Hse Management Plan 1
Hse Management Plan 1
: 0002
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
DWG.TYPE
DOC
JAZAN REFINERY & TERMINAL PROJECT-EPC#2
JAZAN
5
SAUDI ARABIA
PLANT .NO
INDEX
DRAWING NO.
J00
VE-678016
JO / EWO: BI - 10 - 01055
SHT. NO.
1
OF
93
REV. NO.
0A
Revision Log
Rev.
No.
Rev. Date
Revised Page
Revision Description
00
Mar. 30, 13
Page- 92
00
Mar. 30, 13
Page- 09
00
Mar. 30, 13
Page- 90
00
Mar. 30, 13
Page- 91
0A
Apr.03, 13
General
Table of Contents
WORK PERMIT SYSTEM
DWG.TYPE
DOC
JAZAN REFINERY & TERMINAL PROJECT-EPC#2
JAZAN
5
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SAUDI ARABIA
PLANT .NO
INDEX
DRAWING NO.
J00
VE-678016
JO / EWO: BI - 10 - 01055
SHT. NO.
2
OF
93
REV. NO.
0A
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
GENERAL . 7
HALS HSE MANAGEMENT ORGANIZATION.........................................................................8
3.
Safety Communications....................................................................................................12
3.3
Safety Function...................................................................................................................12
3.4
3.5
Safety Standards................................................................................................................17
3.6
3.7
3.8
4 TRAINING...........................................................................................................................................34
4.1
General..................................................................................................................................34
4.2
5 SAFETY MEETINGS.........................................................................................................................39
5.1
Monthly/Weekly Meeting...................................................................................................39
5.2
5.3
At the HSE Meeting shall Discuss, Review, Amend, and Establish :.....................40
5.4
5.5
6 SAFETY AUDITS...............................................................................................................................40
6.1
6.2
DOC
JAZAN REFINERY & TERMINAL PROJECT-EPC#2
JAZAN
5
SAUDI ARABIA
J00
VE-678016
JO / EWO: BI - 10 - 01055
3
OF
93
0A
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
6.4
Record of inspection..........................................................................................................44
7 EMERGENCY PROCEDURES........................................................................................................44
7.1
Action to be taken...............................................................................................................44
7.2
Assembly Points.................................................................................................................45
7.3
Help in Emergency.............................................................................................................45
7.4
Fire Brigade..........................................................................................................................45
7.5
Disciplinary Action..........................................................................................................48
12 ENVIRONMENTAL PROTECTION.................................................................................................48
12.1
General..............................................................................................................................48
12.2
Annex.
1. Traffic Regulation
2. Fundamental Safety Rules and Instructions to the Personnel
3. Safety Check / Evaluation Instruction
4. Standard of Safety Facilities
DWG.TYPE
for DOC
Job.
SAUDI ARABIA
PLANT .NO
INDEX
DRAWING NO.
J00
VE-678016
JO / EWO: BI - 10 - 01055
SHT. NO.
4
OF
93
REV. NO.
0A
POLICY STATEMENT
WORK PERMIT SYSTEM
DWG.TYPE
DOC
JAZAN REFINERY & TERMINAL PROJECT-EPC#2
JAZAN
5
SAUDI ARABIA
PLANT .NO
INDEX
DRAWING NO.
J00
VE-678016
JO / EWO: BI - 10 - 01055
SHT. NO.
5
OF
93
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
REV. NO.
0A
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Y
Yung Duk Park
P
President & CEO
1. GENERAL
This HSE plan is a general coverage plan of action on how HAL intends to address HSE
WORK PERMIT SYSTEM
matters
DWG.TYPE
DOC
JAZAN REFINERY & TERMINAL PROJECT-EPC#2
JAZAN
5
SAUDI ARABIA
PLANT .NO
INDEX
DRAWING NO.
J00
VE-678016
JO / EWO: BI - 10 - 01055
SHT. NO.
6
OF
93
REV. NO.
0A
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
HAL confirm that HAL shall comply with all safety regulations, which may be required in
contract.
HAL shall comply with safety laws, regulations and instructions which HAL follow in his sites,
also HAL shall comply with safe operating practices of the owner and shall take all necessary
safety precautions for the accidents related with that would be arisen during the performance
of the Contract in order to protect the work the personnel and the environment.
For ensuring that the work is carried out in a safe manner, HAL shall make sure that the safety
regulations will be strictly followed by all his personnel and subcontractors personnel and the
necessary instructions will be given to each one. The instructions and reports currently used in
HAL are enclosed for reference. HSE Manager and Construction Manager will have the
authority and responsibility to ensure safe working practices and to correct unsafe conditions
and unsafe acts, this will be done by regular controlling, of the safety precautions and by
holding weekly safety meetings.
Also HAL shall supply the personnel all the necessary protection and safety tools, and HAL
shall ensure that all his employees and subcontractor s employees are medically fit and
healthy.
Noting the importance of maintaining the tools, equipment and vehicles operable in good
conditions and meet with standard. HAL shall make regular service checks by assigning a
technicians group for this purpose.
Finally this plan allows HAL to target zero: no negative impact on people and environment
during project execution.
HSE matters can be managed effectively only when they are considered a line responsibility.
Therefore the management is a combined effort by all people involved in the Project. The main
WORK PERMIT SYSTEM
DWG.TYPE
PLANT .NO
SAUDI ARABIA
INDEX
DRAWING NO.
VE-678016
JO / EWO: BI - 10 - 01055
SHT. NO.
7
OF
93
REV. NO.
0A
1) HSE Manager:
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
2) Project Manager:
3) Construction Manager:
4) Construction Supervisors:
5) All Employees:
6) Safety Engineer:
Following is HALs HSE management organization which shall be applicable to this project.
DWG.TYPE
DOC
PLANT .NO
INDEX
DRAWING NO.
SHT. NO.
J00
VE-678016
8
OF
93
SAUDI ARABIA
JO / EWO: BI - 10 - 01055
REV. NO.
0A
BS in Secondary Education
NEBOSH (IGC)
BS in Industrial Engineering
OSHA 30 Hours
OSHA (29-CFR1926)
Diploma in HSE
OSHA (7600)
DWG.TYPE
DOC
JAZAN REFINERY & TERMINAL PROJECT-EPC#2
JAZAN
5
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SAUDI ARABIA
PLANT .NO
INDEX
DRAWING NO.
J00
VE-678016
JO / EWO: BI - 10 - 01055
SHT. NO.
9
OF
93
REV. NO.
0A
Chief
Operating Officer
Sung Ho Cho
0504401485
OSHE
Committee
Con
Project
HSE
Manager
Maxzaldy Laredo
0569484513
Safety Health
Supervisor
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Environmental
Supervisor
Safety Engineer
Rana Muhammad
0592408057
mmm
ra
0592
Con
WORK PERMIT SYSTEM
DWG.TYPE
DOC
JAZAN REFINERY & TERMINAL PROJECT-EPC#2
JAZAN
5
SAUDI ARABIA
PLANT .NO
INDEX
DRAWING NO.
J00
VE-678016
JO / EWO: BI - 10 - 01055
SHT. NO.
10
OF
93
REV. NO.
0A
Project
Manager
Na, Jae-Soon
0580653732
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Field SHE
Coordinator
Rana Muhammad
0592408057
Construction
Supervisors
All employees
* The independent document including the up to date personnels names, contact details and
qualifications will be maintained and provided for client immediately when organization is set
or changed.;
DWG.TYPE
DOC
JAZAN REFINERY & TERMINAL PROJECT-EPC#2
JAZAN
5
SAUDI ARABIA
PLANT .NO
INDEX
DRAWING NO.
J00
VE-678016
JO / EWO: BI - 10 - 01055
SHT. NO.
11
OF
93
REV. NO.
0A
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
The main goal of HAL is to carry out the project execution work with zero: i.e., no
negative impact on people and environment
HAL and the subcontractors are responsible for conducting comprehensive studies on the
designated construction plan, procedures and work schedules and for fully directing their
personnel to achieve accident free operation throughout the construction period.
As mentioned before the HSE Manager will be responsible for compliance with the safety
standards and for reporting safety statistics. All incidents / accidents shall be reported
immediately.
Safety statistics report shall include near-misses, recordable and lost time cases.
The most appropriate tools(English) in a language immediately and easily understood by the
target audience shall be used to convey the safety message. The Safety engineer shall be
responsible for assessing the most effective way of communication and he shall liaise with
HALs safety department where appropriate.
2) Supporting resources to reach the HSE objectives, and implementing and verifying
HSE policy
3) Approving HSE Management Manual
4) Operation of HSE Committee
WORK PERMIT SYSTEM
DWG.TYPE
DOC
JAZAN REFINERY & TERMINAL PROJECT-EPC#2
JAZAN
5
SAUDI ARABIA
PLANT .NO
INDEX
DRAWING NO.
J00
VE-678016
JO / EWO: BI - 10 - 01055
SHT. NO.
12
OF
93
REV. NO.
0A
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
5) Suggestion and review of the long term HSE investment direction for the overall HSE
management of the company, and for the removal of hazard, risk, and environmental
pollution
6) Entrusting the Management Representative with the authority about other HSE matters
This Committee meets quarterly to review the corporate policy with respect to
implementation effectiveness and to address future directions and associated initiatives
2)
Performance indicators
Disciplinary actions
company-wide
HSE
objectives,
and
establishing
HSE
master plan
3) Recording and notifying HSE legal regulation status sheet
management
4) Reflecting HSE management program on business plan considering HSE policy, and
operating it
5) HSE information control
6) Monitoring and measurement of HSE facilities and process
7) HSE training and drill for personnel who have significant HSE factors
WORK PERMIT SYSTEM
DWG.TYPE
DOC
JAZAN REFINERY & TERMINAL PROJECT-EPC#2
JAZAN
5
SAUDI ARABIA
PLANT .NO
INDEX
DRAWING NO.
J00
VE-678016
JO / EWO: BI - 10 - 01055
SHT. NO.
13
OF
93
REV. NO.
0A
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
9) Reporting all affairs relating to HSEMP to the Representative Management, and controlling
HSE standards
10) Emergency preparedness planning and control
11) Supervising subcontractor's HSE conditions
12) Operating HSE committee
13) Planning HSE campaign
14) Governmental affairs relating to HSE, legal registration of HSE personnel, and job training
The Construction Manager is ultimately responsible for general HSE matters and as such his
duties shall include:
1) implementation and evaluation of HSE manual
2) planning and organization of non-project-related safety training
3) organization of company-wide safety campaigns
4) participating in audits where HSE input is required
Construction Manager shall be responsible for the safety of his organization, he shall exercise
the same authority in safety as that exercised in his other responsibilities.
