16-Mar-2016 25 0 0 25

TOTAL 386 2 44 432

You might also like