Synergy Exim PVT - Ltd.-Pune-India: Project Management - Activity Chart
Synergy Exim PVT - Ltd.-Pune-India: Project Management - Activity Chart
LTD
PROJECT MANAGEMENT - AC
RESPONSIBILITIES
CONCEPT OF BUSINESS
CHECK
OWNER
SURVEY
MARKET SIZE
LAND
SYNERGY
SEASONS
FINANCE
CONSULTANT
COMPETITORS
WATER AVAILABILITY
SUPPLIERS
COSTING
POWER AVAILABILITY
PROJECT ENGG.
PACKING
EXACT REQUIREMENT OF
PRODUCTS
VOLTAGE/FREQUENCY
FUEL AVAILABILITY/QUALITY
STANDARDS TO FOLLOW
CAPACITY
FABRICATION
PACKING
BOILER
FUTURE EXPANSIONS
FINISHED GOODS
DIVERSIFICATION
PACKING
IMPORT DUTY/RULES/BANS
WEIGH BRIDGECAPACITY
LENGTH
COUNTRY RULES & REGULATIONS
SITE DATA
EFFLUENT NORMS
LOCATION SELECTION
SITE SELECTION
PLOT LEVELS
PORT AVAILABILITY/DISTANCE
APPROACH ROAD
INDUSTRIAL ATMOSPHERE
BENEFITS/SUBSIDIES
LOCAL TAXES/DUTIES
LAND COST
LOCAL INTERFERENCE
RESIDENTIAL COST
WATER AVAILABILITY
COST OF LIVING
POWER AVAILIBILITY
COMMUNICATION FACILITIES
EFFLUENT HANDLING
WATER LEVEL
SAFETY/SECURITY
EDUCATION FACILITY
MEDICAL FACILITY
POWER AVAILABILITY/COST
WATER AVAILABILITY
FUEL AVAILABILITY
SYNERGY RESPONSIBILITY
FINALISE
FINALISE
DRAWINGS
PRODUCT
PLOT LAYOUT
FOUNDATIONS
PROCESS
PLANT LAYOUT
LAYOUT
CAPACITY
UTILITIES
PACKING
QUANTITY
STRUCTURAL DRAWINGS
DISTRIBUTION
CALCULATIONS
TECH. SPECS
ELECTRIC LOADS
ELECTRICAL DRAWINGS
PROJECT SCHEDULE
STORAGE FACILITIES
DISTRIBUTION
ORDERS
PACKING MATERIAL
STEAM
ISSUE
POWER
INSPECT
WATER
CO-ORDINATE DISPATCHES
EFFLUENT
AIR
CHIMNEY
TANKS FABRICATION
PROJECT ORDERS
PURCHASE
ORDER PROCESS
PROCESS PLANTS
PUMPS
STEAM BOILER
MOTORS
TENDER DOCUMENT
TRANSFORMER
STARTERS - MOTORS
COLLECTING QUOTE
GENERATOR
GEAR BOXES
QUOTE COMPARISON
WATER TREATMENT
ERECTION TOOLS
PARALLEL QUOTES
EFFLUENT TREATMENT
PANELS
SUPPLIERS RATINGS
WEIGH BRIDGE
CABLES
TECHNICAL
PACKING MACHINES
LIGHTING
COMMERCIAL
COOLING TOWERS
PIPING'S
WORK SHOP
FLANGES
ORDER FINALISATION
COMPRESSOR
VALVES
P.O.
CHILLER
GAUGES
INSURANCE
GOODS LIFTS
STRAINERS
L.C. CONDITIONS
LABORATORY
EAR THING
IMPORT FORMS
TIME OFFICE
PACKING MATERIAL
PRS
SPARES
PAYMENT TERMS
INTERM. CONVEYORS
PACKING SHEETS
ADVANCE
LIGHTNING ARRESTER
AGAINST DELIVERY
WEIGHING MACHINES
RETENTION
STITCHING MACHINES
ERECTION CHARGES
ONE YEAR SPARES
DISPATCH PRIORITY
FOUNDATION BOLTS
STRUCTURES, RAILINGS, LADDERS
SILOS/BINS
EQUIPMENTS/ TANKS
PANELS / CABLES
OTHER ITEMS
SITE FACILITIES
WHILE STARTING
SITE WORK
VEHICLES
MANPOWER AT SITE
LAYOUT
DRIVERS
ACCOUNTS
CIVIL
GUEST HOUSE
IMPORT CLEARANCE
STRUCTURAL
COOK
SITE ENGG.
TANK FABRICATION
PHONE/FAX/MOBILE
SECURITY
ERECTION
INTERNET
TIME OFFICE
PIPING
COMP.-AUTO CAD
MECH. ENGG.
CABLING
PRINTER
ELECT. ENGG.