It is his responsibility to ensure that all work is being executed in a safe manner and in
compliance with the safety rules and regulations of the Government Authorities and the owner.
3.3.5. Safety Engineer
The Safety Engineer is responsible for ensuring that the Safety Plan, Site Safety Manual, and
all HAL Safety Rules and Regulations are adhered to for all activities.
He shall himself institute inspections necessary to comply with the rules and regulations, or
WORK PERMIT SYSTEM
DWG.TYPE
DOC
JAZAN REFINERY & TERMINAL PROJECT-EPC#2
JAZAN
5
SAUDI ARABIA
PLANT .NO
INDEX
DRAWING NO.
J00
VE-678016
JO / EWO: BI - 10 - 01055
SHT. NO.
14
OF
93
REV. NO.
0A
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
hold safety committee meetings regularly in order to promote safety consciousness among the
construction employees.
Such individual must be qualified to fulfill the HALs requirements and his job specifications.
The Safety Engineer will report directly to the Construction Manager and will ensure safe work
practices on the Site, during transportation in the Site area and to the Site and all other
activities.
2) Ensure that the safety policies, procedures, and HALs regulations are adhered to in all areas
3) Inspect the work site as often as possible and take appropriate corrective actions, prepare
inspection reports for the Construction Manager for review and action.
4) Hold regular (monthly/weekly) safety meetings at the Site, co-ordinate with the Supervisors
6) Monitor the activities of subcontractor safety personnel to ensure that adequate safety
ensure safety in transportation. Implement a work permit system in accordance with HALs
guidelines and Aramco related procedure.
Superintendent and Supervisors should consider first the prevention of industrial accidents and
be directly responsible to the Construction Manager for the safety of their work activities.
To accomplish any work on schedule and without accident, they shall establish safe work plans
WORK PERMIT SYSTEM
DWG.TYPE
DOC
JAZAN REFINERY & TERMINAL PROJECT-EPC#2
JAZAN
5
SAUDI ARABIA
PLANT .NO
INDEX
DRAWING NO.
J00
VE-678016
JO / EWO: BI - 10 - 01055
SHT. NO.
15
OF
93
REV. NO.
0A
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
and procedures well in advance and ensure that all personnel at the work site are familiar with
them. They should:
1) Ensure that all the work is being conducted in the safest manner and take corrective
measures if deemed necessary.
2) Adjust the construction work schedule and plan, if necessary, to avoid two or more different
jobs being performed in the same location simultaneously. And works should stop in the
same location where it does not in any way lead to possible compromise of safety.
3) Act as a safety committee member and take immediate corrective action if so requested by
the Construction Manager or the Safety Engineer.
3.3.7 Individual Workers:
Each individual worker is responsible for observing all Safety Precautions applicable to his
work and work area. Each individual worker should participate safety training and orientation
prior to work - commence.
The Safety Engineer will ensure that in addition all requirements of HALs Safety Regulations
are met.
The learning points of all accidents and reported near-misses shall be discussed in all safety
meetings in an effort to prevent recurrence of similar accidents.
All accidents, regardless of severity, shall be reported written form immediately to the
Construction Manager via the Safety Engineer or the Supervisor(s) and shall be investigated
by the Safety Engineer. In addition, other preventive measures shall be taken. Detail of
incidents by telephone to the owners representative by the construction Manager.
The Safety Engineer shall complete the Accident Reports and submit it to the Construction
Manager further, an accident report as required by owner shall also be prepared and submitted
to the owners Representative.
WORK PERMIT SYSTEM
DWG.TYPE
DOC
JAZAN REFINERY & TERMINAL PROJECT-EPC#2
JAZAN
5
SAUDI ARABIA
PLANT .NO
INDEX
DRAWING NO.
J00
VE-678016
JO / EWO: BI - 10 - 01055
SHT. NO.
16
OF
93
REV. NO.
0A
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
When an accident involving personal injury or property damage occurs, the Construction
Manager shall promptly take the following action:
1) Confirm the name of the injured person(s) together with the nature and extent of the
injuries, and also whether or not necessary medical treatment has been given.
2) Check if the work has been suspended and the area roped off and properly guarded in
preparation for the investigation by the related authorities.
3) In the case of property damage, determine the extent of the damage and ensure that no
further damage will occur.
4) Prepare or obtain photographs (Taking a picture should receive permit from Aramco or the
authority party), diagrams and sketches as warranted by the circumstances.
5) Report to the owner, police, fire station and/or other local government authorities as
required by the local regulations.
6) Report the same to the Project Manager by telephone or fax. An accident report shall be
prepared and forwarded to the Project Manager as soon as possible within 24 hours. Near
misses also report to construction manager and propagate all personnel on site for
preventing the accident avoidance methodology.
3.5.1
Briefing
The Safety Engineer shall brief each supervisor on all specific HAL HSE requirements during
the project mobilization phase. To complete this awareness program he shall summarize these
briefings during the first project safety meetings for office based personnel as well as the first
meeting for site based personnel. Safety briefing shall include the following - purpose of safety
briefing/ outline and description of the project / HSE objectives / safety policy/hazard
management/emergency response/ accident and incident reporting/ traffic management/drug
and alcohol policy etc.
DWG.TYPE
DOC
JAZAN REFINERY & TERMINAL PROJECT-EPC#2
JAZAN
5
SAUDI ARABIA
PLANT .NO
INDEX
DRAWING NO.
J00
VE-678016
JO / EWO: BI - 10 - 01055
SHT. NO.
17
OF
93
REV. NO.
0A
3.5.2
Up-to-date
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
HALs Construction Manager is responsible for implementation of the HSE Manual. He shall
ensure that all supervisory staff has an up-to-date copy of the mutual for his personal use as
well as the use by his subordinates.
3.5.3
Disciplinary Action:
HAL will take appropriate disciplinary action against those who violate safety rules and
regulations and/or cause accidents by ignoring such rules and regulations.
DWG.TYPE
DOC
JAZAN REFINERY & TERMINAL PROJECT-EPC#2
JAZAN
5
SAUDI ARABIA
PLANT .NO
INDEX
DRAWING NO.
J00
VE-678016
JO / EWO: BI - 10 - 01055
SHT. NO.
18
OF
93
REV. NO.
0A
Disciplinary Classification
Classification
Seriou
s
Disciplinary Grade
Result
of Accident
Damage of
Great Accident
Person
(Death)
Damage of
More than
Property
3000USD
Responsible Person
Accide
nt
ditto
1. Diagnosis
over 12
weeks
Gener
al
Damage of
Accide
Person
nt
2. Diagnosis
under 12 weeks
3. Slight
Reprimand
Accident
DWG.TYPE
DOC
JAZAN REFINERY & TERMINAL PROJECT-EPC#2
JAZAN
5
SAUDI ARABIA
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PLANT .NO
INDEX
DRAWING NO.
J00
VE-678016
JO / EWO: BI - 10 - 01055
SHT. NO.
19
OF
93
REV. NO.
0A
Disciplinary Grade
Result
Classification
of Accident
Responsible Person
Salary reduction
1. Between
100USD and
General
Accident
Damage
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
3000USD
Dismissal
of
Property
Reprimand
2. Under
100USD
Salary reduction
Others
Warning
Reprimand
DWG.TYPE
DOC
JAZAN REFINERY & TERMINAL PROJECT-EPC#2
JAZAN
5
SAUDI ARABIA
PLANT .NO
INDEX
DRAWING NO.
J00
VE-678016
JO / EWO: BI - 10 - 01055
SHT. NO.
20
OF
93
REV. NO.
0A
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
For all driving activities, the appropriate sections of The Fundamental Safety Rules (refer to
Annex No.2) shall be applied.
These rules shall apply to all personnel working on the project.
Newly employed staff will be trained in accordance with HALs employee introduction program.
During the construction phase of the project at least one audit will be dedicated for road safety
focusing on drivers awareness and on vehicles standards.
3.6.2 Subcontractors
As mentioned before, all subcontractors personnel involved in the project, irrespective of their
background, will abide by this HSE plan.
Therefore all procedures, requirements, audits and schemes mentioned shall apply in full for all
subcontractors. Obviously in the selection process of subcontractors past HSE performance
shall play an important role to allow the overall project organization to target zero: no negative
impact on people and environment during project execution.
This specification is prepared as guidelines to establish firm plant/process safety check system
by doing rigorous safety check and thereby to safeguard the plant units in the course of precommissioning and commissioning stages.
commissioning, especially can be used as a rigorous process safety check list before feed-in
start-up operation. But this is not the full safety working procedures.
WORK PERMIT SYSTEM
DWG.TYPE
DOC
JAZAN REFINERY & TERMINAL PROJECT-EPC#2
JAZAN
5
SAUDI ARABIA
PLANT .NO
INDEX
DRAWING NO.
J00
VE-678016
JO / EWO: BI - 10 - 01055
SHT. NO.
21
OF
93
REV. NO.
0A
3.7.3
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
1) It is utmost important to ensure all the plant systems are in place and in safe status for the
start-up and operation of plant.
2) Safeguarding the plant as well as workers in the start-up stages are one of the major
responsibilities of the Commissioning Manager by utilizing the start-up operating line
organization and Safety Managing Staffs.
3) The Commissioning Manager shall concentrate on the process wise safety management in
the course of pre-commissioning and commissioning.
4) The Construction Manager (or HSE Site Manager) shall cover and maintain general plant
safety management system as a backup of start-up safety.
5) The simple conforming to this Plant Start-up Phase Safety Check and Review cannot
fully prevent all hazards or incidents. Be sure that all the site activities in these stages
should be executed to the safe and standard procedures by the start-up crews and
maintenance personnel themselves.
3.7.4 Start-up Safety Checking Area
The main items and area for the Start-up Safety Checking are composed of:
1) The availability and usages of all the relevant documents, references, tools by the start-up
Team and safety check team
2) General running status of the Plant Safety Control Management System
3) Safe Handling System & Procedures for hazardous materials
12) Compressors,
WORK PERMIT SYSTEM
Pumps
DWG.TYPE
DOC
SAUDI ARABIA
PLANT .NO
INDEX
DRAWING NO.
J00
VE-678016
JO / EWO: BI - 10 - 01055
SHT. NO.
22
OF
93
REV. NO.
0A
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
The above safety items checking are NOT the safety working procedures
themselves. These are the tool for general evaluation of plant safety status or safety
control level during pre-commissioning and commissioning stages.
At least two times per month of full scope safety check shall be performed under Startup
Managers major responsibilities.
(2) Before Feed-in and Commissioning
A thorough and full scope of pre-startup safety check/review shall be performed by the prestartup safety review group consisting of startup, construction/ maintenance, safety, project
teams.
