Design Calculation Steel Structure Power Plant
Design Calculation Steel Structure Power Plant
Co
L.L.C
P.O.Box 2756,Ruwi, P. C.
112
Sultanate of Oman
Introduction
This Design Calculations Package has been prepared using the latest applicable American codes and
standards and the latest developments in engineering practices. A competent design engineer
prepared the calculations and another competent engineer checked his work.
Software used are STAAD for structural analysis and design. The output of these programs has been
incorporated in this package.
For your easy reference, all pages have been numbered and a table of contents has been provided.
We have divided the package into two sections as follows:
1. Design Information: This section contains the description of the building designed, design
codes and material specifications used, design assumptions, loads and important design
sketches.
2. Computer Design Printouts: This section includes the output of computer programs used in
the design.
Please use this calculations package in conjunction with the drawings provided. You can resubmit
this package with the drawings to other parties for their approval as required, or, keep this package
for future reference.
For any questions regarding this package please do not hesitate to contact our engineering
department.
Engineering Department
Job No: E-1152 Building No: 01 Revision No: 01
Table of Contents
Introduction.........................................................................................................................................2
1. The loads as described in the Design Summary Sheet have been applied on the structure in
accordance with:
MBMA “Metal Buildings Manufacturers Association” Low Rise Building Systems Manual,
1986
1300 Sumner Ave. Cleveland, Ohio 44115.
2. Hot rolled sections and built up components have been designed in accordance with :
AISI “American Iron and Steel Institute” Cold Formed Steel Design Manual, 2001 Edition
1000 16th Street, NW, Washington, DC 20036.
AWS D1.1:2006 “American Welding Society” Structural Welding Code - Steel, 17th Edition.
550 N.W. LeJeune Road, Miami, Florida 33126.
DESIGN SHEET Page 6 of 57
Job No. E-1152 Building No. 1 Rev. No. 00 01
Customer M/S RURAL AREAS ELECTRICITY COMPANY Date 21-05-09 15-06-09
Description Designed By NIB NIB
Material Specifications
The following is the list of the material standards and specifications for which the building components
have been designed:
2. Hot-Rolled Members
• Beams BS EN 10025 S275 JR Fy = 27.5 kN/cm2
5. X-Bracing Members
• Rods BS EN 10025 S275 JR Fy = 27.5 kN/cm2
• Angles BS EN 10025 S275 JR Fy = 27.5 kN/cm2
Combinations Checked By
Design Assumptions
• The main frame rafters and exterior columns are rigidly connected to each other (using moment
type connections). The rafters are continuous over the columns.
• The lateral stability of the building is provided through the frame action of the main frames.
• The longitudinal stability of the building is provided through the truss action in the cross braced
bays of the building.
• The roof purlins are continuous beams supported at rigid frame locations and span the bay
spacing of the building.
• The roof and wall sheeting provide lateral support for purlins and girts.
