VESSEL'S MIDNIGHT ULLAGE REPORT
VESSEL:
PRODUCT:
TANK
FSO SURYA PUTRA JAYA
OYONG CRUDE OIL
ULLAGE
ULLAGE
VOLUME
VOLUME
CORRECTED
T.O.V.
T.O.V.
Interface
Int. Cor'ed
FREE WATER
m.cm
NO.
m.cm
m.cm
CU.M.
BBLS
m.cm
1C
2C
3C
4C
5C
6C
7C
8C
SL.P
18.75
9.30
16.73
17.53
18.24
13.26
16.87
15.85
18.23
7.28
18.452
9.008
16.439
17.241
17.951
12.969
16.580
15.563
17.929
6.969
0
3,183
559
248
0
1,976
504
808
9
357
0
20,019
3,518
1,557
0
12,426
3,172
5,080
59
2,248
Nil
18.133
Nil
Nil
Nil
17.844
NIL
NIL
18.508
12.059
7,644
48,078
1,001
SL.S
OIL VOL
Volume
V.C.F.
G.O.V.
TEMP
OIL VOLUME
W.C.F
@ 60F
TABLE 11
TEMP API 60 F TABLE 6
CU.M.
VOL.(BBLS)
BBLS
17.845
17.443
0
110
17.557
128.137
18.204
11.749
0.6
204.58
806
0
0
4
1,287
0
19,909
3,518
1,557
0
11,621
3,172
5,080
55
961
31.0
32.5
31.2
31.0
30.6
32.8
30.9
30.7
29.8
30.8
87.8
90.5
88.2
87.8
87.1
91.0
87.6
87.3
85.6
87.4
2,207
75
45,871
926
44.5
44.6
44.6
44.6
44.6
44.6
44.5
44.6
44.6
44.6
0.98615
0.98478
0.98593
0.98613
0.98648
0.98453
0.98625
0.98638
0.98723
0.98633
G.S.V.
G.S.V.
N.S.V.
0
19,606
3,468
1,535
0
11,441
3,128
5,010
54
948
0.000
39.212
5.202
3.071
0.000
22.88
6.256
7.516
0.135
2.370
0
19,567
3,463
1,532
0
11,418
3,122
5,003
54
946
0.12551
0.12544
0.12544
0.12544
0.12544
0.12544
0.12551
0.12544
0.12544
0.12544
TOTAL
TOTAL
REMARKS:
351
45,191
912
45,104
910
PRODUCTION LOADING IN TO 6C
Gross Volume :(T.O.V.)
Less Free Water :
Oil Volume :(G.O.V.)
Oil Volume @60F:(G.S.V.)
Long Tons/Metric Tons :
API 60 F :
48,078
2,207
45,871
45,191
5,669
5,760
44.6
Oil Volume @ 60 F :(T.C.V.)
Less OBQ/ROB :
Overall Loaded Vol @ 60 F:
Long tons/Metric tons :
Vessel Experience Factor :
Adjusted Volum @ 60 F :
45,191
DRAFT FWD
7.30 m
Capt. Saiful Bahri
AFT
B.S & W. % Vol :.
0.20
Long Tons/Metric Tons :
CARGO INSPECTOR
BERTH:
PORT:
DATE:
OYONG
OYONG OILFIELD
12-Jan-17
WEIGHT
W.C.F.
WEIGHT
TABLE 13
LT
M/T
0.000
2,459.356
435.032
192.592
0.000
1,435.130
392.616
628.512
6.783
118.907
0.12752
0.12745
0.12745
0.12745
0.12745
0.12745
0.12752
0.12745
0.12745
0.12745
5,669
8.40 m
0.000
2498.764
442.003
195.678
0.000
1458.126
398.903
638.583
6.892
120.813
5,760
TRIM
LIST
Capt. Ihwan Asrul
1.10 m
NIL
MASTER
OYONG OPERATORS DAILY REPORT
FSO SURYA PUTRA JAYA
12-Jan-17 @ 2400 HRS
Staff
Surya Putra Jaya Master
Capt. Ihwan Asrul
Crude Storage
Santos Rep.
