PDR Toolkit 2 7 (February 2015) Ejemplo
PDR Toolkit 2 7 (February 2015) Ejemplo
Vehicle / MY:
Commodity:
Customer Plant Type:
Cust. Plant Country:
Customer Plant Name:
Plant Code:
Supplier:
Supplier Code:
Sup. Mfg. Location:
Supplier
SQE
Contract
Part Information
PRE-PDR DATA
Part Number
Part Description
Annual Capacity
Vehicle / Model 2
Yes
Part Number
Part Description
0
0
0
0
0
0
0
0
0
0
0
0
Vehicle / Model 1
JC 2015
Vehicle / Model 3
Total Additional
Capacity
1000
0
0
0
0
0
PROCESS INFORMATION
PROCESS
Process #
1
Next Process(es)
Process Description
#
2
fundicion
OPERATING PATTERN
Shifts /
Day
3
2
2
Shifts / Week
15
10
10
Hours /
Shift
8
10
10
Working Days /
Week
5
5
5
DOWNTIME
Scheduled Breaks / Lunch
(min/shift)
50
50
50
Changeovers (min/shift)
20
10
0
15
15
15
Part Number
PDR RESULTS
PROCESS
Next Process(es)
Process #
Process Description
#
1
2
fundicion
2
0
3
0
4
0
5
0
6
0
7
0
8
0
9
0
10
0
11
0
12
0
13
0
14
0
15
0
Part Number
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Planned
Unplanned
12:43
15:12
17:29
40
40
40
0
11
0
376
369
352
Planned
40
51
40
0
0
0
0
0
0
0
0
0
0
0
0
0
PROCESS
Next Process(es)
Process #
Process Description
#
1
2
fundicion
2
0
3
0
4
0
5
0
6
0
7
0
8
0
9
0
10
0
11
0
12
0
13
0
14
0
15
0
Unplanned
Part Number
PDR RESULTS
PROCESS
Next Process(es)
Process #
Process Description
#
1
2
fundicion
2
0
3
0
4
0
5
0
6
0
7
0
8
0
9
0
10
0
11
0
12
0
13
0
14
0
15
0
Part Number
Planned
Unplanned
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
PROCESS
Next Process(es)
Process #
Process Description
#
1
2
fundicion
2
0
3
0
4
0
5
0
6
0
7
0
8
0
9
0
10
0
11
0
12
0
13
0
14
0
15
0
Planned
Unplanned
Part Number
0
PROCESS
PDR RESULTS
Process #
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Next Process(es)
Process Description
#
2
fundicion
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Part Number
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Unplanned
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
PROCESS
Process #
Planned
Next Process(es)
Process Description
#
2
fundicion
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Planned
Unplanned
PDR STAGE
Part Description(s):
Vehicle / MY:
Commodity:
Supplier
Code:
PA READINESS EVALUATION
PA PROCESS EVALUATION
Date
PDR STAGE 1
Date
BLOCK
DIAGRAM
OPEN ISSUES
Date
DATA SHEET
CAPACITY ANALYSIS
SCORING
CAPABILITY
SUMMARY
1 - PURCHASE ORDER
PA READINESS
EVALUATION SCORE*
CONSTRAINT
ANALYSIS
CAPABILITY DATA
3 - RESULTS
A
5
Sub-tier Capacity
Required
Capacity
0
Process
fundicion
0
0
0
0
0
0
0
0
0
0
0
0
0
0
PDR STAGE 2
Date
PDR SCORE
*The Readiness Evaluation should have a score of 3 or higher before running the PDR Stage 1
or Corrective Actions have been implemented to bring score to 3 or higher
2 - PROCESS
Contracted Capacity
R
E
L Date
E
A
S
E
T
O
5 - RESULTS
P
First Time Capability
Line Utilization
R
O
D
.
5
3
(
D
a
PProcess Performance and CapabilityConstraint Management
)
FINAL RESULTS
Actual Line
FTC %
Speed
#DIV/0!
98.1%
Required Line
Speed
0.0
4 - RESULTS
Line
Utilization %
0.0%
Avail. %
Perf. %*
OEE %
0%
#DIV/0!
#DIV/0!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
Const.
Supplier:
DATE
ACC?
#DIV/0!
* Performance cannot exceed 100%. "Red" cells indicate an actual cycle time that is less than the "Ideal Cycle Time"; this should be modified on the Data Sheet
Sub-Component
Req'd
Capac.
