Api 653
Api 653
In the case of apparent conflicts between the requirements of this standard and API 650
or its predecessor API 12C, this standard shall govern for tanks that have been placed in service.
critical zone
The portion of the tank bottom or annular plate within 3 in. of the inside edge of the shell, measured
radially inward.
major alteration/or major repair
a) installing a shell penetration larger than NPS 12 beneath the design liquid level;
b) h) jacking a tank shell.
basis. This inspection may be done by owner/operator personnel, and can be done by other than
authorized
The interval of such inspections shall be consistent with conditions at the particular site, but shall not
exceed one month
(where RCA is the
difference between the measured shell thickness and the minimum required thickness in mils,
And
N is the minimum required number of settlement measurement points, but no less than eight
13.2 Recordkeeping
e) radiographs (radiographs shall be retained for at least one year);