Capt. Saiful Bah
Lifting
24 Hours Total (bbls)
1,001
Last Lifting
BS and W %
0.20
Lifting Vol (bbls)
Storage Gross (bbls)
45,871
Storage Net / G.S.V (Nbbls)
45,191
Storage Net / N.S.V (Nbbls)
45,104
Days to Tank Tops
285
Total Crude This Month (Nbbls)
19-D
141,
Next Lifting
Next Lifting Vol (bbls)
Vessel ETA
45,191
Water
Offtake
Water Received 24hrs (bbls)
75
Total Water in Cargo (bbls)
2,207
Total P/W Received (bbls)
84,181
Offtake 24 Hours (bbls)
Note :
Water Drawn off (bbls)
Loading/Incoming Temp
42.0
Specific Gravity
Storage tanks's temperature
32.8
PFW PH
0
Note:
OIW Average (mg/I)
10
OIW Peak (mg/I)
: PRODUCTION LOADING INTO COT 6C
Non Regulated Waste
Category
Vol (m3)
Kg
Soft Waste
0.00
Non Metal Waste
0.00
Metal Waste
0.00
Regulated Waste
Comments
Category
Vol (m3)
Kg
0.00
Solid Hazardous From Process
Liquid Chemical Waste
Biological Waste
Liquid Hazardous Waste (Oil)
SMF (Synthetic Mineral Fibre)
Solid Hazardous Waste
Note :
Comments
OYONG OPERATORS DAILY REPORT
Fuel
FSO-MFO
Opening (m3)
Received / Bunkered (m3)
Consumption (m3)
Closing (m3)
FSO-MDO
231,612
Service Vessel
MDO
### 60,174
###
1,310
231,612
58,864
Supply Remaining (days)
Remarks :
Meetings
Type
Time
Tool box meeting
Supervisory Meeting
06.30
16.30
Comment
1. Review previous day activity
2. Marking label for safety equipment
3. Continue maintenance main deck , etc at Slop S
4. Corrective action for SPKK and workplace inspection
5. Lifting and transfer materials
6. Continue General Overhaul Auxiliary Engine No.2
7. Maintenance RO No.1
8. Repair stb windlass operating handle
9. Cleaning condenser sea water tube provision refrigerato
1. Review deck, engine and galley dept. activity
2. Marking label on deck
3. Lifting materials and food stuff
4. Corrective action for the workplace inspection and SPKK
5. Continue maintenance main deck , etc at Slop S
Incidents
Type
Reference
Comments
NIL
Drills
Type
S.T.O.P. Audit program
Observation Card Report : 21
The details see SPKK sheet *)
###
Time
Comment
Capt. Saiful Bahri
19-Dec-16
141,460
-
deg C
deg C
TO COT 6C
11209 / 44961
e Vessel
Comment
etc at Slop S
kplace inspection
y Engine No.2
e
provision refrigerator no.2
t. activity
nspection and SPKK
etc at Slop S
Comment
FSO SURYA PUTRA JAYA - DAILY ACTIVITY REPORT
1. LOG OF EVENT 24 HOURS
1.1 Operations
Cargo operations :
PRODUCTION LOADING INTO COT 6C
Mooring/Unmooring :
Bunkering/Debunkering :
Personnel & Material Transfer :
06.00 : 19 Persons PKP By KST. 51 ( Out )
08.10 : 2 Persons Oryx & 1 Person Nalco By KST. 51 ( In )
09.50 : 2 Persons Oryx By KST. 51 ( Out )
13.10 : 1 Person Santos Rep By KST. 51 ( In )
14.00 : 1 Person Santos Rep & 1 Person Nalco By KST. 51 ( Out )
14.05 : 2 Cradle O2 Black, 1 Cradle Acetylene, 1 Empty Cradle Yellow & 1 Box Orange
: 2 Cradle provision, 70 empty gallon & 1 cargo net by KST. 51 ( Out )
16.45 : 19 Persons PKP By KST. 51 ( In )
1.2 Planned/Unplanned Maintenance
DECK :
1. Assist Transferred Santos Rep, Oryx, Nalco & PKP Personnel's
2. Marked label port Lifeboat
3. Assisted for repair the stb windlass operating handle
4. Chipping, brushing and 1st coating main deck, etc at Slop S
5. Transferred materials to support vessel
ENGINE :
1. Continued General Overhaul Auxiliary Engine No.2
2. Maintenance RO No.1
- Replacement fine filter
3. Checked & repaired stb windlass operating handle
4. Cleaned condenser sea water tube provision refrigerator no.2
5. Repainted main engine fresh water cooler cover
6. Painted new pipe fuel oil tank no.2
7. Running up A/E 1 & 3:
13.00 - 14.00 - Lifted Materials By KST. 51 ( Out )
2.