Actual
Capac.
Acc
Sub-Component
Req'd
Capac.
Actual
Capac.
Acc
Sub-Component
Req'd
Capac.
Actual
Capac.
Acc
Sub-Component
Req'd
Capac.
SQE
SIGNATURE
DATE
SIGNATURE
DATE
ENGINEER
SIGNATURE
DATE
SIGNATURE
DATE
Actual
Capac.
Acc
Part Description(s):
Vehicle / M.Y.:
Supplier:
Commodity:
Supplier Code:
Supplier Mfg.
Location:
Supplier Name
Part Number(s)
Part Description(s)
Contracted Capacity, Total
Annual:
Annual:
No. of process
Next process(es)
PRODUCTION SYSTEM
fundicion
OVERALL PROCESS
15
15
No. of process
Next process(es)
fundicion
Total Downtime
Availability
40
51
40
0
0
0
0
0
0
0
0
0
0
0
0%
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
PDR
Start
Time
PDR
End
Time
9:00
9:30
10:30
12:43
15:12
17:29
Next process(es)
No. of process
Part #:
Next process(es)
No. of process
Part #:
PDR
Start
Time
PDR
End
Time
PDR
Start
Time
PDR
End
Time
Next process(es)
No. of process
Part #:
Next process(es)
No. of process
Part #:
PDR
Start
Time
PDR
End
Time
PDR
Start
Time
PDR
End
Time
Next process(es)
No. of process
Part #:
Next process(es)
No. of process
Part #:
PDR
Start
Time
PDR
End
Time
Daily:
Daily:
NAFTA
Gross Min
Available Per Day
480
1440
Scheduled
Changeover / Tool
Break/Lunch
Changes [minutes
[minutes per day]
per day]
150
60
8
PDR STUDY RESULTS
Performance
#DIV/0!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
Length
of
PDR
(minutes)
PDR
Total Parts
Attempted
[pcs.]
PDR
Good Parts
Produced
[pcs.]
Base Required
PDR Line Speed
(Parts/hour)
0.0
376
369
0.0
#VALUE!
PDR Actual
Downtime [minutes]
Length
of
PDR
(minutes)
PDR
Total Parts
Attempted
[pcs.]
PDR
Good Parts
Produced
[pcs.]
40
51
40
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
376
369
352
0
0
0
0
0
0
0
369
352
350
0
0
0
0
0
0
0
Base Required
PDR Line Speed
(Parts/hour)
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
PDR Actual
Downtime [minutes]
Length
of
PDR
(minutes)
PDR
Total Parts
Attempted
[pcs.]
PDR
Good Parts
Produced
[pcs.]
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Base Required
PDR Line Speed
(Parts/hour)
PDR Actual
Downtime [minutes]
Length
of
PDR
(minutes)
PDR
Total Parts
Attempted
[pcs.]
PDR
Good Parts
Produced
[pcs.]
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Base Required
PDR Line Speed
(Parts/hour)
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
PDR Actual
Downtime [minutes]
Length
of
PDR
(minutes)
PDR
Total Parts
Attempted
[pcs.]
PDR
Good Parts
Produced
[pcs.]
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Base Required
PDR Line Speed
(Parts/hour)
PDR Actual
Downtime [minutes]
Length
of
PDR
(minutes)
PDR
Total Parts
Attempted
[pcs.]
PDR
Good Parts
Produced
[pcs.]
0
0
0
0
0
0
0
0
Base Required
PDR Line Speed
(Parts/hour)
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
PDR Actual
Downtime [minutes]
Length
of
PDR
(minutes)
PDR
Total Parts
Attempted
[pcs.]
PDR
Good Parts
Produced
[pcs.]
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Base Required
PDR Line Speed
(Parts/hour)
Planned
Maintenance
[minutes per day]
DY RESULTS
45
Unscheduled
Net Min Available
Downtime [minutes
Per Day
per day]
120
1065
Net minutes
available / day for
Study parts
360
705
Additional Parts/Hr
required (due to
true scrap)
Actual
PDR
Line Speed
[Parts/hour]
PDR
FTC
(%)
0.0
#DIV/0!
#DIV/0!
