- The document provides details of a road improvement project in Howrah, West Bengal, India including sieve analysis of different stone materials. - It summarizes the sieve analysis results for 26.5mm, 13.2mm and 5.6mm sized Pakur stone materials, as well as stone dust materials, showing the percentage retained and passing through various sieve sizes. - It also shows the design mix specifications for water bound macadam including the minimum, maximum and IRC average percentages for different sieve sizes, and compares these to the results from the sieve analysis.

Uploaded by

Anonymous 1mPOyp
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
48 views

Design Mix of WMM

- The document provides details of a road improvement project in Howrah, West Bengal, India including sieve analysis of different stone materials. - It summarizes the sieve analysis results for 26.5mm, 13.2mm and 5.6mm sized Pakur stone materials, as well as stone dust materials, showing the percentage retained and passing through various sieve sizes. - It also shows the design mix specifications for water bound macadam including the minimum, maximum and IRC average percentages for different sieve sizes, and compares these to the results from the sieve analysis.

Uploaded by

Anonymous 1mPOyp
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 6

NAME OF THE WORK :-

Improvement of Sinti-Pacharul Road from 0.00km to 3.95km and


strengthening from 3.20km to 3.95km under Howrah RIDF-XXI.(2n

REF.

Tender No.-9 of 2016-17 of the Superintending Engineer, Souther


(Roads) Directt.
M/S H.M. Construction Co ,Vill&PO Usthi,Dist :-South 24 Parganas

:-

NAME OF THE AGENCY :-

SIEVE ANALYSIS OF 26.5 MM SIZE PAKUR STONE MATERIALS FOR W.M.M.


Weight of Sample in gms :-

Sieve size
in mm
45.00
26.50
13.20
5.60
2.36
0.60
0.075

Weight
Retain
in
Kg.

W=

% of Weight
Retain

0.00
7841.00
2148.00
0.00
0.00
0.00
0.00
9989.00

0
78.41
21.48
0.00
0.00
0.00
0.00

10000

Cumulative % Cumulative
of Weight
% of
Retain
Passing

0
78.41
99.89
99.89
99.89
99.89
99.89

0.00
78.41
99.89
99.89
99.89
99.89
99.89

Weight of Sample in gms

:-

W=
Cumulativ

Sieve size Weight % of Weight e % of


Retain
in
Retain
Weight
in mm
Kg.
Retain

45.00
26.50
13.20
5.60
2.36
0.60
0.075

0.00
7841.00
2148.00
0.00
0.00
0.00
0.00
9989.00

0
78.41
21.48
0.00
0.00
0.00
0.00

0
78.41
99.89
99.89
99.89
99.89
99.89

SIEVE ANALYSIS OF 13.2 MM SIZE PAKUR STONE MATERIALS FOR W.M.M.


Weight of Sample in gms :W = 10000
Weight
Cumulative % Cumulative
Sieve size Retain
% of Weight
of Weight
% of
in
Retain
in mm
Retain
Passing
Kg.

45.00
26.50
13.20
5.60
2.36
0.60
0.075

0.00
0.00
1792.00
8198.00
0.00
0.00
0.00
9990.00

0
0
17.92
81.98
0
0
0

0
0
17.92
81.98
0
0
0

0
0
0
18.02
99.90
99.90
99.90

Weight of Sample in gms

Sieve size
in mm
45.00
26.50
13.20
5.60
2.36
0.60
0.075

W=
Cumulativ
Weight
% of Weight e % of
Retain
in
Retain
Weight
Kg.
Retain

0.00
0.00
1792.00
8198.00
0.00
0.00
0.00
9990.00

:-

0
0
17.92
81.98
0
0
0

0
0
17.92
81.98
0
0
0

SIEVE ANALYSIS OF 5.6 MM SIZE PAKUR STONE MATERIALS FOR W.M.M.


Weight of Sample in gms

Sieve size
in mm
45.00
26.50
13.20
5.60
2.36
0.60
0.075

Weight
Retain
in
Kg.

0.00
0.00
0.00
916.00
2946.00
1829.00
172.00
5863.00

:-

W = 6000

% of Weight
Retain

0
0
0
15.27
49.1
30.48
2.87

Cumulative % Cumulative
of Weight
% of
Retain
Passing

0
0
0
15.27
64.37
94.85
97.72

100
100
100
84.73
35.63
5.15
2.28

Weight of Sample in gms

:-

W =
Cumulativ

Weight
Sieve size Retain
% of Weight e % of
in
Retain
Weight
in mm
Kg.
Retain

45.00
26.50
13.20
5.60
2.36
0.60
0.075

0.00
0.00
0.00
916.00
2946.00
1829.00
172.00
5863.00

0
0
0
15.27
49.1
30.48
2.87

0
0
0
15.27
64.37
94.85
97.72

SIEVE ANALYSIS OF STONE DUST MATERIALS FOR W.M.M.


