Backflush Logic Basics
Backflush Logic Basics
Lets start with the example! Here is my material BOM, which consists of a semi-finished material
(MITYU_TEST2) and raw materials (one discountinuated and two alternatives):
SAP ERP Manufacturing - Production Planning (SAP PP): The backflush logic - basics
SAP ERP Manufacturing - Production Planning (SAP PP): The backflush logic - basics
Important: if you change the material master after creating the order, the existing order wont
get updated, you have to reread the master data (CO02 -> Functions -> Read PP master data
SAP ERP Manufacturing - Production Planning (SAP PP): The backflush logic - basics
4. customizing of confirmation (OPK4 -> Generally Valid Settings -> Goods movements)
- if you set the indicator, the system displays all the components regardless of whether or not the backflushing
indicator is set for the component in the order
- (in case of problems see note 1872575)
SAP ERP Manufacturing - Production Planning (SAP PP): The backflush logic - basics
Prerequisits of backflushing:
1. Setting the Movement Allowed flag (CO02-component overview-details -> General data tab ->
General Indicators -> Movement Allowd)
1.
SAP ERP Manufacturing - Production Planning (SAP PP): The backflush logic - basics
2. Either Automatic Goods Receipt is set in OPKP or the operation has a control key, with
Automatic Goods Movement
- if you do not set this indicator then the of the operation decides how the automatic goods receipt is
carried out
SAP ERP Manufacturing - Production Planning (SAP PP): The backflush logic - basics
SAP ERP Manufacturing - Production Planning (SAP PP): The backflush logic - basics
Confirmation in CO11
SAP ERP Manufacturing - Production Planning (SAP PP): The backflush logic - basics
Scenario 1:
set the Goods movements flag in OPK4 (all other settings are fixed)
Scenario 2:
set a control key with automatic goods receipt indicator
SAP ERP Manufacturing - Production Planning (SAP PP): The backflush logic - basics
Scenario 3:
set the Goods movements flag in OPK4
set a control key with automatic goods receipt indicator
Scenario 4:
set a control key with automatic goods receipt indicator
backflush (CO02 -> component overview -> backflush flag) for the alternative items and the
discontinuated
SAP ERP Manufacturing - Production Planning (SAP PP): The backflush logic - basics
Christopher Cervantes
8 May, 2015 10:50 PM
Hey Dora, nice work. Thanks for your effort
Just one clarification, in the case of the checks for "Automatic GR" it affects only the automatic posting of the
assembly or finished product (FERT / HALB). It should be better to divide this into 2 similar functions:
Backflush --> Automatic GI for componentes. [Mov. 261]
SAP ERP Manufacturing - Production Planning (SAP PP): The backflush logic - basics
Automatic GR for assembly or finished product. [Mov. 101]-
SAP ERP Manufacturing - Production Planning (SAP PP): The backflush logic - basics
ray
Srini Ravindra Kumar
4 Mar, 2014 7:42 PM
Good follow-up and extension to the earlier document posted on the same topic.
Can you please confirm what happens if inspite of setting the All components indicator ON, if the user
stays on the initial screen of co11n itself and clicks on save without actually going to the subsequent goods
movement overview screen?
Is this setting again good for foreground/online execution only or can that be used to confirm all components
with a mass processing option also?
Aditya S
4 Mar, 2014 4:53 PM
Thanks a lot Dora Simon for sharing ur knowledge to all of us. Thx again.