FOUNDATION
SITE OFFICE
FITTER
LIGHTING
TURNER
ROADS
ELECTRICIAN
DRAINS
CIVIL
STRUCTURAL
ERECTION
FOUNDATIONS - ALL
PROCESS PLANTS
PROCESS PLANT
BOILER HOUSE
STEAM BOILER
PIPE STRUCTURES
SILOS
PACKING MATERIAL
CHIMNEY
WEIGH BRIDGE
FINISHED GOODS
CONVEYING SYSTEM
CHIMNEY
CHEMICALS
COOLING TOWER
TANKS
PACKING MACHINES
UTILITIES BUILDINGS
RAW MATERIAL
CONVEYING SYSTEM
ENGG. STORES
CHEMICALS
SILOS
WORKSHOP
RAW WATER
LAB
SOFT WATER
OFFICE
ROADS
PLANT MANAGERS
FINISHED PRODUCTS
PERSONNEL DEPT.
LPFO
SECURITY/TIME OFFICE
PETROL/DIESEL
DRAINS
PIPING
POWER TRENCHES
WATER
OIL
LPFO
WORKERS FACILITIES
DIESEL
CONTRACTORS PLACE
EFFLUENT
WORSHIP PLACE
STEAM
CONDENSATE
ORGANISATION
LEVELS
TECHNICAL
ADMIN.
MANAGERS
PROCESS
H.R.
SUPERVISORS
MECH.
TIME OFFICE
OPERATORS
ELECL.
SECURITY
WORKERS
WORKSHOP
MEDICAL
BOILER
CONTRACTORS
LAB.
TANK FARM
PROJECT SCHEDULE
START
1/1/2009
MANPOWER AT SITE
CONCEPT DEVELOPMENT
10 DAYS
10/1/2009
PROJECT ENGG.
TENDER DOCUMENTS
10 DAYS
20/1/2009
ERECTION ENGG.
COLLECTION OF QUOTE
30 DAYS
20/2/2009
ERECTION TEAM
NEGOTIATION
15 DAYS
ORDER FINALISATION
15 DAYS
P.O./ ADVANCE/L/C.
15 DAYS
LAYOUT APPROVAL
15 DAYS
STRUCTURAL APPROVAL
15 DAYS
5/3/2009
20/3/2009
COMMISSIOINING ENGG.
ERECTION PLAN
5/4/2009
20/4/2009
PROCESS PLANT
SILO/TANKS
5/5/2009
BOILER
TRANSFORMER/GENERATOR
DISPATCH OF GOODS
WEIGH BRIDGE
STARTING
90 DAYS
5/7/2009
PIPING
COMPLETION
120 DAYS
5/11/2009
CABLING
ANY REPLACEMENT
30 DAYS
5/12/2009
TESING
GY EXIM PVT.LTD.-PUNE-INDIA
LTAGE/FREQUENCY
SHED GOODS
REGULATIONS
LICENSES
OWNERS RESPONSIBILITY
SITE DATA
COMPANY REGISTRATION
CONCEPT FINALISATION
RAIN
LOCAL GOVT.
LAND
IMPORTS
FINANCE/PAYMENTS
TEMP.
SALES TAX
WIND
EXCISE
LICENSES /PERMISSIONS
SHOP ACT
WATER
WORK PERMIT
CIVIL ARCHITECT/CONTRACTORS
LAND CANTORS
FACTORY
ELECTRICAL
LOCAL PURCHASES
BOILER
CO-ORDINATION WITH
POWER
POLLUTION
SYNERGY
NAFDAC
SITE ACTIVITIES
SUPPLIERS
PETROLEUM PRODUCTS
BRAND-
COMMISSIONING PREPARATION
SELECTION
DESIGN
REGISTRATION
LAYOUT PREPARATION
PROCESS FLOW
ENGG. STORES
PROCESS PLANTS
WORKSHOP
UTILITIES
BOILER
LAB.
POWER
OFFICES
COOLING TOWERS
WAREHOUSES
TANK FARM
SECURITY/TIME OFFICE
PACKING MATERIAL
BOREWELLS
CHEMICALS
RESIDENTIAL QUARTERS
FINISHED GOODS
CONTRACTORS PLACE
OFFLOADING
BYPRODUCTS IF ANY
FINISHED OIL
FUEL TANKS
DIESEL
BOILER SOLID FUEL STORAGE
WEIGH BRIDGE
PLANT
RAW MATERIAL
CRUDE OIL
SILOS
ADMIN
CONSULTANT
CO-ORDINATE
SEND TO SITE
TECH. SPECS
ALL SUPPLIERS
DRAWINGS
VENDORS
DOCUMENTATION
P.O.'S
FORMULAE
PROJECT SCHEDULE
SHIPMENT DETAILS
PACKING MATERIAL
ORDERS
COSTING
PAYMENTS
DATA SHEETS
STORAGE SPACE
INSPECTION
MANUALS
ORGANOGRAM
SHIPMENTS
DRAWINGS
INSPECTION
SITE REQUIREMENT
COMMISSIONING
MANPOWER RECRUITMENT
VALUE ADDITION
COST CUTTING
SPECIFICATIONS
RAW MATERIAL
CHEMICALS
FINISHED GOODS
PACKING MATERIAL
LAB EQUIPMENTS
PROCEDURES
PURCHASE CONDITIONS
REQUIREMENTS
SCOPE OF SUPPLY
MAKES
NAME PLATES
MANUALS
UTILITIES
QUALITY/QUANTITY
DATA SHEETS
STEAM
WATER
AUTOMATION
POWER
COMMISSIONING SPARES
AIR
FOUNDATION BOLTS
MANUALS 3 SETS
P&I.