2.1
PERMIT TO WORK
J HA
PW
MW
HW
CSE
IP
VAL
439
1681
1681
374
168
920
374
168
920
439
M.F.O
M.D.O
CONS
0
1,310
RCVD
0
0
CONS
RCV
TRNSF
PROD
0
10
0
0
0
0
0
21
OSD
200
REC
0
IN
CONS
0
OUT
23
23
3. BUNKERS(M3)
4. FRESH WATER (MT)
BLR
DOM
5. DISPERSANT, FOAM, CHEMICALS (LTRS)
REASON FOR USE
6. POB
MAN HOURS ( POB X 12 HRS )
Previous man hours
Man hours today
Total man hours
212892
252
213144
Days W/O LTI
1141
Since
213144
Safe man hours
7. EHS INCIDENT AND STATISTIC REPORTING
ITEM
IMS Number
First Aid Cases
Medical Treatment Injury
Lost time - Injury
Near Misses
Toolbox and Safety Meetings
`
Observations card report (SPKK)
Incidents
Environmental Incident
Safety Inductions
Note :
Toolbox meeting conducted by Master, Chief Officer and Chief Engineer with deck / engine crew.
8. DRILLS/EXERCISES
9. EHS AUDIT/INSPECTION
10. ISSUES WITH LOCAL COMMUNITY
11. VESSEL ARRIVAL/DEPARTURE
12. ON BOARD TRAINING / SAFETY MOVIE / OTHERS
28-Nov-13
12-Jan-17
TOTAL
3589
3587
@2400 HRS
TRANS
0
0
ROB
ROB
231,612
58,864
`
45
171
ROB
200
POB
40
28-Nov-13
Previous
Today
Total
0
0
0
0
1615
1817
3
0
57
0
0
0
0
2
21
0
0
0
0
0
0
0
1617
1838
3
0
57
NIL
NIL
NIL
NIL
NIL
FUEL STATUS REPORT
Vessel Name
Period
FSO. SURYA PUTRA JAYA
Jan-17
MDO
Date
Opening
Balance
( Ltr )
( Ltr )
A/E
No.1
(Hrs)
A/E
No.2
(Hrs)
A/E
No.3
(Hrs)
Closing
Balance
( Ltr )
Receive
Transfer
Cons.
Adj.
( Ltr )
( Ltr )
( Ltr )
Remarks
01
75,622
1,296
5.0
19.0
0.0
74,326
02
74,326
1,296
15.0
0.0
9.0
73,030
03
73,030
1,752
4.0
0.0
24.0
71,278
Internal Cargo Transferred
04
71,278
1,808
8.0
0.0
24.0
69,470
Internal Cargo Transferred
05
69,470
1,338
3.0
0.0
24.0
68,132
Transferred Materials
06
0
0
0
0
1,324
1,394
0
0
2.0
17.0
0.0
0.0
24.0
14.0
66,808
Transferred Materials
07
68,132
66,808
65,414
Transferred Materials
08
65,414
1,324
24.0
0.0
2.0
64,090
Transferred Materials
09
64,090
1,296
24.0
0.0
0.0
62,794
10
62,794
1,310
13.0
0.0
12.0
61,484
Transferred Materials
11
61,484
1,310
1.0
0.0
24.0
60,174
Transferred Materials
12
60,174
1,310
1.0
0.0
24.0
58,864
Transferred Materials
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
NIL
NIL
FUEL STATUS REPORT
Vessel Name
Period
FSO. SURYA PUTRA JAYA
Jan-17
MFO
Date
Opening
Balance
( Ltr )
( Ltr )
( Ltr )
( Ltr )
( Ltr )
Closing
Balance
( Ltr )
Receive
Transfer Consumption Adjusment
Remarks
01
235,612
235,612
02
235,612
235,612
03
235,612
1,000
234,612
Internal Cargo Transferred
04
05
06
234,612
231,612
0
0
0
0
3,000
0
0
0
231,612
231,612
Internal Cargo Transferred
231,612
231,612
07
231,612
231,612
08
231,612
231,612
09
231,612
231,612
10
231,612
231,612
11
231,612
231,612
12
231,612
231,612
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
LOG SHEET DOMESTIC & SANITARY WASTE WATER
Vessel Name
FSO. SURYA PUTRA JAYA
Periode
2017
Date
Quantity Domestic Waste Water ( M3 )
Jan
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
12
TOTAL
151
Feb Mar Apr May Jun
Jul
Aug Sep Oct Nov Dec
13
11
12
12
14
13
12
13
13
14
12
LOG SHEET DOMESTIC & SANITARY WASTE WATER
Vessel Name
FSO. SURYA PUTRA JAYA
Periode
2017
Date
Quantity Sanitary Waste Water ( M3 )
Jan
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
TOTAL
91
Feb Mar Apr May Jun
