0% found this document useful (0 votes)
54 views

Power Quality Tools

The document appears to be a template for evaluating power quality issues, potential solutions, and their costs and benefits. It includes sections to describe power quality disturbances, affected equipment and costs, potential solutions and their costs of installation and maintenance, effectiveness of solutions, and payback calculations to evaluate solutions. The template would be used to analyze specific power quality problems at a facility and identify cost-effective solutions.

Uploaded by

Al-Usmanu Usman
Copyright
© © All Rights Reserved
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
54 views

Power Quality Tools

The document appears to be a template for evaluating power quality issues, potential solutions, and their costs and benefits. It includes sections to describe power quality disturbances, affected equipment and costs, potential solutions and their costs of installation and maintenance, effectiveness of solutions, and payback calculations to evaluate solutions. The template would be used to analyze specific power quality problems at a facility and identify cost-effective solutions.

Uploaded by

Al-Usmanu Usman
Copyright
© © All Rights Reserved
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 18

International Power Quality

Discussion Forum

Power Quality Tools - Disturbance


Name :
Tel. :

Date

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20

Time

Outside environmental
conditions

Power Quality
orum
Power Quality Tools - Disturbance Log Sheet
Company and address:
Info:

Disturbed loads

Disturbance
description

List of alarms

Denis Ruest, P.Eng.


November 2012

Total downtime

List of generated
scrap material

Estimate of scrap
material

Persons-hours
affected

Cost of manpower
losses

Other information

International Power Quality


Discussion Forum

Power Quality Tools - L


Cost of losses for event
type 1
ex. Voltage sag
Part - 1 - Materials
Scrap:
Second quality products:
Remanufacturing costs:
Other (Specify):
Total:

1,500.00 $
500.00 $
0.00 $
0.00 $
2,000.00 $

Improductives:
Cleaning
Process restart:
Overtime to catch-up:
Other (Specify):
Total:

100.00 $
100.00 $
50.00 $
150.00 $
0.00 $
400.00 $

Part - 2 - Workforce

Part - 3 - Lost of Sales


0.00 $
Total:

0.00 $

Damages:
Repairs:
Replacement:
Other (Specify):
Total:

0.00 $
0.00 $
0.00 $
0.00 $
0.00 $

Contract Lost:
Litigations:
Delivery:
Penalities:
Other (Specify):
Total:

0.00 $
0.00 $
0.00 $
0.00 $
0.00 $
0.00 $

Grand Total (GTn):

2,400.00 $

Estimated number of annual events (NbE):

10

Part - 4 - Equipements

Part - 5 - Risks

Estimated Annual Losses


(EAL):

75,000.00 $

Denis Ruest, P.Eng.


November 2012

Quality Tools - Losses Evaluation Sheet


Cost of losses for event
type 2

Cost of losses for event


type 3

Cost of losses for event


type 4

ex. voltage transient

ex. Short interruption

ex. Interruption

1,000.00 $
300.00 $
0.00 $
0.00 $
1,300.00 $

0.00 $
0.00 $
0.00 $
0.00 $
0.00 $

0.00 $
0.00 $
0.00 $
0.00 $
0.00 $

100.00 $
100.00 $
50.00 $
150.00 $
0.00 $
400.00 $

0.00 $
0.00 $
0.00 $
0.00 $
0.00 $
0.00 $

0.00 $
0.00 $
0.00 $
0.00 $
0.00 $
0.00 $

0.00 $

0.00 $

0.00 $

0.00 $

0.00 $

0.00 $

0.00 $
0.00 $
0.00 $
0.00 $
0.00 $

0.00 $
0.00 $
0.00 $
0.00 $
0.00 $

0.00 $
0.00 $
0.00 $
0.00 $
0.00 $

0.00 $
0.00 $
0.00 $
0.00 $
0.00 $
0.00 $

0.00 $
0.00 $
0.00 $
0.00 $
0.00 $
0.00 $

0.00 $
0.00 $
0.00 $
0.00 $
0.00 $
0.00 $

1,700.00 $

0.00 $

0.00 $

30

=_(=1)^4
_ " " _

International Power Quality


Discussion Forum

Part - 1 - Equipment and Comissionning


Acquisition:
Commissionning:
Other (specify):
Total:

Part - 2 - Auxiliairies
Swithgear or Panel:
Transformer:
Labor:
Other (specify):
Total:
Total Acquisition and Installation Cost:

Part - 3 - Annual Maintenance


Parts:
Labor (inspection, cleaning, etc.):
Long Term Maintenance (batteries, etc):
Other (specify):
Total:

Part - 4 - Solution effectiveness to solve problem


Estimated Effectiveness for Event type 1 in % (EE%1)
Estimated Effectiveness for Event type 2 in % (EE%2)
Estimated Effectiveness for Event type 3 in % (EE%3)
Estimated Effectiveness for Event type 4 in % (EE%4)
Estimated Global Effectiveness (%) (EE%):

Part - 5 - Electrical Efficiency Level


Power rating in kVA:
Efficiency Level (%):
Electricy Cost ($/kWh):

Duty cycle (average usage):


Annual Electric Losses:

Part - 6 - Payback (simple method)


Annual Losses (Losses Evaluation):
Annual Maintenance Cost:
Cost of passtrought disturbances:
Annual Electrical Losses:

Annual Savings:

Payback period (years):

Note 1 :

To calculate estimated solution effectiveness add the effectiveness of each solutions (=Effectiv
the estimated annual losses.

Note 2 :

The payback period in years is the total acquisition and installation cost divided by the annual

Describe Objectives: Need to increase ride throught capacity of 200 HP Drive for voltage sags and cap

Solution
No. 1

Comments
3% Input Inductor

7,500.00 $
500.00 $
8,000.00 $
1,500.00 $

Box for inductors

0.00 $
2,000.00 $
200.00 $

2 days
connectors, etc.

3,700.00 $
11,700.00 $

100.00 $
50.00 $
150.00 $

(See Note 1)
0%
90%
0%
0%
61%
6.00
97.00
0.120

100 % switching 0% sag

50%
94.61 $
75,000.00 $
-150.00 $
-28,921.91 $
-94.61 $

45,833.48 $

0.26

(See Note 2)

ctiveness of each solutions (=Effectiveness in % * Cost per event * number annual events) and divide this sum by

nstallation cost divided by the annual savings

Denis Ruest, P.Eng.


November 2012 - rev mai
2013

city of 200 HP Drive for voltage sags and capacitor switchings.


Solution
No. 2

Comments

0.00 $

0.00 $
0.00 $

0.00 $
0%
0%
0%
0%
0%

0.00 $
0.00 $
0.00 $
0.00 $
0.00 $

0.00 $

N/A

ual events) and divide this sum by

%=(_(=1)^4
% _ _ " "
_)/

Solution
No. 3

Comments

0.00 $

0.00 $
0.00 $

0.00 $

0%

0.00 $
0.00 $
0.00 $
0.00 $
0.00 $

0.00 $

N/A

Solution
No. 4

Comments

0.00 $

0.00 $
0.00 $

0.00 $

0%

0.00 $
0.00 $
0.00 $
0.00 $
0.00 $

0.00 $

N/A

You might also like