Misjoint Variation: Poor Quality Process Capability

The document discusses a fishbone diagram created to determine the root cause of delays in the project duration of a wireless inventory management system in restaurants. The fishbone diagram identifies potential causes such as issues with the equipment, network, process, and project management of the system. Specific problems mentioned include poor quality sensors, routers, and decoders; interrupted connectivity; variation in the process and among workers; and a lack of proper scheduling and maintenance.

Uploaded by

Amar Nath
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
18 views1 page

Misjoint Variation: Poor Quality Process Capability

The document discusses a fishbone diagram created to determine the root cause of delays in the project duration of a wireless inventory management system in restaurants. The fishbone diagram identifies potential causes such as issues with the equipment, network, process, and project management of the system. Specific problems mentioned include poor quality sensors, routers, and decoders; interrupted connectivity; variation in the process and among workers; and a lack of proper scheduling and maintenance.

Uploaded by

Amar Nath
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 1

Project Quality Management -WORK SHEET

Project Title: Wireless Inventory management in Restaurants


Name: AMARNATH S
Roll No. 15MBA095
Delay in Project Duration. Construct a Fish-bone diagram to determine the root cause.

Equipment

Poor quality

Misjoint

Network

Poor
interrupted
cause
connectivity

Process

Process
capability

Variation

Routers
Design

Worn out
Dust
Project
management
Sensors

Connection
problem
Software
Decoders
Receivables
problems
Receiving end

Poor inventory
measurement

No proper
schedule

Cleaning procedure

Design
Variation among
workers
Maintenance