98.1%
Actual
PDR
Line Speed
[Parts/hour]
PDR
FTC
(%)
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
DY RESULTS
Additional Parts/Hr
required (due to
true scrap)
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
DY RESULTS
Additional Parts/Hr
required (due to
true scrap)
Actual
PDR
Line Speed
[Parts/hour]
PDR
FTC
(%)
Actual
PDR
Line Speed
[Parts/hour]
PDR
FTC
(%)
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
DY RESULTS
Additional Parts/Hr
required (due to
true scrap)
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
DY RESULTS
Additional Parts/Hr
required (due to
true scrap)
Actual
PDR
Line Speed
[Parts/hour]
PDR
FTC
(%)
Actual
PDR
Line Speed
[Parts/hour]
PDR
FTC
(%)
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
DY RESULTS
Additional Parts/Hr
required (due to
true scrap)
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
DY RESULTS
Additional Parts/Hr
required (due to
true scrap)
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
Actual
PDR
Line Speed
[Parts/hour]
PDR
FTC
(%)
Completed by:
% Scrap
% True Scrap
(Total Loss)
Estimated
Throughput For
Study Parts Per
Day
30
1.86%
0.00%
1410
Required / Contracted
Parts Per Day
7
17
2
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
by:
% Utilization
0.00%
RESULT: Possible
Constraint
Operation (>90%)
Are Marked [X]
Minimum
Maximum
Supplier Name
Part(s) Description
Part(s) Number
Annual:
Next operation(s)
Annual:
No. of operation
Contracted Capacity
0
0
Shift 2
Op1
600
600
Op2
600
600
Op3
600
600
Op4
600
600
Op5
600
600
No. of operation
Next operation(s)
OPERATIONS
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Op1
Op2
Op3
Op4
Op5
10
10
10
10
10
Gross Min
Available Per Day
0
0
0
0
0
0
0
0
0
1200
1200
1200
1200
1200
0
0
0
0
0
0
0
0
0
Next operation(s)
No. of operation
PRODUCTION SYSTEM
PDR
Start
Time
PDR
End
Time
Op1
10:30
17:29
Op2
10:30
17:29
Op3
10:30
17:29
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Op4
10:30
17:29
Op5
10:30
17:29
0
0
0
0
0
0
0
0
This form to be used by the Supplier to identify a constraint operation when a process h
Daily:
Daily:
CONSTRAINT PRODUCTION L
Shift 3
Per Day
Shift 1
Shift 2
Shift 3
1200
50
50
1200
50
50
1200
50
50
1200
50
50
1200
50
50
0
0
0
0
0
0
0
0
0
0
Scheduled
Changeover / Tool
Break/Lunch
Changes [minutes
[minutes per day]
per day]
Planned
Unscheduled
Maintenance
Downtime [minutes
[minutes per day]
per day]
100
100
100
100
100
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
20
20
30
20
20
0
0
0
0
0
0
0
0
0
30
30
30
30
30
0
0
0
0
0
0
0
0
0
PDR Actual
Planned Downtime
[minutes]
PDR Actual
Unplanned
Downtime
[minutes]
Length
of
PDR
(minutes)
PDR
Total Parts
Attempted
[pcs.]
MCBF
[cycles]
PDR
Good Parts
Produced
[pcs.]
40
379.0
352
352
40
379.0
352
352
40
379.0
352
350
40
379.0
350
350
40
379.0
350
350
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
minutes)
Per Day
Shift 1
Shift 2
Shift 3
Per Day
100
100
100
100
100
MTTR [minutes]
1050
1050
1040
1050
1050
0
0
0
0
0
0
0
0
0
1050
1050
1040
1050
1050
0
0
0
0
0
0
0
0
0
Cycle Time
[seconds]
55
55
65
50
55
Actual
PDR
Line Speed
[Parts/hour]
0.0
0.0
55.7
YES
0.0
0.0
55.7
YES
0.0
0.0
55.4
YES
0.0
0.0
55.4
YES
0.0
0.0
55.4
YES
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
Overall FTC
Date:
Completed by:
Unschedu
Shift 1
Shift 2
Shift 3
Per Day
Shift 1
10
10
20
15
10
10
20
15
15
15
30
15
10
10
20
15
10
10
20
15
0
0
0
0
0
0
0
0
0
0
Buffer Before
Operation
Buffer After
Operation
% True Scrap
(Total Loss)
Estimated
Throughput For
Study Parts Per
Day
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
0
0
0
0
0
0
0
0
0
0
0
0
0
0
1145
1145
960
1260
1145
0
0
0
0
0
0
0
0
0
#VALUE!