(3) During Startup Operation
Additional process safety checking can be done at the Commissioning Managers discretion.
1) Safety Check and Evaluation Procedure for Pre-commissioning
STEP
WORK PERMIT SYSTEM
ACTION ITEMS
PLANT .NO
INDEX
Planning and request DWG.TYPE
for pre-commissioning
safetyDRAWING NO.
check/review.
DOC
RESPONSIBILITY
SAUDI ARABIA
J00
VE-678016
JO / EWO: BI - 10 - 01055
SHT. NO.
REV. NO.
Commissioning
23
Manager
OF
93
0A
"
Engineer).
3
Assigned Checkers
Each Function
Commissioning
check/review/correction.
Manager
Commissioning
Manager
2)
ACTION ITEMS
RESPONSIBILITY
PLANT .NO
INDEX
Planning and request DWG.TYPE
for pre-startup
safety
DOC
JAZAN
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SAUDI ARABIA
J00
DRAWING NO.
VE-678016
JO / EWO: BI - 10 - 01055
SHT. NO.
REV. NO.
Commissioning
24
OF
93
0A
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Manager (Safety
meeting.
Review Group
Chairman)
"
Assigned Checkers
Each Function
Scribe /
Commissioning
Manager
It is proposed that this Safety Review Group should consist of the following participants from
relevant functional departments.
WORK PERMIT SYSTEM
DWG.TYPE
DOC
JAZAN REFINERY & TERMINAL PROJECT-EPC#2
JAZAN
5
SAUDI ARABIA
PLANT .NO
INDEX
DRAWING NO.
J00
VE-678016
JO / EWO: BI - 10 - 01055
SHT. NO.
25
OF
93
REV. NO.
0A
PARTICIPANTS
ACTING AS
Commissioning Manager
Construction Manager
as Vice-chairman or Maintenance
Manager
Safety Engineer
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
as Checking Members
Superintendent
Construction / Maintenance
Supervisors, Specialists
Members
Project Engineer
as Scribe or Coordinator
(1) Introduction of topics for discussion and hand-out of related meeting materials
(2) Examination and briefings of mechanical completeness progress
(3) Overall planning of Pre-Startup Safety Review execution (Initial Meeting)
-
(5) Final Pre-Startup Safety Review Evaluation and approval for processing to Startup (Final
Meeting)
Commissioning Manager, Construction Manager and Project Engineer together should prepare
and provide the followings for execution of plant safety check and evaluation
1) Conference room and facilities for meeting
PLANT .NO
JAZAN
JAZAN
5
DWG.TYPE
INDEX
DRAWING NO.
SHT. NO.
REV. NO.
JO / EWO: BI - 10 - 01055
93
checking
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
3) All the references including manuals, standards, procedures, documents, drawings, data,
check sheets, reports, etc. that may be utilized in the plant safety aspects evaluation.
3.7.7 Follow-up for safety check / Evaluation
1) Documentation
(1) Full records of safety check/evaluation will be kept on permanent file by the Safety
Engineer (or HSE Site Manager) in Startup Group files.
(2) Copy of such records can be shared by Construction Group, Project Control Group, or
Home Office Safety Auditor Group.
2) Reporting
(1) Copy of the report by Pre-Startup Safety Review Group, the Startup Approval Document,
and other important safety matters should be sent to HAL, Commissioning Team, Project
Manager, QA department.
(2) Another copy of the report to owner on their request.
3.7.8 Safety Audit
1) Safety Audit
This group can consist of safety supervisors from QA Department, Process Safety Team,
Construction Department, or other specialists depending on the site progressing status.
2) General Scope of Safety Audit
(1) Documents / Reference Review
When the safety audit is done during pre-commissioning and commissioning stage, any
records of safety check/evaluations by the Startup Group or by the Pre-Startup Safety Review
PLANT .NO
of report on safetyDWG.TYPE
audit results
DOC
JAZAN REFINERY & TERMINAL PROJECT-EPC#2
JAZAN
5
SAUDI ARABIA
J00
INDEX
DRAWING NO.
VE-678016
JO / EWO: BI - 10 - 01055
SHT. NO.
27
OF
93
REV. NO.
0A
A. General
1) Personal protective devices shall be used as the following description.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
2) Items of personal issue shall be inspected regularly and maintained in serviceable and
sanitary condition and, before being reissued to another person or returned to storage,
should be cleaned, disinfected, and repaired or replaced..
3) Person working on electrical distribution systems shall be provided with
linemen's belts, insulating gloves, insulating hoods, insulating blankets, insulating line
hose, and hot line tools as necessary, which shall be tested and maintained in safe
condition.
4) Electric welding, gas welding, cutting brazing pressure and fusion welding, and operations
where protection form radiant energy with moderate reduction of visible light is necessary
shall require goggles, face masks, shields, or helmet, suitable to the type of work,
providing protection from all angles of direct exposure, and lenses of appropriate shade.
5) Persons handling rough, sharp-edged, abrasive materials or where the work
subjects the hands to lacerations, punctures, burns, or bruises shall use hand protection.
6) Persons exposed to vehicular traffic, such as signalpersons, spotters inspections and
others shall wear a reflective belts or apparel 'marked with a reflectorized or high visibility
material.
B. Hard Hat
WORK PERMIT SYSTEM
1) It
JAZAN
JAZAN
5
PLANT .NO
INDEX
DRAWING NO.
SHT. NO.
REV. NO.
is the policy of the Company and
a condition
of
employment
that all employees
and
DWG.TYPE
DOC
28 hat area.
Contractor's shall wear approved
safetyJ00
helmets
in the safety hard
A when VE-678016
REFINERY & TERMINAL PROJECT-EPC#2
OF
0A
SAUDI ARABIA
JO / EWO: BI - 10 - 01055
93
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
3) Hard hat areas shall be general areas such as construction, alteration, demolition,
dredging, quarry, building, or similar related field activities rather than specific portions of a
building or project.
C. Respiratory Protection
1) RPE stands for respiratory protective equipment which refers to equipment specially
designed to provide protection against inhalation of toxic concentration of dusts, other
particulates, vapors, gases, etc. .When respiratory protective equipment is required, a
respiratory protection program shall be developed and implemented and respiratory
protective equipment specified shall be selected, provided, fitted, used, maintained, stored
and personnel shall be trained.
2) Only approved respiratory protective devices shall be provided and used to protect against
exposure to hazardous atmospheres containing dusts, fibres, fumes, mists, gases,
vapours, other contaminants, atmospheres deficient in oxygen or otherwise considered
immediately dangerous to life or health.
3)
Respiratory devices using compressed oxygen, liquid air, liquid oxygen, or mixed gases
are prohibited unless approved prior to use by the designated authority(construction
manager & safety engineer) .
4)
A compressor used to supply breathing air shall be constructed and situated to avoid entry
of contaminated air into the air supply system.
5)
Breathing air type compressors shall be designed specifically for intended use and shall
be equipped with an approved regulator, a suitable in-line air-purifying solvent bed and
filter inserted into the supply line to assure breathing air quality.
6) All oil-lubricated compressors will be equipped with required operational safety devices and
reservoirs or equivalent devices, with sufficient capacity to enable the respirator wearer to
escape from a contaminated atmosphere in case of equipment failure.
WORK PERMIT SYSTEM
DWG.TYPE
DOC
JAZAN REFINERY & TERMINAL PROJECT-EPC#2
JAZAN
5
SAUDI ARABIA
PLANT .NO
INDEX
DRAWING NO.
J00
VE-678016
JO / EWO: BI - 10 - 01055
SHT. NO.
29
OF
93
REV. NO.
0A
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
a) The identity and concentration of the contaminant are known and have adequate
sustained warning properties.
b) The oxygen content of air is at least 18.0%
c) There is periodic monitoring of the work area.
d) The respirator assembly is approved for protection against the specific contaminants and
concentration level to be encountered.
e) The type and model of respirator to be used has been successfully fit tested on the
wearer.
9) Where the atmosphere is determined not to be immediately dangerous to life or health all
employees shall wear as a minimum, supplied-air-line respirators in areas where either of
the following conditions exist :
b) Abrasive blasting or spraying with harmful substances where high concentrations of that
substance are present.
10) If air-line respirators are used, the supplied air source shall not be able to be expended
and the hose length cannot exceed 90m from source to user.
11)
No person shall be permitted in atmospheres containing less than 19.5 % oxygen without
wearing an approved type or a combination pressure-demand air-line respirator with an
integral lay self-contained air supply of at least 15 minutes.
12)
13) Welding, cutting, or heating in any enclosed space involving toxic metals, such
WORK PERMIT SYSTEM
DOC
PLANT .NO
INDEX
DRAWING NO.
J00
VE-678016
SHT. NO.
REV. NO.
DWG.TYPE
as listed below, shall be performed
with general mechanical ventilation, air-line
SAUDI ARABIA
JO / EWO: BI - 10 - 01055
30
OF
93
0A
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
14) The wearer of a respirator equipped with a full face-place, helmet, hood or suit shall not
be allowed to wear contact lenses.
15) If a spectacle, goggle, face-shield, or welding helmet must be worn with a face-piece, it
shall be worn so as not to adversely affect the seal or the face-piece to the face.
D. Safety Net
1) Workers work places over water, machinery, dangerous operations or more than 7m above
the surface shall be protected by safety nets. Nets shall be installed as close under the
work surfaces as practical but in no case more than 7m below such work surface. Nets
shall be hung with sufficient clearance to prevent contact with the surfaces or structures
below, such clearance shall be determined by impact load testing.
2) Where traffic or workers are permitted to be under a work area, safety nets may be utilized
to satisfy the overhead protection requirement.
3) Nets for overhead protection shall be lined with wire or synthetic netting of not more than
2.5cm mesh. Wire mesh shall be made of not less than 22 gage wire and synthetic mesh
of not less than Number 18 twine.
4) Nets shall extend 2.4m beyond the edge of the work surfaces where workers are exposed.
5) The maximum mesh size of nets shall be 15cm x 15cm
WORK PERMIT SYSTEM
DWG.TYPE
DOC
JAZAN REFINERY & TERMINAL PROJECT-EPC#2
JAZAN
5
SAUDI ARABIA
PLANT .NO
INDEX
DRAWING NO.
J00
VE-678016
JO / EWO: BI - 10 - 01055
SHT. NO.
31
OF
93
REV. NO.
0A
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
7) Nets shall be inspected daily for cuts and damage from abrasions, chemicals, or heat.
Repairs shall be made before work above the net is resumed.
8) Debris shall be removed from safety nets at least daily and combustible materials shall be
removed before welding, cutting, or other operations producing sparks, slag, or other
ignition sources above the net.
