OCEF

1. This document records the site inspection and testing of an overcurrent and earth fault relay at the RIYADH 7037- 33/13.8 KV substation. 2. Mechanical checks and visual inspections found no issues. Electrical testing was performed for various overcurrent and earth fault settings, injecting currents up to 6 times the set value and verifying pickup times. 3. Test results were satisfactory according to the inspector and witness signatures and dates at the bottom.

Uploaded by

mmsa
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
194 views

OCEF

1. This document records the site inspection and testing of an overcurrent and earth fault relay at the RIYADH 7037- 33/13.8 KV substation. 2. Mechanical checks and visual inspections found no issues. Electrical testing was performed for various overcurrent and earth fault settings, injecting currents up to 6 times the set value and verifying pickup times. 3. Test results were satisfactory according to the inspector and witness signatures and dates at the bottom.

Uploaded by

mmsa
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 2

SITE INSPECTION AND TEST RECORD

OVER CURRENT AND EARTH


FAULT RELAY-7SJ64
Customer: ERC

Order no.:

Record no.:

End Client: SEC

Sheet:

Site: RIYADH 7037- 3313.8 KV substation

Panel / Designation / Location no.:

Project no.:

1 of 2

1.GENERAL DATA AND INFORMATION:


Location
Serial No
Manufacture
Order No

:
:
: SIEMENS
:

Aux Voltage
:
Rated Voltage
:
No Of Contacts
:
Conn Diagram No
:N/A

2.MECHANICAL CHECKS AND VISUAL INSPECTION


ITEM

DESCRIPTION

CHECKE
D
ok
Ok
Ok
Ok
ok

1
Inspect for physical damage / defects.
2
Verify connections as per approved drawings.
3
Check tightness of all connections.
4
Check Ferrules.
5
Check apparatus lists.
3.ELECTRICAL TEST:
I> IDMT,IEC NIV-1.3

REF
RY
YB
BR

SET
CURREN
T
1A
1A
1A

TMS
1.00
1.00
1.00

INJECTED CURRENT
2I

4I

6I

2A
2A
2A

4A
4A
4A

6A
6A
6A

PICKUP TIME
2T

4T

6T

I>> DMT IEC NIV-1.3


REF

SET CURRENT

RY
YB
BR

1A
1A
1A

SET TIME
1 Sec
1 Sec
1 Sec

PICKUP TIMES

2 Sec
2 Sec
2 Sec

I0> IDMT,IEC NIV-1.3


REF
RN
YN
BN

SET
CURREN
T
1A
1A
1A

Tested by:
Name
Signature & Date:

TMS
1.00
1.00
1.00

INJECTED CURRENT
2I

4I

6I

2A
2A
2A

4A
4A
4A

6A
6A
6A
Witnessed by:
Name
Signature & Date:

PICKUP TIME
2T

4T

6T

SITE INSPECTION AND TEST RECORD


OVER CURRENT AND EARTH
FAULT RELAY-7SJ64
Customer: ERC

Order no.:

Record no.:

End Client: SEC

Sheet:

Site: RIYADH 7037- 3313.8 KV substation

Panel / Designation / Location no.:

Project no.:

2 of 2

I0>> DMT IEC NIV-1.3


REF

SET CURRENT

RN
YN
BN

1A
1A
1A

SET TIME
1 Sec
1 Sec
1 Sec

2 Sec
2 Sec
2 Sec

Remarks: Test Results found satisfactory

Tested by:
Name
Signature & Date:

Witnessed by:
Name
Signature & Date:

PICKUP TIMES