INSPECTION CLAUSE
STRUCTURAL - CALCULATIONS
PERFORMANCE GUARANTEE
FOUNDATION
ELECTRICAL -
DELIVERY TIME
SINGLE LINE
PANELS
DISPATCH SCHEDULE
PACKING QUALITY -EXPORT WORTHY
SHIPMENTS
PACKING COST
PACKING LIST
SHIPPING AGENT/LINE?
NO ESCALATION CLAUSE
B.L. CONDITIONS
NO FOREX FLUCTUATIONS
PRE-SHIPMENT INSPECTION?
SITE ENGG.
FUMIGATION?
TRANS-SHIPMENT
PART SHIPMENT
NGS, LADDERS
SITE PREPARATIONS
SECURITY AT SITE
BOUNDARY WALL
LAND PREPARATION
MATERIAL RECEIPTS/STORAGE
BORE WELLS
SHORTAGE/DAMAGE - REPORTING
WATER TANK
WATER DISTRIBUTION
CO-ORDINATE -SYNERGY
POWER DISTRIBUTION
SITE OFFICE
MANPOWER PLANNING
OFFLOADING FACILITIES
UTILITIES
ELECTRICAL
COMMISSIONING
MAIN SUPPLY
MECH. CHECKING
POWER HOUSE
ELECTRICAL CHECKING
GENERATORS
AUTOMISATION CHECKING
SYNCHRONIZATION
STEAM
DISTRIBUTION
WATER
PANELS
POWER
MOTORS CONNECTIONS
AIR
PLOT LIGHTING
FOUNDATION
PLANT LIGHTINGS
PURCHASE
ERECTION
EAR THINGS
CHEMICALS
ROOFING
LIGHTING ARRESTERS
PACKING MATERIAL
OCESS PLANT
OLING TOWER
KING MACHINES
NVEYING SYSTEM
RAW MATERIAL
LADDERS
CONVEYORS
SPARES
WALKWAYS
FACTORY MANPOWER
SAFETY PRECAUTIONS
MIS
FINANCE
MARKETING
RECEIPTS
BANK
ORDERS
PRODUCTION OUTPUT
IMPORTS
DISPATCHES
ACCOUNTS
MONEY RECEIPTS
CHEMICALS
PURCHASE
COMPLAINTS
UTILITIES
RECEIPT
FEEDBACK
PACKING MATERIAL
DISPATCHES
MARKET ACTIVITIES
SPARES
MIS
FUTURE PLANNING
PROCESS COST
DOWN TIME & ANALYSIS
DISPATCHES
STOCKS
RAW MATERIAL
PACKING MATERIAL
CHEMICALS
FINISHED GOODS
MANPOWER
NPOWER AT SITE
COMMISSIOINING PREPAPARATION
5/7/2009
RAW MATERIAL
5/12/2009
ECTION ENGG.
5/8/2009
CHEMICALS
5/12/2009
ECTION TEAM
5/8/2009
PACKING MATERIAL
5/12/2009
5/12/2009
STEAM
5/12/2009
5/8-5/12/09
WATER
5/12/2009
5/8-5/10/09
POWER
5/12/2009
5/8-5/10/09
COMMISSIOINING
15/1-30/1/10
5/8-5/10/09
COMPLETION
30/1/10
MMISSIOINING ENGG.
20/12/2009
ECTION PLAN
OCESS PLANT
NSFORMER/GENERATOR
5/8-5/10/09
5/11-5/1/10
5/11/-5/1/10
5/1-15/1/10
SEASON
MIN-MAX-AVE.
MIN-MAX-AVE.
MIN-MAX-AVE.
AND CANTORS
ERECTION TOOLS
WINCH
CRANE
CHAIN PULLEY BLOCKS
ROPES
SPANNERS SET
ELECTRICIAN TOOLS SET
WELDING
CUTTING
TURNING
NUT BOLTS
PACKING SHEETS
MEASURING TAPES
AW MATERIAL
ACKING MATERIAL