Load Combinations
Design Summary
Frame Type Clear Span Panel Type Thick Material
Building Width 11850 C/C of Steel col. Roof: TOP Sandwich Panel 26 Gauge GI
(MM) BOT
Liner 26 Gauge GI
Bay Spacing (MM) 5800+4@5950+5800 C/C of Insulation PU 50mm PU 35kg/cum
Steel frame Wall Single Skin 26 Gauge GI
Eave Height (MM) 8000 Clear Cold Formed Sections Finish
GI
Roof Slope 1: 10
Live Load (Roof) 0.57 KN/M2 Purlin Lap: 350mm(end bay) & 80mm(interior)
Live Load (Frame) 0.57 KN/M2 202Z15 For All Bays
Wind Speed ( 3 sec. 165.6 KM/Hour Max. spacing= 1600mm
gust )
Dead Load (Self Wt) 0.17 KN/M2 SW Girt Lap: 350mm(end bay) & 80mm(interior)
Collateral load 0.00 KN/M2 202Z15 For All Bays Max. spacing= 1580mm
Other loads : NIL EW Girt Lap: 350mm
202Z15 For All Bays Max. spacing= 1600mm
Remarks:
* ALL AROUND FULL HEIGHT SHEETING
RIDGE LINE
D
DESIGN SHEET Page 9 of 57
Job No. E-1152 Building No. 1 Rev. No. 00 01
Customer M/S RURAL AREAS ELECTRICITY COMPANY Date 21-05-09 15-06-09
Description Purlin Design Sheet Designed By NIB NIB
Checked By
By Structrural analysis using Stiffness Matrix Analysis the following Internal Forces are obtained
** DL+LL
Moment-Left Support kN.m 0.00 -5.79 -1.40 -1.40 -1.40 -5.79 0.00 0.00 0.00 0.00
Moment-Left Lap kN.m 0.00 -4.12 -1.40 -1.40 -1.40 -4.05 0.00 0.00 0.00 0.00
Moment-Mid Span kN.m 4.25 3.42 5.44 5.44 3.42 4.25 0.00 0.00 0.00 0.00
Moment-Right Lap kN.m -4.05 -1.40 -1.40 -1.40 -4.12 0.00 0.00 0.00 0.00 0.00
Shear-Left Lap kN 3.60 4.79 4.56 4.56 3.83 5.02 0.00 0.00 0.00 0.00
Shear-Right Lap kN -5.02 -3.83 -4.56 -4.56 -4.79 -3.60 0.00 0.00 0.00 0.00
** WL SUCTION
Moment-Left Support kN.m 0.00 -6.50 -1.86 -1.86 -1.86 -5.80 0.00 0.00 0.00 0.00
Moment-Left Lap kN.m 0.00 -4.82 -1.86 -1.86 -1.86 -4.06 0.00 0.00 0.00 0.00
Moment-Mid Span kN.m 5.24 2.87 4.99 4.99 3.16 4.26 0.00 0.00 0.00 0.00
Moment-Right Lap kN.m -4.45 -1.86 -1.86 -1.86 -4.16 0.00 0.00 0.00 0.00 0.00
Shear-Left Lap kN 4.36 4.84 4.57 4.57 3.91 5.03 0.00 0.00 0.00 0.00
Shear-Right Lap kN -5.93 -3.80 -4.57 -4.57 -4.72 -3.60 0.00 0.00 0.00 0.00
** DL+LL
Left Support 0.86 0.81 0.63 0.68 0.63 0.81 0.54
Left Lap 0.32 0.72 0.41 0.41 0.34 0.71
Mid Span 0.75 0.60 0.96 0.96 0.60 0.75
Right Lap 0.71 0.34 0.41 0.41 0.72 0.32
Deflection Cm 2.00 1.50 3.07 3.07 1.50 2.00 0.00 0.00 0.00 0.00
Allowable Cm 3.33 3.33 3.33 3.33 3.33 3.33
** WL SUCTION
Left Support 0.49 0.82 0.47 0.51 0.48 0.74 0.40
Left Lap 0.29 0.64 0.31 0.31 0.26 0.54
Mid Span 0.69 0.38 0.66 0.66 0.42 0.56
Right Lap 0.59 0.25 0.31 0.31 0.55 0.24
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Deflection Cm -Ve 2.54 1.09 2.75 2.75 1.34 2.01 0.00 0.00 0.00 0.00
Allowable Cm -Ve 5.00 5.00 5.00 5.00 5.00 5.00
All Stress Ratios as per above are less than 1.0 - Use Sizes as given above.
