0% found this document useful (0 votes)
32 views3 pages

Table of Contents

This document contains a table of contents that outlines 7 chapters covering various topics related to an on-the-job training experience at a company. The chapters will discuss the company background, beer production process, refrigeration systems, boilers, diesel generators, maintenance procedures, assigned work calculating boiler efficiency, and conclusions and recommendations. The document provides a high-level overview of the content that will be included in the on-the-job training experience and report.

Uploaded by

rowsunmahato
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
32 views3 pages

Table of Contents

This document contains a table of contents that outlines 7 chapters covering various topics related to an on-the-job training experience at a company. The chapters will discuss the company background, beer production process, refrigeration systems, boilers, diesel generators, maintenance procedures, assigned work calculating boiler efficiency, and conclusions and recommendations. The document provides a high-level overview of the content that will be included in the on-the-job training experience and report.

Uploaded by

rowsunmahato
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 3

TABLE OF CONTENTS

Chapter

Contents

Page

Title page
Approval page
Acknowledgements
Table of contents
List of figures
List of tables
Abstract
Objectives of OJT
1. Introduction of company
1.1 History and background
1.2 Mission statement
1.3 Organization structure
1.4 Management system

1.5 Capital investment


1.6 No. of employees
1.7 System of requisition and acquisition of inventories
1.8 Benefits and facilities to the employees
1.9 Safety measures
2. CGBN
2.1 Introduction
2.2 Production machineries
2.3 Production process
2.2.1 Malting
2.2.2 Milling
2.2.3 Mashing
2.2.4 Lautering
2.2.5 Boiling
2.2.6 Wort separation and cooling
2.2.7 Fermentation
2.2.8 Conditioning and filtering
2.2.9 Bottling and packaging
3. Refrigeration
3.1 Introduction
3.2 Types of refrigeration
3.2.1 Vapor absorption refrigeration
3.2.2 Vapor compression refrigeration
3.3 Components of refrigeration
3.3.1 Evaporator
3.3.2 Condenser
3.3.3 Compressor

3.3.4 Expansion valve


3.3.5 Cooling tower
4. Boiler
4.1 Introduction
4.2 Types of boiler
4.2.1 Horizontal fire tube boiler
4.2.2 Vertical water tube boiler
4.3 Boilers mountings and accessories
4.4 Feed water treatment
4.4.1 Filtration
4.4.2 Water softening
4.5 Scale deposit in boiler
4.5.1 Introduction
4.5.2 Causes
4.5.3 Types of scale deposit
4.5.4 Effects
4.5.5 Solution
4.5.6 Preventive measure for scale formation
5. Diesel generator plant
5.1 Introduction
5.2 Diesel engine parts
6. Maintenance
5.1 Introduction
5.2 Preventive maintenance
6. Work assigned
6.1 Calculation of efficiency of the vertical water tube boiler
6.2 Observations
6.3 Findings
6.4 Remedy
6.4.1 Remedies for boiler to increase efficiency
6.4.2 Remedies for refrigeration
7. Conclusion and recommendations
7.1 Conclusion
7.2 Recommendations
References
Appendix

You might also like