Jul
Aug Sep Oct Nov Dec
7
7
8
8
7
8
8
8
7
8
7
LOG SHEET COOLING WATER
Vessel Name
FSO. SURYA PUTRA JAYA
Periode
2017
Date
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
Quantity Cooling Water Discharge ( M3 )
JAN FEB MAR APR MAY JUN
4,964
4,951
4,971
4,954
4,980
4,969
4,972
4,957
4,960
4,987
4,991
4,984
TOTAL 59,640
Averag
e/Day
JUL AUG SEP OCT NOV DEC
1,924
LOG SHEET RESERVOIR OSMOSIS WASTE WATER
Vessel Name FSO. SURYA PUTRA JAYA
Periode
2017
Date
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
TOTAL
Quantity R.O Waste Water ( M3 )
Jan Feb Mar Apr May Jun
Jul Aug Sep Oct Nov Dec
80
70
135
80
120
125
130
60
40
110
100
105
1,155
DATA PERSONNEL ON BOARD
VESSEL
MONTH OF
: FSO SURYA PUTRA JAYA
: Jan 2017
DATE
CREW SPJ
SANTOS
VISITOR/KONTRAKTOR
DAILY TOTAL
1-Jan-2017
2-Jan-2017
3-Jan-2017
4-Jan-2017
5-Jan-2017
6-Jan-2017
7-Jan-2017
8-Jan-2017
9-Jan-2017
10-Jan-2017
11-Jan-2017
12-Jan-2017
22
22
22
22
22
22
22
22
22
22
21
21
0
0
0
0
0
1
0
0
0
0
0
0
0
0
0
0
0
6
6
6
10
10
19
19
22
22
22
22
22
29
28
28
32
32
40
40
TOTAL
262
76
339
REMARKS
SIKLUS PENGAMATAN KESELAMATAN KERJA
Vessel Name : FSO. SURYA PUTRA JAYA
Date :
12/Jan/17
Action/Commen
t
Positive /
Negative
Total
Done
Positive
Tank cleaning
scheduled
Positive
Assisted boatswain lifted materials as signal man
on deck
Done
Positive
Marked reflective tape for Life Boat Port Side
Done
Positive
Progress
Positive
Well Done
Positive
Assisted C/E General Overhaul Auxiliary Engine
No.2
Progress
Positive
Engine Room
Assisted C/E General Overhaul Auxiliary Engine
No.2
Progress
Positive
E/E
Engine Room
Cleaned condenser sea water tube provision
refrigerator no.2
Good
Positive
Bosun
Main Deck
Chipping & brushing
Positive
11 ACHMAD NURUL HUDA
AB
Deck A
Good
Positive
12 UDIYANTO
AB
Main Deck
Assisted Boatswain maintenance on deck area
Slop STBD
Well Done
Positive
13 BAYU SEGARA
AB
Main Deck
2nd Coating main Deck Slop STBD Area
Done
Positive
14 DEDI
OS
Main Deck
Assisted Boatswain maintenance on deck area
Slop STBD
Well Done
Positive
15 ELIK BUDIANTO
FTR
RO Room
Assisted 2/E maintenance RO No.1
Good
Positive
16 SUAIB
MTM
Engine Room
Progress
Positive
Done
Positive
Well Done
Positive
Reported by
Rank
Location
Master
Crew Mess
Room
Advice To Galley Team For Preparing Receiving
Provision
2 DENNY DAVID PAULUS
C/O
Main Deck
Rechecked tank cleaning equipment
3 CENG UMAR
2/O
Main Deck
4 INDRA
3/O
Boat Deck
5 JULY MANGIRI
C/E
Engine Room
6 AGUNG RISTIANTO
2/E
RO Room
7 IRVAN TAHIR
3/E
Engine Room
8 HENDRA PRATAMA
4/E
9 SURYADINATA
1 IHWAN ASRUL
10 AANG
17 CHULWAN NURFALLAH WIPER
Description
All In Charge General Overhaul Auxiliary Engine
No.2
Maintenance RO No.1
Maintenance on deck area slop STBD
Deck A passage clean & tidy
Assisted C/E General Overhaul Auxiliary Engine
No.2
Engine Room Painted main engine fresh water cooler cover
18 MASRUDI
C/Cook
Provision
Store
19 ROCHIM
COOK
Galley
Clean up cooking equipment after use
Good
Positive
20 BOBY MANGONTO
STWD
Deck A
Daily House Keeping In deck A passage
Done
Positive
Collected empty gallon at lay down for landing
Refill
Positive
21 HARIANTO SULE TANAN STWD
Lay down
Febrication last provision for receiving new
provision
TOTAL 21