9) HAL shall primary address appropriate personal protective equipment and working platform
in accordance with OSHAs recommendation. Nets shall install as secondary safety facility
for preventing from falling accident at height working.
E. Safety Shoes
1) To prevent injuries to the feet caused by protruding or falling objects, all employees working
in the yard shall wear safety shoes fitted with a steel toed cap..
2) All contract employees shall wear safety shoes or any other acceptable footwear approved
by the Safety Department.
3) The wearing of slippers or walking barefooted is prohibited in all workshop & at construction
areas.
F. Safety Goggles
1) To prevent eye injuries whilst working, an employee engaged in cutting shall wear
safety goggles. Everybody on site except for an office trailer shall wear safetyglasses his eye protection.
2) The stores shall provide safety goggles to employees who are specifically engaged as
cutters under the following conditions:
a)
WORK PERMIT SYSTEM
SAUDI ARABIA
J00
VE-678016
JO / EWO: BI - 10 - 01055
32
OF
93
0A
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
3) Employees engaged in other trades which may require the use of Safety Goggles for
cutting shall obtain them on a loan basis from the stores.
G. Safety Belt
1) Hardware for lineman's body belts, safety straps, and lanyards shall be drop forged or
pressed steel and have a corrosive resistive finish and surfaces shall be smooth and free
of sharp edges.
2) Buckles shall withstand a 900kg tensile test.
3) D-ring shall withstand a 2.27ton tensile test without fall.
4) The cushion part of the body belt shall
a) Contain no exposed rivets inside
b) Be at least 7.5cm in width
c) Be at least 0.4cm thick
5) Copper, steel, or equivalent liners shall be used around bar of D-rings to prevent wear
between these members and the leather of fabric enclosing them.
6) Safety belt should be thoroughly examined by a competent person at least every three
months using appropriate checklist for recording of inspection.
H. Hearing Protection
1) Where Hearing Protection Equipment(HPE) is required , the type of HPE to be used shall
be based on the area sound level and frequency and physical characteristics of the HPE
2) This will be determined after a noise survey of the area has been undertaken. Where
possible a selection of HPE is to be provided.
Protection
DWG.TYPE
DOC
JAZAN REFINERY & TERMINAL PROJECT-EPC#2
JAZAN
5
SAUDI ARABIA
PLANT .NO
INDEX
DRAWING NO.
J00
VE-678016
JO / EWO: BI - 10 - 01055
SHT. NO.
33
OF
93
REV. NO.
0A
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
4. TRAINING
4.1
General
HAL will identify general and mandatory training requirements for all categories of staff based
upon HSE risk in their work category. Safety training program will be developed and
maintained sufficient to ensure all staffs attend mandatory training requirements in a timely
manner.
HAL will maintain a written record of all training attended by staff and Sub-contractor
staff shall attend the same level of training as HAL staff.
DWG.TYPE
DOC
JAZAN REFINERY & TERMINAL PROJECT-EPC#2
JAZAN
5
SAUDI ARABIA
PLANT .NO
INDEX
DRAWING NO.
J00
VE-678016
JO / EWO: BI - 10 - 01055
SHT. NO.
34
OF
93
REV. NO.
0A
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Coverage: All new employee including HAL Management and staff, and Subcontractors
management, staff and workers. Attendees shall sign on the training record after safety
training program.
When: upon arrival at the construction site and in advance of assignment to site.
Group and duration: 2 hours for a group of approximately 30 persons at one time.
Training material : text, overhead projector or video (Training material shall be kept
With the training record)
Contents of training :
Emphasize the importance of HSE
HSE policy and targets
Orientation of the site layout and the work place, using maps/drawings, etc. especially for
the restricted areas to entry, such as the owners property, etc.
Outline of the work scope
HSE organization and the individuals duties and responsibilities for HSE. Working rules
(duly hours, over-time work, holidays, transportation, housekeeping, etc.)
HSE rules and regulations (gate control, possession of ID card, smoking rules, substance
abuse rules, traffic rule, etc.)
Enforce use of proper personal protective equipment (safety belt, helmets, goggles, gloves,
dust/gas masks, respirators, etc.)
Proper working garment and footwear outline and work permit procedures (work items or
locations to be subjected, obtaining procedures, etc.)
DWG.TYPE
DOC
JAZAN REFINERY & TERMINAL PROJECT-EPC#2
JAZAN
5
SAUDI ARABIA
PLANT .NO
INDEX
DRAWING NO.
J00
VE-678016
JO / EWO: BI - 10 - 01055
SHT. NO.
35
OF
93
REV. NO.
0A
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Contents of training : in addition to the contents of the HSE induction training, the
following shall be included.
Observe the HSE policy and monthly HSE targets which are established by the HSE
committee.
DWG.TYPE
DOC
JAZAN REFINERY & TERMINAL PROJECT-EPC#2
JAZAN
5
SAUDI ARABIA
PLANT .NO
INDEX
DRAWING NO.
J00
VE-678016
JO / EWO: BI - 10 - 01055
SHT. NO.
36
OF
93
REV. NO.
0A
Committee meeting and other safety meeting (type, frequency, participants, objectives,
Etc.)
Action to be taken when detecting unsafely : acts and unsafe working conditions (hold
work, prohibition of use of facilities, and making reports)
Group and duration : two hours for a group assigned in the job
DWG.TYPE
DOC
JAZAN REFINERY & TERMINAL PROJECT-EPC#2
JAZAN
5
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SAUDI ARABIA
PLANT .NO
INDEX
DRAWING NO.
J00
VE-678016
JO / EWO: BI - 10 - 01055
SHT. NO.
37
OF
93
REV. NO.
0A
Exemption
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Workers who have a license or permit issued by a third party or who are acknowledged by the
HSE manager to be experienced with the job may be exempted from the above training
course.
Any employee who has seriously or repeatedly violated any HSE rules and requirement or who
has been designated by HSE manager shall take HSE training for refresher course to enhance
their HSE awareness and reinforce their HSE knowledge.
A regular refresher course will be instructed by competent personnel designated by the HSE
manager every six month. But any employee who has repeated violation should take a HSE
training prompt. If one were to continuous violation, He would be disciplined according to
Disciplinary Regulation (Page15-16).
When the safety training or education has been performed, trainer in charge shall complete
and maintain the records of training and education.
DWG.TYPE
DOC
JAZAN REFINERY & TERMINAL PROJECT-EPC#2
JAZAN
5
SAUDI ARABIA
PLANT .NO
INDEX
DRAWING NO.
J00
VE-678016
JO / EWO: BI - 10 - 01055
SHT. NO.
38
OF
93
REV. NO.
0A
SAFETY MEETINGS
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
HSE manager shall establish a regular schedule for HSE meeting with owner and invite owner
to attend and maintain records of personnel attendance to manage and communicate
Effectively. The project manager shall manage and monitor the HSE activities and taking action
and provide resources to support their objectives and work activities.
The HSE manager shall hold monthly/Weekly meeting with HSE committee that consist of
construction manager, HSE manager and discipline leader to discuss HSE activities. At the
construction stages, HAL and subcontractors manager will attend at this meeting to
communicate their opinions and/or direction to all member. HSE committee shall plan,
coordinate, implement and maintain the overall HSE activities control during construction
including pre-commissioning and commissioning.
First aid training and rescue training and promote HSE working habits and attitudes.
DWG.TYPE
DOC
JAZAN REFINERY & TERMINAL PROJECT-EPC#2
JAZAN
5
SAUDI ARABIA
PLANT .NO
INDEX
DRAWING NO.
J00
VE-678016
JO / EWO: BI - 10 - 01055
SHT. NO.
39
OF
93
REV. NO.
0A
5.3 At the HSE Meeting shall Discuss, Review, Amend, and Establish :
1)
5.4
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
A Safety Meeting shall be held at the owners office at least on monthly basis, to discuss
aspects related to the activitys safety. The meeting shall be attended by all HSE committee
and Subcontractors Key personnel. In general, the following topics shall be discussed:
1) Check of results of decisions made at previous meetings;
2) Information and co-ordination intended for the safety of activities to be carried out;
3) Control of personnel training level, examination of drill results;
4) Analyses of accidents, including those that caused no damage, in order to prevent them
from happening again. The line managers concerned will describe these cases and start
the discussion with any corrective measures to be taken.
5) Approval of previously suggested corrective measures;
5.5
DWG.TYPE
DOC
JAZAN REFINERY & TERMINAL PROJECT-EPC#2
JAZAN
5
SAUDI ARABIA
PLANT .NO
INDEX
DRAWING NO.
J00
VE-678016
JO / EWO: BI - 10 - 01055
SHT. NO.
40
OF
93
REV. NO.
0A
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Minutes of the meeting shall be prepared by HAL and a verbal conformation shall be sent to
the owner and any subcontractors concerned.
On a regular basis, HAL shall review safety aspects discussed at the meetings, implement a
program aimed at remedying unsatisfactory situations and inform the owner about them.
SAFETY AUDITS
6.1
The purpose of scheduled HSE inspection and audit is to identify the potential safety
hazards, environmental hazards and problems of operability attributable to deviation
from HSE requirements.
That is essential to recommend an alternative that will eliminate the root cause of a potential
incident and to reduce the probability of occurrence of a potential incident.
6.2
The HSE inspection and audit shall be performed to conform that HSE activities comply with
related procedures and verify the conformance and effectiveness of this project HSE
management system.
WORK PERMIT SYSTEM
DWG.TYPE
DOC
JAZAN REFINERY & TERMINAL PROJECT-EPC#2
JAZAN
5
SAUDI ARABIA
PLANT .NO
INDEX
DRAWING NO.
J00
VE-678016
JO / EWO: BI - 10 - 01055
SHT. NO.
41
OF
93
REV. NO.
0A
Description
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Activity
Frequency
Action by
Remarks
Supervisory
2 times/day
Supervisors
Each
Inspection
supervisory
personnel &
subcontractor
Advisory
2 times/day
Inspection
Safety
HSE manager
engineer
&
subcontractor
Site patrol
Daily
Const.
Manager,
superintendent
Inspection
HSE patrol
Monthly
Safety
engineer
Matl/Equip.
As required
Check
Safety
As take in/out
engineer
Hazardous
matl/
Equipment at
gate
Special
As required
Inspection
Designated by
Const.
Manager
Regular
Audit
Biannually
audit
Quality,
Evaluation for
Environmental
project HSE
and safety
performance
team
Extra audit
As required
ditto
Guide or
training
The HSE inspection and audit is to conduct organized site inspection so as to keep under
WORK PERMIT SYSTEM
JAZAN
JAZAN
5
DWG.TYPE
PLANT .NO
INDEX
DRAWING NO.
SHT. NO.
