This document contains a lead chart that lists the total cost per trip for transporting various materials over increasing distances from 0.5 to 200 km. The chart includes 13 materials and their unit costs which increase with distance. It shows that transporting 1 cubic meter of lime costs Rs. 62.39 for a 0.5 km trip and Rs. 1826.22 for a 175 km trip. In general, transport costs increase substantially with distance for all materials listed in the chart.

Uploaded by

Manish Kapadne
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
2K views1 page

09 Construction Material Lead Chart

This document contains a lead chart that lists the total cost per trip for transporting various materials over increasing distances from 0.5 to 200 km. The chart includes 13 materials and their unit costs which increase with distance. It shows that transporting 1 cubic meter of lime costs Rs. 62.39 for a 0.5 km trip and Rs. 1826.22 for a 175 km trip. In general, transport costs increase substantially with distance for all materials listed in the chart.

Uploaded by

Manish Kapadne
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Lead Chart

Lead in
Km.

Total Cost
per trip

1
0.50
1.00
1.50
2.00
2.50
3.00
3.50
4.00
4.50
5.00
6.00
7.00
8.00
9.00
10.00
15.00
20.00
25.00
30.00
35.00
40.00
45.00
50.00
60.00
70.00
80.00
90.00
100.00
125.00
150.00
175.00
200.00

Task per
trip
Unit Per
2
374.36
412.37
449.51
485.48
522.37
557.80
593.34
628.54
663.14
697.74
767.11
835.62
904.23
970.21
1033.88
1282.63
1598.75
1914.50
2236.11
2395.09
2691.24
2983.84
3271.34
3866.97
4461.64
5057.71
5646.97
6242.70
7019.06
8342.23
9670.09
10957.30

Lime
Sand,
Aggregate Rubble Excavated
murum aggregate 40 mm and
stone
rock
earth,
below 40
above
rubbish mm size,
manure brickbat,
concrete
timber
blocks
6.00 Cum 5.00 Cum 4.25 Cum 4.25 Cum 3.00 Cum

Tar
Steel,
bitumen
Cement
roofing
R.C.C.
and
block, A.C.
flooring, pipe, G.I.
asphalt
Sheet
4.60 MT.

Per Cum
3
62.39
68.73
74.92
80.91
87.06
92.97
98.89
104.76
110.52
116.29
127.85
139.27
150.70
161.70
172.31
213.77
266.46
319.08
372.68
399.18
448.54
497.31
545.22
644.49
743.61
842.95
941.16
1040.45
1169.84
1390.37
1611.68
1826.22

Per MT.
8
81.38
89.64
97.72
105.54
113.56
121.26
128.99
136.64
144.16
151.68
166.76
181.66
196.57
210.91
224.76
278.83
347.55
416.19
486.11
520.67
585.05
648.66
711.16
840.65
969.92
1099.50
1227.60
1357.11
1525.88
1813.53
2102.19
2382.02

Per Cum
4
74.87
82.47
89.90
97.10
104.47
111.56
118.67
125.71
132.63
139.55
153.42
167.12
180.85
194.04
206.78
256.53
319.75
382.90
447.22
479.02
538.25
596.77
654.27
773.39
892.33
1011.54
1129.39
1248.54
1403.81
1668.45
1934.02
2191.46

Per Cum
5
88.08
97.03
105.77
114.23
122.91
131.25
139.61
147.89
156.03
164.17
180.50
196.62
212.76
228.28
243.27
301.80
376.18
450.47
526.14
563.55
633.23
702.08
769.73
909.87
1049.80
1190.05
1328.70
1468.87
1651.54
1962.88
2275.32
2578.19

Per Cum
6
88.08
97.03
105.77
114.23
122.91
131.25
139.61
147.89
156.03
164.17
180.50
196.62
212.76
228.28
243.27
301.80
376.18
450.47
526.14
563.55
633.23
702.08
769.73
909.87
1049.80
1190.05
1328.70
1468.87
1651.54
1962.88
2275.32
2578.19

Per Cum
7
124.79
137.46
149.84
161.83
174.12
185.93
197.78
209.51
221.05
232.58
255.70
278.54
301.41
323.40
344.63
427.54
532.92
638.17
745.37
798.36
897.08
994.61
1090.45
1288.99
1487.21
1685.90
1882.32
2080.90
2339.69
2780.74
3223.36
3652.43

Bricks
empty
cement
bags

Tiles not
round roof
tiles

Steam
Coal

Matting
bamboos,
ballies,
cielling
rubber,
P.V.C. pipe

7.00 MT.

200 Nos.

3200 Nos.

5.50 MT.

3.00 MT.

Per MT.
9
53.48
58.91
64.22
69.35
74.62
79.69
84.76
89.79
94.73
99.68
109.59
119.37
129.18
138.60
147.70
183.23
228.39
273.50
319.44
342.16
384.46
426.26
467.33
552.42
637.38
722.53
806.71
891.81
1002.72
1191.75
1381.44
1565.33

1000 Nos. 1000 Nos.


10
11
187.18
116.99
206.18
128.86
224.75
140.47
242.74
151.71
261.18
163.24
278.90
174.31
296.67
185.42
314.27
196.42
331.57
207.23
348.87
218.04
383.55
239.72
417.81
261.13
452.11
282.57
485.10
303.19
516.94
323.09
641.32
400.82
799.37
499.61
957.25
598.28
1118.05
698.78
1197.54
748.46
1345.62
841.01
1491.92
932.45
1635.67
1022.29
1933.48
1208.43
2230.82
1394.26
2528.85
1580.53
2823.48
1764.68
3121.35
1950.84
3509.53
2193.46
4171.11
2606.95
4835.05
3021.90
5478.65
3424.16

Per MT.
12
68.07
74.98
81.73
88.27
94.98
101.42
107.88
114.28
120.57
126.86
139.47
151.93
164.40
176.40
187.98
233.21
290.68
348.09
406.56
435.47
489.32
542.52
594.79
703.09
811.21
919.58
1026.72
1135.04
1276.19
1516.77
1758.20
1992.24

Per MT.
13
124.79
137.46
149.84
161.83
174.12
185.93
197.78
209.51
221.05
232.58
255.70
278.54
301.41
323.40
344.63
427.54
532.92
638.17
745.37
798.36
897.08
994.61
1090.45
1288.99
1487.21
1685.90
1882.32
2080.90
2339.69
2780.74
3223.36
3652.43

You might also like