Weight of Sample in gms

Sieve size
in mm

Weight
Retain
in

:-

% of Weight
Retain

W = 3000
Cumulative % Cumulative
of Weight
% of

Weight of Sample in gms

:-

W=
Cumulativ

Weight
Sieve size Retain
% of Weight e % of
in
Retain
Weight
in mm

Sieve size
in mm
45.00
26.50
13.20
5.60
2.36
0.60
0.075

Weight
Retain
in
Kg.

0.00
0.00
0.00
0.00
598.00
699.00
1218.00
2515.00

% of Weight
Retain

Cumulative % Cumulative
of Weight
% of
Retain
Passing

0
0
0
0
19.93
23.3
40.6

0
0
0
0
19.93
43.23
83.83

100
100
100
100
80.07
56.77
16.17

Cumulativ

Sieve size Weight % of Weight e % of


Retain
in
Retain
Weight
in mm
Kg.
Retain

45.00
26.50
13.20
5.60
2.36
0.60
0.075

0.00
0.00
0.00
0.00
598.00
699.00
1218.00
2515.00

0
0
0
0
19.93
23.3
40.6

0
0
0
0
19.93
43.23
83.83

NAME OF THE WORK

:-

' Improvement of Sinti-Pacharul Road from 0.00k


strengthening from 3.20km to 3.95km under Howr

REF.

:-

Tender No.-9 of 2016-17 of the Superintending En


CircleP.W (Roads) Directt.
M/S H.M. Construction Co ,Vill&PO Usthi,Dist :-Sou

NAME OF THE AGENCY

:-

DESIGN MIX FOR W.M.M.

SIEVE SIZE
IN MM

45.00
26.50
13.20
5.60
2.36
0.60
0.075

MIN.

95.00
60.00
40.00
25.00
15.00
8.00
0.00

MAX.

100.00
80.00
60.00
40.00
30.00
22.00
5.00

26.5 MM.
IRC AVERAGE.

IRC RANGE

97.50
70.00
50.00
32.50
22.50
15.00
2.50

13.2 MM.

5.6 MM

STONE
DUST
26.5MM

PERCENTA PERCENTA PERCENTA PERCENTA


GE OF
GE OF
GE OF
GE OF
PASSING
PASSING
PASSING
PASSING

0
78.41
99.89
99.89
99.89
99.89
99.89

0
0
0
18.02
99.9
99.9
99.9

100
100
100
84.73
35.63
5.15
2.28

100
100
100
100
80.07
56.77
16.17

45
35
70.28
79.95
81.26
86.29
77.06
68.51

CHART FOR COMBINED GRADING


100
90
80
70
60
50
PERCENTAGE OF PASSING
40
30

40
30
20
10
0
0.075

0.750
SIEVE SIZE IN MM

7.500

m 0.00km to 3.95km and widening and


er Howrah RIDF-XXI.(2nd call)

nding Engineer, Southern Highway CircleP.W

Dist :-South 24 Parganas

LS FOR W.M.M.
10000
AVERAGE %
Cumulati OF PASSING
ve % of
Passing

0.00
78.41
99.89
99.89
99.89
99.89
99.89

0.00
78.41
99.89
99.89
99.89
99.89
99.89

LS FOR W.M.M.
10000
Cumulati
AVERAGE %
ve % of
OF PASSING
Passing

0
0
0
18.02
99.90
99.90
99.90

0.00
0.00
0.00
18.02
99.90
99.90
99.90

LS FOR W.M.M.
6000
Cumulati
AVERAGE %
ve % of
OF PASSING
Passing

100
100
100
84.73
35.63
5.15
2.28

100.00
100.00
100.00
84.73
35.63
5.15
2.28

R W.M.M.
3000
Cumulati
AVERAGE %
ve % of
OF PASSING

Cumulati
AVERAGE %
ve % of
OF PASSING
Passing

100
100
100
100
80.07
56.77
16.17

100.00
100.00
100.00
100.00
80.07
56.77
16.17

ul Road from 0.00km to 3.95km and widening and


.95km under Howrah RIDF-XXI.(2nd call) .

Superintending Engineer, Southern Highway

PO Usthi,Dist :-South 24 Parganas

TRIAL-1
13.2MM.

5.6 MM

STONE
DUST

20

15

20

S.D. =

DIFFRENCES

M.

62.50
-0.28
-29.95
-48.76
-63.79
-62.06
-66.01
42.77

GRADING

MINIMUM
MAXIMUM
IRC AVERAGE
COMBINED GRADING

IRC AVERAGE
COMBINED GRADING