REV. NO.
control and correct all circumstances, which affect the safety and health of the employees and
DOC
42
J00
A
VE-678016
REFINERY & TERMINAL PROJECT-EPC#2
OF
0A
SAUDI ARABIA
JO / EWO: BI - 10 - 01055
93
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
6.3.1
1) HSE management
2) HSE consciousness
3) HSE utilities
4) Fire prevention
5) Health and hygiene
6) Environmental control system (ISO 14001)
6.3.2
1) House keeping
2) Protection from falling hazard
3) Personnel protection equipment
4) Electrical hazard
5) Maintenance of machinery
6) Site security
7) Cranes and lifting operations
8) Fire & explosion hazard
9) Bulletin and signboards
10) Scaffold
11) Protection of excavation, etc.
HSE inspection of the construction site shall be conducted in accordance with the inspection
procedure. All HSE inspections except for the safety patrol shall be conducted by use of the
WORK PERMIT SYSTEM
HSE checklist.
DWG.TYPE
DOC
SAUDI ARABIA
PLANT .NO
INDEX
DRAWING NO.
J00
VE-678016
JO / EWO: BI - 10 - 01055
SHT. NO.
43
OF
93
REV. NO.
0A
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Any deviation observed during the inspection should be noticed to the supervisor responsible
for corrective actions as soon as possible.
7.
EMERGENCY PROCEDURES
HAL and its subcontractors personnel will be instructed of the actions to take in the event of
serious personnel injury, fire, explosion, critical damages to operating equipment, etc. The
construction manager, or his delegated assistance while he is absent, shall be the person to
decide when an emergency alarm (signal characteristic to be established) shall be put into
activation.
7.1
Action to be taken
In an emergency, or on hearing the alarm, every supervisor shall ensure the following:
1) All work is stopped at once.
2) All equipment is shut down (all sources of ignition)
3) All men are evacuated to a pre-determined assembly point
4) A roll call is taken and every is account for.
5) No one is permitted to return to work until notification has been received from the company
representative that it is safe to do so.
6) Crane driver to make safe their load
7.2
Assembly Points
HAL shall inform personnel during orientation meeting as to the locations of specific points and
evacuation routes from all areas of work. In determining evacuation routes and locations of
assembly points, wind directions and neighbouring plants wall be considered. Location plan
shall specify at orientation meeting by construction manager.
WORK PERMIT SYSTEM
DWG.TYPE
DOC
JAZAN REFINERY & TERMINAL PROJECT-EPC#2
JAZAN
5
SAUDI ARABIA
PLANT .NO
INDEX
DRAWING NO.
J00
VE-678016
JO / EWO: BI - 10 - 01055
SHT. NO.
44
OF
93
REV. NO.
0A
7.3
Help in Emergency
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
When transmitting a message by telephone, radio, or messenger, ensure that the person
clearly identifies himself by giving :
1) Exact location
2) Nature of emergency
3) Service required and repeat the message
4) Transmissions name
5) Stay on the telephone until further instruction to hang up. If possible, post a lookout to
direct the ambulance or fire truck to the right location.
6) All men are evacuated to a pre-determined assembly point
Fire brigade including rescue and first aid team will be organized from among staff and craft
personnel practice drills shall be scheduled and conducted to test and perfect the standby selfhelp plan.
All subcontractors personnel will be instructed of the actions to be taken in the event of serious
personnel injury, fire, explosion and critical damage to operating equipment, etc.
8.
Employees must keep their working areas tidy at all times. In particular, trailing leads and
hoses should be kept to a minimum, with crossing of pathways/stairways avoided, where
possible.
WORK PERMIT SYSTEM
SAUDI ARABIA
J00
VE-678016
JO / EWO: BI - 10 - 01055
45
OF
93
0A
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
1) Work place/site shall be maintained to the highest standards of housekeeping at all times.
2) Floors, steps and stairs shall be kept clean and free from oil, grease and slippery
substance
4) Escape routes and access to safety equipment shall not be restricted/obstructed in any
way.
5) Materials and equipment delivered to site prior to installation shall be kept in the store laydown areas or elsewhere only with approval of Construction Manager.
6) The accumulation of packaging, waste, rubbish, off cuts, debris and other unwanted
material is not allowed. The debris shall be disposed safely at least once per day.
7) Cables, hoses and pipe work supplying power and utilities to work areas shall be neatly
laid or hung so as to not interface with access or be a trip hazard.
9. FIRST AID
On the construction site the Safety Engineer will ensure that at least one fully qualified first
aider (full-time) and his assistant (part time) due to first aiders vacancy shall always stand by
on site.
All construction supervisors will be trained to treat first aid cases specifically related to the
health hazardous tasks.
First Aid equipment should be kept in a wooden case in a clean place, preferably in an office,
under the control and custody of the appointed qualified person who shall be responsible for
maintaining stocks for dressings, etc. Even for site with first aid rooms and qualified First
Aiders, only the minimum necessary treatment shall be given on site. The services of a doctor
or hospital shall be sought for all serious injuries.
WORK PERMIT SYSTEM
DWG.TYPE
DOC
JAZAN REFINERY & TERMINAL PROJECT-EPC#2
JAZAN
5
SAUDI ARABIA
PLANT .NO
INDEX
DRAWING NO.
J00
VE-678016
JO / EWO: BI - 10 - 01055
SHT. NO.
46
OF
93
REV. NO.
0A
10. DRILLS
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
HAL will carry out the regular emergency response exercise as below to identify the
requirements of evacuation of labour from the project site, handling of accident and
emergency. And provide emergency response duties in the event of the fire, explosion in the
site.
The kinds of
exercise
Fire drill
2
3
Evacuation
Gas leakage
Accident
annually
Annually
Annually
semi-
(injury)
annually
Period
semi-
HAL
Charge
Subcontr
actor
X
X
X
X
11.
Remark
s
Any employee, subcontractor or agent who is in breach of provisions for the following will be
subjected to disciplinary action which may include instant dismissal without compensation.
1) Smoking is strictly not allowed in work site and project premises where prohibited. (But it
is allowable at limited designated area)
2) All HAL personnel and subcontractors/agents, while performing work or at any work site
premises shall be free from the influence of any alcohol, illegal drug or other prohibited
substance.
3) Employees and subcontractors/agents are not allowed to use legal drug illicitly and they
shall not use, possess, distribute, buy or sell alcohol or illegal drugs while performing their
work or at any work site premises.
4) The safety engineer shall see to the strict adherence to the policy by all workers.
JAZAN
JAZAN
5
INDEX of alcohol
DRAWING
NO. adversely
SHT. NO. affect
REV. NO.
believes that the misuse of drugs
and PLANT
the .NO
abuse
can
DWG.TYPE
JO / EWO: BI - 10 - 01055
93
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Environmental protection is very important to keep the clean air, water and nature.
As clearly stated in HSE policy, HAL shall ensure adequate protection and preservation of the
environment in his area of operations. HAL herewith summarize the typical Environmental
Protection Plan as follow;
1)
Soil Management
HAL shall perform her operations in such a manner as to avoid soil contamination.
The use of lift pumps to transfer oil and fuel from one container to another shall be
encouraged.
If the volume being transferred is small, funnel shall be used and the container shall make
contact with the funnel.
However if for any reason spill occurs due to HALs operations the topsoil shall be scooped out
and replaced with a fresh soil.
Paints, metals and other chemicals shall not be buried under the soil.
2)
Pollution Control
To prevent pollution of the environment, all HAL equipment shall be dully maintained to avoid
the emission of smoke and the dripping of oil.
In the cause of operations if any equipment is observed to be leaking oil, a drip-plate shall be
positioned to collect the oil drip in the interim before the equipment is sent for repairs. While a
drip-plate used, Watchman should company with extinguisher in view of the fire risk.
As stated above, containment shall be provided to avoid oil pollution.
Waste shall not be thrown into any body of water.
WORK PERMIT SYSTEM
DWG.TYPE
DOC
JAZAN REFINERY & TERMINAL PROJECT-EPC#2
JAZAN
5
SAUDI ARABIA
PLANT .NO
INDEX
DRAWING NO.
J00
VE-678016
JO / EWO: BI - 10 - 01055
SHT. NO.
48
OF
93
REV. NO.
0A
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Where total elimination is not possible, standard and conventional reduction and control
measures shall be applied to cushion their effect
3)
Waste Management
Within the scope of operations, waste management shall involve the collection, segregation,
storage and proper disposal of waste. To this effect, emphasis shall be laid on;
Source reduction
Process re-engineering
Improved housekeeping.
To achieve this, waste skips (buckets) shall be provided to accommodate different categories
of waste.
Used oil shall be collected in drums and sent to used oil dump.
Used batteries shall NOT be mixed with either burnable, metal or organic waste they shall be
stored separately in a designated safe area, labeled and disposed according to
environmental regulations
DWG.TYPE
DOC
JAZAN REFINERY & TERMINAL PROJECT-EPC#2
JAZAN
5
SAUDI ARABIA
PLANT .NO
INDEX
DRAWING NO.
J00
VE-678016
JO / EWO: BI - 10 - 01055
SHT. NO.
49
OF
93
REV. NO.
0A
Sanitation
A. Water
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
1) Drinking water shall be dispensed by means which prevent contamination to job site.
2) Outlets dispensing notable water will be conspicuously posted
"CAUTION-WATER UNFIT FOR DRINKING, WASHING OR COOKING"
Only approved potable water shall be used for the distribution of drinking water.
3)
Containers for drinking water shall be clearly marked as to contents and not used for other
purposes.
B. Toilets
A. Toilet facilities shall be provided at each construction jobsite in ratios shown below.
Number of employees
Minimum facilities
50 or less
50 or more
500 or more
Under temporary field conditions, provisions shall be made to assure not less than one
toilet facility is available.
B. Each toilet shall be equipped with a metal, plastic, or porcelain urinal trough.
Toilets shall be so constructed that the occupants shall be protected against weather
WORK PERMIT SYSTEM
JAZAN
JAZAN
5
DWG.TYPE
PLANT .NO
INDEX
DRAWING NO.
SHT. NO.
REV. NO.
JO / EWO: BI - 10 - 01055
93
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
C. Toilets shall be constructed so that the interior is lighted. Adequate ventilation shall
be provided and all windows vents screened.
C. Washing Facilities
1) Temporary sleeping quarters shall be heated, ventilated, lighted, and maintained in a clean
and safe condition.
E. Medical Facilities
DWG.TYPE
DOC
JAZAN REFINERY & TERMINAL PROJECT-EPC#2
JAZAN
5
SAUDI ARABIA
PLANT .NO
INDEX
DRAWING NO.