Availability
Performance
% Scrap
0.00%
0.00%
0.57%
0.00%
0.00%
PDR
FTC
(%)
100.0%
100.0%
85.1%
100.0%
100.0%
85.1%
99.4%
100.0%
100.6%
100.0%
100.0%
77.0%
100.0%
100.0%
84.7%
85.1%
85.1%
100.0%
77.0%
84.7%
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
99.4%
Shift 2
Shift 3
Per Day
15
30
15
30
15
30
15
30
15
30
0
0
0
0
0
0
0
0
0
0
l Equipment Effectiveness
(OEE)
% Utilization
RESULT: Possible
Constraint
Operation (>90%)
Are Marked [X]
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
#NAME?
0.00%
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
85.1%
85.1%
100.0%
77.0%
84.7%
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
Item
Guidelines
NAFTA
The contracted capacity (Daily Tooling Capacity) shall be enough to meet Customer requirements. If
the Increased Contract Capacity (FIAT) or Capacity Planning Volume (CPV) exceeds the contract
capacity, it shall be temporary and the Supplier shall be able to meet these requirements through
standard means (e.g., overtime, weekend runs, etc.). When running higher volumes, the Supplier
shall still be able to do all required maintenance activities, quality controls, etc.
1A
Contracted Capacity
1B
The Supplier's volumes of parts intended for Spare Parts (After Sales) shall be considered into the
evaluation of Supplier's production capacity. The Supplier shall meet the Required Line Speed with
the Spare Parts included.
2A
The PDR shall be run on production tooling; with production tooling, equipment, & gages; and in
production facilities. Operating conditions shall mimic those of regular production, with required
breaks, maintenance, etc. performed.
2B
3A
Capacity Verification
3B
Sub-tier Capacity
The Supplier shall perform PDR (and other Process Audit) activities on their sub-tier suppliers and
components (see 2E on the Process Audit tool). Verify that all sub-tier suppliers are able to provide
the required number of parts per day.
Operators used in the PDR shall be fully trained on the process, and be intended production
operators.
The throughput of the Final process or operation (and also that of the Constraint process or
operation, if applicable) must meet or exceed the Required Line Speed.
4A
The Supplier shall demonstrate a First Time Capability (FTC) of 90% or greater. For multiple
production lines, tools, and/or cavities, FTC shall each be calculated separately. Rework and repair
are NOT counted in the number of acceptable parts.
4B
The parts shall meet all Performance and Capability requirements, as shown on the "Performance Capability Reqs." chart.
5A
Line Utilization
5B
Constraint Management
Carryover
design
The Supplier's volumes of parts intended for Spare Parts (After Sales) shall be considered into the eval
Past
successful
launches
New
Past launch Some significDesign incomple
of Incomplete
Appearance paaware
Supplier awareTooling Kick-o One or more keSupplier has aSupplier is "y Supplier not me
Part or related Part or related part has some historical warranty (no field actions)
Chrysler
/ Capacity
commodity
issues
or
requirements list,
plan
FIAT design increase/new for
current limited
but
issues needs
responsible tooling
supplier
resources
exist
to improvement
location
(max. 3)
meeting them (max. 3)
(max. 3)
other
(see other
(see other
(see other
(see other
(see other
(see other
(see other
(see
other
(see other
(see other
(see other
(see other
(see other
(see other
(see other
(see
Comments) Comments) Comments) Comments) Comments) Comments) Comments) Comments)
Comments) Comments) Comments) Comments) Comments) Comments) Comments) Comments)
Line Utilization shall be 90% or less for all production lines. Otherwise, the Constraint Analysis shall
be performed with appropriate contingency (Risk Mitigation) plans in place.
If a constraint is identified, the Supplier shall demonstrate correct management techniques to
ensure the constraint is optimized. Part loading and unloading responsibility shall be assigned and
itemized in operator instructions, and buffer/WIP quantities before and after identified and
managed.
Current
No
new
supplier
technology
location
Pagina 58 di 91
BOX
SCORE
Supplier _________________
(Name Signature)
OPEN ISSUE
CORRECTIVE ACTION
RESPONSIBLE
DEPARTMENT
SQE_____________________
(Name Signature)
OPEN DATE
Supplier _________________
(Name Signature)
TARGET DATE
ACTUAL DATE
STATUS
SQE_____________________
(Name Signature)
Score
Classification
Advance Quality D
JOB STOPPER
JOB STOPPER
RISK
MODERATE RISK
LOW RISK
IMPLEMENTED
ACTIVITY
NA
NOT APPLICABLE
NV
NOT EVALUATED
e/vehicle launch
ild/launch issues or may cause critical quality spills in
eld campaigns, etc.)
stemic control failures
milestone
nd is acceptable
vehicle launch
ity spills in production not impacting critical / safety
Has resulted in critical quality spills (yardholds, PRIs, field campaigns, etc.)
