Reinforce Concrete Design
Reinforce Concrete Design
Job number:763
Jurutera Perunding
Calc.Sheet no.
Drawings nos.
Structure:PS
Date:
Checked by:
Date:
Beam No:
Beam 6
slab (left)
slab (right
=
=
brickwall
other (1)
other (2)
=
=
=
b(m)
0.3
bvx
0.5
0.5
c(kN/m3)
h(m)
0.45
24
n(kN/m2)
lx(m)
1.5
0.575
1.5
0.575
h(m)
n(kN/m2)
0
0
kN/m
3.24
=
=
0.43125
0.43125
=
=
=
=
bvx
0.5
0.5
n(kN/m2)
1.5
1.5
lx(m)
0.575
0.575
=
=
0.43125
0.43125
=
=
=
=
=
7.1235
10
0
582.408
35.6175
kN/m
m
kNm
kNm
kN
Fixed
Pinned
11/4/2016
Job number:763
Jurutera Perunding
Calc.Sheet no.
Drawings nos.
Structure:PS
Date:
Checked by:
Date:
Hogging Moment(kNm)
Sagging Moment(kNm)
Shear(kN)
fcu(N/mm2) =
fy (N/mm2) =
fyv (N/mm2) =
cover(mm) =
Mid
11/4/2016
30
460
250
20
Support
0
582.408
0
1st layer
2nd layer
35.6175
1st layer
2nd layer
35.6175
1st layer
2nd layer
Tension
bar dia.(mm,bigger)
No. of bar
bar dia.(mm smaller)
No.of bar
h(mm)
d(mm)=h-c-link-bar/2
K
z(mm)
Amin.(mm2)
As req.(mm2)
As prov(mm2)
s(mm)
12
3
0
0
375
339
0.000
322
146
0
339
102
0
0
0
0
25
4
0
0
375
332.5
0.637
248
146
5490
3436
47
<OK>
--
25
3
0
0
12
3
0
0
375
339
0.000
322
146
0
339
102
300.5
Redesign
83
0
0
0
0
0
<OK>
--
Compression
bar dia.(mm)
Number of bar
bar dia.(mm smaller)
No.of bar
d'(mm)=
Amin(mm2)
As' req.(mm2)
As prov(mm2)
s(mm)
Shear
link dia.(mm)
link number
s prov.(mm)
s req. (mm)
v(N/mm2)
100As/bd
400/d
vc
As/sv req.
As/sv prov.
20
3
0
0
40
146
0
942
90
10
1
150
285
0.350
0.33
1.18
0.485
0.552
1.048
0
0
0
0
0
<OK>
--
<OK>
16
3
0
0
38
146
4059
603
96
10
1
200
285
0.000
3.00
1.20
1.014
0.552
0.786
0
0
0
0
0
Redesign
--
<OK>
20
3
0
0
40
146
0
942
90
10
1
150
285
0.350
0.33
1.18
0.485
0.552
1.048
0
0
0
0
0
<OK>
--
<OK>
Deflection
basic l/d
M/bd2
20.00
17.56
fs
490
Mf
0.54
Actual l/d
30.08
Allowable l/d