J00
VE-678016
JO / EWO: BI - 10 - 01055
SHT. NO.
51
OF
93
REV. NO.
0A
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
2) When, in terms of time and distance, a medical facility or physician is not reasonable
accessible to a group of two or more employees for the treatment of injuries, at least two
employees on each shift shall be qualified to administer first aid.
3) Identification and directional markers shall be provided to readily denote location of all first
aid stations and infirmaries.
4) The containers shall be weatherproof and each type of item there in shall be maintained
sterile, and shall be easily accessible to all workers.
5) The contents of first aid kits shall be checked by the safety officers before being sent out on
each job and at least weekly when work is in process to insure that expended items are
replaced.
12.2.2
A.
Housekeeping
1)
All stairways, passage ways, gangways, and access ways shall be kept free from
materials, supplies, and obstructions at all times.
2)
Loose or light material shall not be stored or left on roofs or floors that are not closed in,
unless it is safely secured.
3)
Tools, materials, extension cords, hoses, or debris shall not cause tripping or other
hazard.
4)
DWG.TYPE
DOC
JAZAN REFINERY & TERMINAL PROJECT-EPC#2
JAZAN
5
SAUDI ARABIA
PLANT .NO
INDEX
DRAWING NO.
J00
VE-678016
JO / EWO: BI - 10 - 01055
SHT. NO.
52
OF
93
REV. NO.
0A
5)
Empty bags having contained lime, cement, and other dust-producing material shall be
removed periodically as specified by the designated authority.
6)
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Protruding nails in scrap boards, planks, and timbers shall be removed, hammered,
in, or bent over flush with the wood unless placed in containers or trucks for removal.
7)
Walkways, runways, and sidewalks shall be kept clear of excavated material or other
obstructions.
8)
Form and scrap lumber and debris shall be cleared form work areas, passageways, and
stairs in and around building storage yards and other structures.
9)
All storage and construction sites shall be kept free form the accumulation of combustible
materials. Woods and grass shall be kept down.
12) Contractors shall provide sufficient personnel and equipment to insure compliance with all
housekeeping requirements.
13) Safety supervisors will inspect the work area daily for adequate housekeeping and record
unsatisfactory findings on the daily inspection report.
Scrap lumber shall be placed in piles or containers. Waste material and rubbish shall be
placed in containers. Waste material and rubbish shall not be thrown down from a height of
more than 6 feet (1.8 m).
2)
Chutes for debris shall be enclosed except for openings equipped with closures at or
about floor level for the insertion of materials. Openings at all stories below the top floor
shall be kept closed when not in use.
DWG.TYPE
DOC
JAZAN REFINERY & TERMINAL PROJECT-EPC#2
JAZAN
5
SAUDI ARABIA
PLANT .NO
INDEX
DRAWING NO.
J00
VE-678016
JO / EWO: BI - 10 - 01055
SHT. NO.
53
OF
93
REV. NO.
0A
3)
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
5)
Used roofing mops shall be stored outside the building and away from combustible
materials.
12.2.3
A. Noise
1)
In all cases where the sound levels exceed specified limits, a continuing, effective hearing
conservation program shall be administered.
2)
When the sound pressure level in a working area exceeds 115dB(A), steady state,
personal ear protection equivalent to the combination of earplugs and earmuffs shall be
required.
3)
4)
Noise hazardous areas (greater than 85dB(A) continuous or 140dB(A) impulse) will be
marked with caution signs indicating both the presence of hazardous noise levels and
the need for hearing protection.
B. Demolition
1)
2)
All electric, gas, water, steam, sewer, and other service lines shall be shut -off, capped, or
otherwise controlled outside the building line before demolition is started.
DWG.TYPE
DOC
JAZAN REFINERY & TERMINAL PROJECT-EPC#2
JAZAN
5
SAUDI ARABIA
PLANT .NO
INDEX
DRAWING NO.
J00
VE-678016
JO / EWO: BI - 10 - 01055
SHT. NO.
54
OF
93
REV. NO.
0A
3)
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Where a hazard exists to employees failing through wall openings, the opening shall be
protected to a height of approximately 1 m
5)
Mechanical equipment shall not be used on floors on working surfaces unless such floors
or surfaces are of sufficient strength to support the imposed load.
6)
When debris is dropped through holes in the floors without chutes, the area onto which the
material is dropped shall be enclosed with barricades not less than lm and not less than
back from the projected edge of the opening above.
7)
Chutes shall be designed and constructed of such strength as to eliminate failure due to
impact of materials of debris loaded therein.
8)
The storage of waste and debris on any floor shall not exceed the allowable floor loads.
9)
Masonry walls, or sections of masonry, shall not be permitted to fall upon the floors of the
building in such masses as to exceed the safe carrying capacities of the floors.
Note 1)
Followings are HALs standard regulations which are applicable to the EPC
Contract.
DWG.TYPE
DOC
JAZAN REFINERY & TERMINAL PROJECT-EPC#2
JAZAN
5
SAUDI ARABIA
PLANT .NO
INDEX
DRAWING NO.
J00
VE-678016
JO / EWO: BI - 10 - 01055
SHT. NO.
55
OF
93
REV. NO.
0A
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
These traffic regulations are applicable to all construction employees during the construction
work.
1. VEHICLE SAFETY
1.1
Licensed Operators:
HAL/Subcontractors shall require all drivers to be tested and approved before driving any
vehicle in the construction area.
1.2
Motor vehicles including construction of brakes, clutches, horns, lights, etc., by the operators.
No unsafe vehicles shall be operated.
1.3
Prohibited Vehicles:
Vehicles which are not properly maintained or which do not have a proper vehicle entry pass
shall not be allowed to enter the WORK SITE or temporary facility areas.
1.4
Refuelling:
Operating Rules
5) At all blind comers, all vehicles shall stop and ensure the safety of other traffic and
pedestrians before proceeding.
6) All vehicles shall proceed along the specified side of the road.
7) In addition to the operator and/or driver, the number of passengers allowed to sit in
the front seat shall be restricted to the intend seating capacity.
WORK PERMIT SYSTEM
DWG.TYPE
DOC
JAZAN REFINERY & TERMINAL PROJECT-EPC#2
JAZAN
5
SAUDI ARABIA
PLANT .NO
INDEX
DRAWING NO.
J00
VE-678016
JO / EWO: BI - 10 - 01055
SHT. NO.
56
OF
93
REV. NO.
0A
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
9) No person shall be permitted to get on or off a vehicle while it is in motion. Vehicles shall be
brought to a complete stop before loading or unloading personnel.
10) All heavy vehicles on site shall be fitted with reversing sirens and spotters should be in
attendance.
11) Licensing Procedure for operating, crane shall follow to local / or Aramcos regulation
1.6
No Parking Areas:
1.7
Parking :
1) All vehicles shall be properly parked in the parking lots designated by HAL.
2) Keys shall be removed from vehicles when parked.
1.8
Others:
1) Large crawler or mobile cranes, when operating off main roads, shall be escorted
and all precautions shall be taken to prevent damage to the owner, HAL, private,
public or government property.
2) Road blocks, detour signs, etc., shall not be altered without written authorization from
HAL.
DWG.TYPE
DOC
JAZAN REFINERY & TERMINAL PROJECT-EPC#2
JAZAN
5
SAUDI ARABIA
PLANT .NO
INDEX
DRAWING NO.
J00
VE-678016
JO / EWO: BI - 10 - 01055
SHT. NO.
57
OF
93
REV. NO.
0A
2.1
Pedestrians:
Do not cross a road without first looking to the left and right.
2.2
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
1) Bicycles and motorcycles shall be parked in the parking lots designated by HAL.
2) Only a licensed operator is authorized to ride a motorcycle. In addition, riders shall
wear safety helmet and chin-strap securely fastened at all times while riding a
motorcycle.
3.
ACCIDENT REPORTING
All vehicles accidents shall be reported to the HAL s Safety officer for investigation. The scene
of an accident shall be left untouched unless the injured person needs immediate medical
treatment or there is a possibility of further damage to the equipment or facilities.
Contact with the local police shall be made by HAL / the owner.
4.
To help maintain a level of traffic safety, HALs Construction Manager will issue a warning letter
to personnel who have violated the traffic regulations contained herein.
Personnel who have repeatedly violated these traffic regulations shall be prohibited from
entering HALs premises, pursuant to the decision of HALs Manager.
DWG.TYPE
DOC
JAZAN REFINERY & TERMINAL PROJECT-EPC#2
JAZAN
5
SAUDI ARABIA
PLANT .NO
INDEX
DRAWING NO.
J00
VE-678016
JO / EWO: BI - 10 - 01055
SHT. NO.
58
OF
93
REV. NO.
0A
ANNEX 2.
1.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
INSTRUCTION TO PERSONNEL
2) Do not drink any alcohol during staying in Saudi Arabia. No alcoholic drinks, narcotics or
similar Substances are to be taken to the WORK SITE or remain oil the WORK SITE.
Any personnel under the influence of alcoholic, narcotics or similar substances will not
be permitted to enter or remain on the job site.
4) Regardless of severity, report to the Supervisors immediately when any injuries are
sustained, materials or equipment damaged.
5) Wear safe working clothes which have been properly repaired and washed. Safety shoes
shall be available and worn at all times while on site.
6) Always wear a safety belt when working at any level where there is a danger of falling
unless fully protected by scaffolds, handrails and toe boards.
7) Use other safety protective equipment such as gloves, aprons, boots, goggles,
respirators, etc., when required.
8) Do not remove any safety devices from machines or attempt to operate machines
without such as devices.
9) Do not operate any machines, cranes, trucks, or other equipment without a proper
license and authorization.
10) Do not operate any vehicles at speeds exceeding the designated limit.
11) Always use ladders, stairways or other access ways when going up or down scaffolds,
towers and pipe racks, etc.
12) Do not throw or drop any tools or materials from height.
DWG.TYPE
DOC
JAZAN REFINERY & TERMINAL PROJECT-EPC#2
JAZAN
5
SAUDI ARABIA
PLANT .NO
INDEX
DRAWING NO.
J00
VE-678016
JO / EWO: BI - 10 - 01055
SHT. NO.
59
OF
93
REV. NO.
0A
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Do not stand or sit under any loads being hoisted by crane, forklift, etc.
14)
15)
16)
17)
Reports to the Supervisors for remedial action if any unsafe acts of other work groups or
unsafe conditions are observed.
18)
Observe safety directives pointed out and/or made by Supervisors, Safety committee
members, and HAL / owner.
19)
Keep working places, water closets, and waiting rooms clean and neat.
20)
21)
Do not attempt to enter any tanks, vessel, manhole, pit or other restricted areas without
permission from Supervisors and qualified safety professionals.