Corrective Action Plan does not exist.
Results in process producing defective material with no adequate controls in place
Total lack of quality system or systemic control
Has resulted in moderate quality spills (NCTs, Bills, etc.) or may result in critical quality
spills in the future
Corrective Action Plan exists but is not acceptable; needs containment action
Can result in process producing defective material with inadequate controls in place
Chronic quality system or systemic control failures
May result in moderate quality spills in the future not impacting critical / safety
characteristics
Corrective Action Plan exists and is acceptable
Can result in process becoming unstable (may need additional controls added)
Non-chronic quality system or systemic control failures
Supplier Name
Part(s) Description
Part(s) Number
Quantity of Parts Measured
Char. #
Class.
Characteristic Description
Attribute / Variable
Process or
Machine Char?
1.33
1.67
Required PP / PPK
PP
PPK
#DIV/0!
Attribute
Variable
Process
Machine
Yes
No
Date:
Completed by:
bility
Required CP / CPK
CP
CPK
#DIV/0!
Required CM / CMK
CM
CMK
Gage R&R %
#DIV/0!
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Acceptable? (Y/N)
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Char #
Classification
Characteristic Description
Specification
USL
LSL
Attribute/Variable
Attribute
Variable
Process or Machine?
Process
Machine
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
Gage R&R1
Gage R&R2
Gage R&R3
Gage R&R4
Mean
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
Range
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
1.128
1.693
2.059
2.326
2.534
2.704
2.847
2.97
3.078
3.173
3.258
3.336
3.407
3.472
3.532
3.588
3.64
3.689
3.735
3.778
3.819
3.858
3.895
3.931
Subgroup Size
Avg. Range
Std. Dev.
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
d2
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
Dimensionally
Correct?
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
PP
PPK
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
CP
CPK
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
CM
CMK
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
Ppu / Cmu
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
Ppl / Cml
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
Cpu
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
Cpl
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
Date
Revision Number
21-Dec-12
2.0
12-Feb-13
2.1
19-Sep-13
2.2
14-Mar-14
2.3
14-Aug-14
2.4
05-Sep-14
2.5
05-Dec-14
2.6
27-Feb-15
2.7
Revision Description
Renamed tabs, added Data Sheet, new PDR Summary form, revised Capacity Analysis and Co
Analysis, added Capability Requirements, revised Open Issues (added Open Date and Actual D
columns), added Requirements tab
Fixed truescrap function for when scrap is zero
Added "Department" column and conditional formatting to Status column on Open Issues, add
to allow sector logo to switch when different sectors are chosen on the PDR Summary sheet; a
comments to cells on Data Sheet, fixed bug on Capacity Analysis when manually altering cell
of PDR Summary changed to match other tools
Fixed bug on PDR Summary, eliminated rounding errors on capacity analysis.
Revised FIAT Industrial logo to CNH Industrial, added logos to remaining sheets, added "Custo
Plant" and "Customer Plant Loc" to data sheet, keyed assumed working days to "Customer Pla
Removed assumed working days (made manual entry for annual volumes), removed CNH Ind
added Maserati
Added OEE calculations (Overall Equipment Effectiveness), along with Availability % and Perfo
%
Added Customer plant codes, names, and locations
Split Actual Downtime in the PDR Results section into Planned and Unplanned downtime
Revised method of determining additional parts required due to true scrap.
Unprotected Operating Pattern cells
Revised scoring (Moderate Issue to Moderate Risk; No Risk to Low Risk)
Plant name and code are manual entry
Revised logo to FCA logo
Added comments to Open Issues sheet
Revised "Planned Cycle Time" to "Ideal Cycle Time" and clarified comments.
Revised comments for downtime factors
Added note and conditional formatting for when Performance calculation exceeds 100%
Changed sector names to region names
Updated capability requirements to match global commonized standards
Fixed error on Capacity Analysis with Annual contracted capacities
Sheet
All
Capacity Analysis
Data Sheet, Open Issues, PDR Summary,
Capacity Analysis
All