22)
Do not touch or move cocks, valves, gauges or step on small pipe or measuring
equipment.
23)
24)
Observe other safety, traffic, fire and sanitation rules pertaining to the job.
2.
Pay special attention to all the following safety regulations related to your duties:
1)
Every day at least once, you will move about every bit of the site to make sure that the
safety regulations are strictly followed if not you will inform the responsible persons and
the Construction Manager.
2)
Supply workers with the necessary protection tools and warn the ones that do not follow
the following instructions,
3)
Warn workers who do not follow safety and health regulations and who are not serious in
their job.
DWG.TYPE
DOC
JAZAN REFINERY & TERMINAL PROJECT-EPC#2
JAZAN
5
SAUDI ARABIA
PLANT .NO
INDEX
DRAWING NO.
J00
VE-678016
JO / EWO: BI - 10 - 01055
SHT. NO.
60
OF
93
REV. NO.
0A
4)
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Check the warning sign boards and attach them in the suitable places.
6)
The accident reports should be noted down according to the work law, and the
Construction Manager should be immediately informed with the serious accidents.
7)
Control traffic on Job site and make sure that all vehicle drivers have valid driving license.
8)
All vehicles and machinery should be operated by qualified personnel who have
certificate from Construction Manager.
9)
Warn and fire workers who do not follow the safety regulations
10) The ill or the workers on vocation will not be allowed to work.
11)
12)
14) Control periodically the workers rooms, flammable and burning substance using will be
strictly forbidden.
3.
1)
2)
The workers will not be allowed to work without protection tools, (i.e. helmets,
footwear,
eye shields. etc.) Provide them and make sure that the workers are using them.
3)
All the openings or holes on the floors, stairways, etc. will be properly covered or
barriers will be installed.
4)
5)
Experienced workers should construct the reinforced concrete forms and related
official
regulations should be taken into consideration.
6)
While constructing the stairs, the related regulations should be taken into
consideration.
7)
WORK PERMIT SYSTEM
The safety tools given to the workers should be checked and always be in good
condition.
DWG.TYPE
DOC
JAZAN REFINERY & TERMINAL PROJECT-EPC#2
JAZAN
5
SAUDI ARABIA
PLANT .NO
INDEX
DRAWING NO.
J00
VE-678016
JO / EWO: BI - 10 - 01055
SHT. NO.
61
OF
93
REV. NO.
0A
8)
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
necessary
In deep and dangerous locations the workers will work in couples and they should have
safety belts.
10) Transportation of personnel at the rear of open pick-up vehicles shall be strictly
forbidden.
11) The foreman and sub-contractors will not be allowed to work without protection tools,
and if happened, a written warning notice will be given to them.
4. INSTRUCTION TO SITE SAFETY CREW
1)
Do not let workers who are underage and who do not have health report.
2)
Read and strictly follow the requirements of Labour Law, Safety Regulations and the
Workers Health Rules.
3)
Control the safety precautions at job site to make sure that they conform to the safety
regulations.
4)
You will take all the precautions essential due to specialty of the job performed.
5)
6)
Do not allow any worker to enter job site or work without wearing safety helmet.
7)
Do not allow workers to work without wearing safety belt in high places.
8)
9)
The safety regulations should be discusses and agreed with engineers, foremen,
technicians, superintendents, chiefs and subcontractors.
10) Ask the safety engineer for information and instruction for the problems you could not
solve by yourselves.
11) Inform Construction Manager and head office, if any accident happens on site.
12) The Construction Manager should be given weekly report regarding the conditions of the
helmets, safety belts, handrails, warning sign boards and similar things.
13) The workers who work without protection tools and do not care of safety regulations
WORK PERMIT SYSTEM
DWG.TYPE
DOC
JAZAN REFINERY & TERMINAL PROJECT-EPC#2
JAZAN
5
SAUDI ARABIA
PLANT .NO
INDEX
DRAWING NO.
J00
VE-678016
JO / EWO: BI - 10 - 01055
SHT. NO.
62
OF
93
REV. NO.
0A
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
14) Control workers dormitories at every week and dirty and flammable substances will be
taken out of the rooms. Windows, roof and lighting lamps should be checked.
proper stoves should be used; the firewood should be supplied.
15) The vehicles should be appropriate for traffic.
16) Transportation of personnel at rear of open or loaded pick-up or at work machinery shall
be strictly forbidden.
17) Ensure that all the subcontractors are following the safety rules and regulations, also
inform the Construction Manager about subcontractors conditions where essential.
5.
INSTRUCTION TO STOREKEEPER
DWG.TYPE
DOC
JAZAN REFINERY & TERMINAL PROJECT-EPC#2
JAZAN
5
SAUDI ARABIA
PLANT .NO
INDEX
DRAWING NO.
J00
VE-678016
JO / EWO: BI - 10 - 01055
SHT. NO.
63
OF
93
REV. NO.
0A
1)
Take the necessary precautions to prevent the failing of materials while unloading in the
storehouse.
2)
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
The mechanical equipment should be used for moving, lifting and unloading the heavy
parts.
3)
4)
5)
The flammable, explosive and similar materials should be separate from the other
materials in the warehouse.
6)
At least two portable fire extinguishers should be available at easily accessible places in
the storehouses. One of them should be at the entrance and the other one should be
at a place for away from it.
7)
8)
6.
INSTRUCTION TO DRIVER
1)
2)
You should make sure that the car horn, lighting system, tires pressure, wipers, mirrors
3)
4)
5)
Before moving make sure that the brakes and clutch are working well.
6)
You should follow all the requirements of the traffic law while traveling.
7)
Respect the regulations on job site and take care of the workers there.
8)
When leaving your car, make sure that you have taken the keys and locked the doors.
9)
Leave the keys of the vehicle in the places as indicated on the Job site instructions.
10) In any case, do not give the car keys to the personnel who has not the driving license.
11) After finishing the duties givenDWG.TYPE
to you make
sure
that the
vehicle is inSHT.
good
condition
and if
PLANT .NO
INDEX
DRAWING NO.
NO.
REV. NO.
JAZAN
JAZAN
5
JO / EWO: BI - 10 - 01055
93
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
7.
1)
2)
3)
8.
1)
All the requirements of Layout Law, Safety Regulations and the Workers Healthy Rules
will be strictly followed.
2)
All the work safety regulations and instruction forwarded by the safety engineer and
Construction Manager will be strictly followed.
3)
You will take all the precautions essential due to specialty of the job performed.
4)
The list of necessary safety equipment will be determined and they will be delivered to the
Construction Manager, and will be make sure that all the safety equipment will be
used by the workers.
9.
Your authorities and responsibilities regarding job site safety will be as follows.
DWG.TYPE
DOC
JAZAN REFINERY & TERMINAL PROJECT-EPC#2
JAZAN
5
SAUDI ARABIA
PLANT .NO
INDEX
DRAWING NO.
J00
VE-678016
JO / EWO: BI - 10 - 01055
SHT. NO.
65
OF
93
REV. NO.
0A
1)
All the safety regulations and the related instructions forwarded by Project Management
will be strictly followed.
2)
All the essential letters and form will be submitted and permission will be received from
the related authorities at job commencement.
3)
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
The work safety regulations and related rules will be provided and will be distributed to the
assigned personnel.
4)
5)
In order to ensure the Job site safety, assign personnel on site at all levels.
6)
Provide, distribute, and inspect all kinds of materials and equipment for safety.
7)
Announce and distribute by having their signatures, the essential regulations and
instructions to the safety personnel, subcontractors and workers.
8)
9)
Provide Job site doctor and supply medicines and aid materials asked by him.
10) Ensure that all the subcontractors are following the safety rules and regulations, inspect
and warn them and even suspend their works where essential.
This kind of safety checking using the attached Safety Check/Evaluation List as a minimum
WORK PERMIT SYSTEM
DWG.TYPE
DOC
SAUDI ARABIA
PLANT .NO
INDEX
DRAWING NO.
J00
VE-678016
JO / EWO: BI - 10 - 01055
SHT. NO.
66
OF
93
REV. NO.
0A
Plant Pre-commissioning Work Stage (Minimum two times check per month)
and Plant Pre-Startup Safety Review Stage (Before Startup)
and Plant Startup & Operation Stage (After Startup)
1.2
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
The Commissioning Manager or Safety Review Group Chairman will assign capable
Supervisors and Safety Engineer for required items checking up and initial evaluation (grading)
of each items for approval.
2. Rule of Check-up, Evaluation and Follow-up
2.1
Each safety check-up/evaluation should be made with fair and objective minds based on
facts or data. Checkers can act as internal safety auditors.
2.2
2.3
Follow-ups
For the unsatisfactory items marked as D, C, B, all responsible persons should take necessary
action in-time to correct / improve those items and to upgrade the levels.
DWG.TYPE
DOC
JAZAN REFINERY & TERMINAL PROJECT-EPC#2
JAZAN
5
SAUDI ARABIA
PLANT .NO
INDEX
DRAWING NO.
J00
VE-678016
JO / EWO: BI - 10 - 01055
SHT. NO.
67
OF
93
REV. NO.
0A
1. WORKING PLATFORM
2. STEEL PIPE SCAFFOLDS
WORK PERMIT SYSTEM
3. MOVABLE SCAFFOLDS
DWG.TYPE
DOC
SAUDI ARABIA
PLANT .NO
INDEX
DRAWING NO.
J00
VE-678016
JO / EWO: BI - 10 - 01055
SHT. NO.
68
OF
93
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
REV. NO.
0A
4. SUSPENDED SCAFFOLDS
5. SAFETY NET FOR FALLING PREVENTION
6. INCLINED SAFETY NET
7. SAFETY GUARDRAIL FOR ELEVATOR HALL
8. SAFETY FACILITIES FOR HOIST CAR
9. WALK WAY PLATFORM
10. LADDER
11. TEMPORARY ELECTRIC PANEL
12. WELDING MACHINE
13. FOR STEEL STRUCTURE WORK
14. FOR OTHER WORKS
15. FOR REBAR FABRICATION WORK
16. FOR FORM INSTALLATION WORK
17. LADDER FOR MOVABLE SCAFFOLDS.
18. FOR USING GONDOLA
1. WORKING PLATFORM
DWG.TYPE
DOC
JAZAN REFINERY & TERMINAL PROJECT-EPC#2
JAZAN
5
SAUDI ARABIA
PLANT .NO
INDEX
DRAWING NO.
J00
VE-678016
JO / EWO: BI - 10 - 01055
SHT. NO.
69
OF
93
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
REV. NO.
0A
JAZAN
DWG.TYPE
DOC
SAUDI ARABIA
PLANT .NO
INDEX
DRAWING NO.
J00
VE-678016
JO / EWO: BI - 10 - 01055
SHT. NO.
70
OF
93
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
REV. NO.
0A
Toe-Board
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
DWG.TYPE
DOC
JAZAN REFINERY & TERMINAL PROJECT-EPC#2
JAZAN
5
SAUDI ARABIA
PLANT .NO
INDEX
DRAWING NO.
J00
VE-678016
JO / EWO: BI - 10 - 01055
SHT. NO.
71
OF
93
REV. NO.
0A
3. MOVABLE SCAFFOLDS
DWG.TYPE
DOC
JAZAN REFINERY & TERMINAL PROJECT-EPC#2
JAZAN
5
SAUDI ARABIA
PLANT .NO
INDEX
DRAWING NO.
J00
VE-678016
JO / EWO: BI - 10 - 01055
SHT. NO.
72
OF
93
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
REV. NO.
0A
4. SUSPENDED SCAFFOLDS
DWG.TYPE
DOC
JAZAN REFINERY & TERMINAL PROJECT-EPC#2
JAZAN
5
SAUDI ARABIA
PLANT .NO
INDEX
DRAWING NO.
J00
VE-678016
JO / EWO: BI - 10 - 01055
SHT. NO.
73
OF
93
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
REV. NO.
0A
DWG.TYPE
DOC
JAZAN REFINERY & TERMINAL PROJECT-EPC#2
JAZAN
5
SAUDI ARABIA
PLANT .NO
INDEX
DRAWING NO.
J00
VE-678016
JO / EWO: BI - 10 - 01055
SHT. NO.
74
OF
93
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
REV. NO.
0A
DWG.TYPE
DOC
JAZAN REFINERY & TERMINAL PROJECT-EPC#2
JAZAN
5
SAUDI ARABIA
PLANT .NO
INDEX
DRAWING NO.
J00
VE-678016
JO / EWO: BI - 10 - 01055
SHT. NO.
75
OF
93
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
REV. NO.
0A
7.
DWG.TYPE
DOC
JAZAN REFINERY & TERMINAL PROJECT-EPC#2
JAZAN
5
SAUDI ARABIA
PLANT .NO
INDEX
DRAWING NO.
J00
VE-678016
JO / EWO: BI - 10 - 01055
SHT. NO.
76
OF
93
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
REV. NO.
0A
8.
DWG.TYPE
DOC
JAZAN REFINERY & TERMINAL PROJECT-EPC#2
JAZAN
5
SAUDI ARABIA
PLANT .NO
INDEX
DRAWING NO.
J00
VE-678016
JO / EWO: BI - 10 - 01055
SHT. NO.
77
OF
93
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
REV. NO.
0A
9.
WALKWAY - PLATFORM
DWG.TYPE
DOC
JAZAN REFINERY & TERMINAL PROJECT-EPC#2
JAZAN
5
SAUDI ARABIA
PLANT .NO
INDEX
DRAWING NO.
J00
VE-678016
JO / EWO: BI - 10 - 01055
SHT. NO.
78
OF
93
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
REV. NO.
0A
10.
LADDER
DWG.TYPE
DOC
JAZAN REFINERY & TERMINAL PROJECT-EPC#2
JAZAN
5
SAUDI ARABIA
PLANT .NO
INDEX
DRAWING NO.
J00
VE-678016
JO / EWO: BI - 10 - 01055
SHT. NO.
79
OF
93
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
REV. NO.
0A
10.
LADDER
DWG.TYPE
DOC
JAZAN REFINERY & TERMINAL PROJECT-EPC#2
JAZAN
5
SAUDI ARABIA
PLANT .NO
INDEX
DRAWING NO.
J00
VE-678016
JO / EWO: BI - 10 - 01055
SHT. NO.
80
OF
93
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
REV. NO.
0A
11.
DWG.TYPE
DOC
JAZAN REFINERY & TERMINAL PROJECT-EPC#2
JAZAN
5
SAUDI ARABIA
PLANT .NO
INDEX
DRAWING NO.
J00
VE-678016
JO / EWO: BI - 10 - 01055
SHT. NO.
81
OF
93
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
REV. NO.
0A
12.
WELDING MACHINE
DWG.TYPE
DOC
JAZAN REFINERY & TERMINAL PROJECT-EPC#2
JAZAN
5
SAUDI ARABIA
PLANT .NO
INDEX
DRAWING NO.
J00
VE-678016
JO / EWO: BI - 10 - 01055
SHT. NO.
82
OF
93
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
REV. NO.
0A
13.
DWG.TYPE
DOC
JAZAN REFINERY & TERMINAL PROJECT-EPC#2
JAZAN
5
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SAUDI ARABIA
PLANT .NO
INDEX
DRAWING NO.
J00
VE-678016
JO / EWO: BI - 10 - 01055
SHT. NO.
83
OF
93
REV. NO.
0A
14.
DWG.TYPE
DOC
JAZAN REFINERY & TERMINAL PROJECT-EPC#2
JAZAN
5
SAUDI ARABIA
PLANT .NO
INDEX
DRAWING NO.
J00
VE-678016
JO / EWO: BI - 10 - 01055
SHT. NO.
84
OF
93
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
REV. NO.
0A
15.
DWG.TYPE
DOC
JAZAN REFINERY & TERMINAL PROJECT-EPC#2
JAZAN
5
SAUDI ARABIA
PLANT .NO
INDEX
DRAWING NO.
J00
VE-678016
JO / EWO: BI - 10 - 01055
SHT. NO.
85
OF
93
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
REV. NO.
0A
16.
DWG.TYPE
DOC
JAZAN REFINERY & TERMINAL PROJECT-EPC#2
JAZAN
5
SAUDI ARABIA
PLANT .NO
INDEX
DRAWING NO.
J00
VE-678016
JO / EWO: BI - 10 - 01055
SHT. NO.
86
OF
93
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
REV. NO.
0A
17.
DWG.TYPE
DOC
JAZAN REFINERY & TERMINAL PROJECT-EPC#2
JAZAN
5
SAUDI ARABIA
PLANT .NO
INDEX
DRAWING NO.
J00
VE-678016
JO / EWO: BI - 10 - 01055
SHT. NO.
87
OF
93
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
REV. NO.
0A
18.
DWG.TYPE
DOC
JAZAN REFINERY & TERMINAL PROJECT-EPC#2
JAZAN
5
SAUDI ARABIA
PLANT .NO
INDEX
DRAWING NO.
J00
VE-678016
JO / EWO: BI - 10 - 01055
SHT. NO.
88
OF
93
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
REV. NO.
0A
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
INCIDENT/ACCIDENT REPORT
=======================================================
====
DIVISION:
DEP'T.:
DATE
A. TYPE
LOCAT
ION
DEPT
DEPT
UNIT
NAME
GRAD
E
TEAM(TEL:
C. ID
W.TYPE
AGE
O. DATE
DESCRI
PTION
ACCIDENT REPORT(DETAILED);
REASON :
COUNTERMEASURE :
SAFETY ENGINEER :
WORK PERMIT SYSTEM
CONSTRUCTION MANAGER :
DWG.TYPE
DOC
JAZAN REFINERY & TERMINAL PROJECT-EPC#2
JAZAN
5
SAUDI ARABIA
PLANT .NO
INDEX
DRAWING NO.
J00
VE-678016
JO / EWO: BI - 10 - 01055
SHT. NO.
89
OF
93
REV. NO.
0A
Carpenters
Pipe
Fitters
Electricians
Instrument
Technicians
Millwrights
Plant
Operators
Gougers
Mechanics
Plumbers
Welders
Fabricators
Crane Operators
Scaffolders
M
M
M
M
M
M
M
M
M
M
M
M
A
A
A
A
A
A
A
A
A
A
A
A
A
A
R
R
R
R
R
R
A
A
A
A
A
A
A
A
A
A
A
A
A
A
R
R
R
R
R
R
Riggers
Painters
Helpers
Marine
Personnel
Diving Support
A
A
A
A
M
M
M
M
M
M
M
A
A
M
A
A
A
A
A
PLANT .NO
INDEX
DRAWING NO.
SHT. NO.
NO.
DWG.TYPE
R = Recommended
A = Assess
dependent
on REV.
risk
DOC
J00
VE-678016
JO / EWO: BI - 10 - 01055
90
OF
93
Welding Masks
Protective Clothing
A
A
A
A
A
A
A
A
Fall Arresters
Life Jacket
Safety Harness
Air-Fred Masks
Ear Protection
Respirators
Air-Fred Helmet
Overalls
Moleskin Sleeves
Key : M = Mandatory
General Worker
/ Staff
JAZAN
Gloves
Visors
Hoods
Goggles
Safety Glasses
Safety Boots
JOB
CLASSIFICATION
Safety Helmet
Immersion Suit
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
0A
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Abrasive Blasters
A-Frames
Barges
Boom Trucks
Bracers
(Articulating/Telescoping)
Crane Operator
Crane Operators
Drivers
Film Interpreters
Forklift Operator
Man lifts
Medical(Doctors/Nurses)
(Hydraulic/Telescopic/Scissor)
-
NDT Specialists
Scaffolds
Riggers
Scaffold Supervisors/Inspectors
Spider Baskets
Spray Painters
Welding Inspectors
Welders
X-ray Technicians
DWG.TYPE
DOC
JAZAN REFINERY & TERMINAL PROJECT-EPC#2
JAZAN
5
Attachments/Extensions
SAUDI ARABIA
PLANT .NO
INDEX
DRAWING NO.
J00
VE-678016
JO / EWO: BI - 10 - 01055
SHT. NO.
91
OF
93
REV. NO.
0A
Name
Contact Number
Project Manager
Na Jae-Soon
0580653732
Safety Manager
Maxzaldy Laredo
0569484513
Safety Superintendent
0592408057
Construction Manager
Agency
Telephone Number
Roads security
996
939
933
Traffic Police
993
994
997
Police
999
Civil Defence
998
Public Security
989
Natural Disaster
966
Meteorology
966
DWG.TYPE
DOC
JAZAN REFINERY & TERMINAL PROJECT-EPC#2
JAZAN
5
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SAUDI ARABIA
PLANT .NO
INDEX
DRAWING NO.
J00
VE-678016
JO / EWO: BI - 10 - 01055
SHT. NO.
92
OF
93
REV. NO.
0A
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
will be maintained and provided for client immediately when organization is set or changed.
DWG.TYPE
DOC
JAZAN REFINERY & TERMINAL PROJECT-EPC#2
JAZAN
5
SAUDI ARABIA
PLANT .NO
INDEX
DRAWING NO.
J00
VE-678016
JO / EWO: BI - 10 - 01055
SHT. NO.
93
OF
93
REV. NO.
0A