Point of CF - Left m 0.00 1.57 0.44 0.44 0.53 1.27 0.00 0.00 0.00 0.00
Unbraced Length m 4.81 3.88 5.12 5.12 4.08 4.73 0.00 0.00 0.00 0.00
Point of CF Right m 1.19 0.55 0.44 0.44 1.39 0.00 0.00 0.00 0.00 0.00
Sag Rod Spacing from Centre m 2.40 1.94 2.56 2.56 2.04 2.37 0.00 0.00 0.00 0.00
DESIGN SHEET Page 10 of 57
Job No. E-1152 Building No. 1 Rev. No. 00 01
Customer M/S RURAL AREAS ELECTRICITY COMPANY Date 21-05-09 15-06-09
Description Designed By NIB NIB
Checked By
Spans m 6.00 6.00 6.00 6.00 6.00 6.00 5.80 6.40 Span = 1
WL PRESSURE kN/m 1.44 1.44 1.44 1.44 1.44 1.44 1.44 1.44
WL SUCTION kN/m -1.58 -1.58 -1.58 -1.58 -1.58 -1.58 -1.58 -1.58
The above values are calculated by adding the loads and multiplying by the purlin spacing. Print
Print All
All
1 1 1 1 1 1 1 1 1 1 1
Girt Sizes 200Z15 200Z15 200Z15 200Z15 200Z15 200Z15 200Z15 200Z15
Girt Lap C S S S C C
S= Short lap 65 mm each side. C= Continous lap 350 mm each side.
Wind Increase 1.33
By Structrural analysis using Stiffness Matrix Analysis the following Internal Forces are obtained
** WL PRESSURE
Moment-Left Support kN.m 0.00 -5.47 -1.40 -1.40 -1.40 -5.47 0.00 0.00 -6.74 0.00
Moment-Left Lap kN.m 0.00 -3.91 -1.40 -1.40 -1.40 -3.83 0.00 0.00 -4.95 0.00
Moment-Mid Span kN.m 4.02 3.19 5.07 5.07 3.19 4.02 0.00 3.15 4.38 0.00
Moment-Right Lap kN.m -3.83 -1.40 -1.40 -1.40 -3.91 0.00 0.00 -5.06 0.00 0.00
Shear-Left Lap kN 3.40 4.52 4.31 4.31 3.63 4.75 0.00 3.01 5.18 0.00
Shear-Right Lap kN -4.75 -3.63 -4.31 -4.31 -4.52 -3.40 0.00 -4.86 -3.55 0.00
** WL SUCTION
Moment-Left Support kN.m 0.00 6.02 1.86 1.86 1.86 6.02 0.00 0.00 7.41 0.00
Moment-Left Lap kN.m 0.00 4.31 1.86 1.86 1.86 4.21 0.00 0.00 5.44 0.00
Moment-Mid Span kN.m -4.42 -3.33 -5.26 -5.26 -3.33 -4.42 0.00 -3.46 -4.82 0.00
Moment-Right Lap kN.m 4.21 1.86 1.86 1.86 4.31 0.00 0.00 5.56 0.00 0.00
Shear-Left Lap kN -3.74 -4.92 -4.74 -4.74 -4.05 -5.23 0.00 -3.31 -5.70 0.00
Shear-Right Lap kN 5.23 4.05 4.74 4.74 4.92 3.74 0.00 5.34 3.90 0.00
** WL PRESSURE
Left Support 0.61 0.57 0.45 0.48 0.45 0.57 0.38 0.34 0.62 0.40
Left Lap 0.23 0.52 0.29 0.29 0.24 0.51 0.20 0.65
Mid Span 0.53 0.42 0.67 0.67 0.42 0.53 0.42 0.58
Right Lap 0.51 0.24 0.29 0.29 0.52 0.23 0.67 0.24
Deflection Cm 1.90 1.40 2.85 2.85 1.40 1.90 0.00 1.11 2.25 0.00
Allowable Cm 3.33 3.33 3.33 3.33 3.33 3.33 3.22 3.56
** WL SUCTION
Left Support 0.25 0.40 0.16 0.16 0.16 0.40 0.25 0.22 0.49 0.26
Left Lap 0.25 0.57 0.32 0.32 0.27 0.56 0.22 0.72
Mid Span 0.83 0.63 0.99 0.99 0.63 0.83 0.65 0.91
Right Lap 0.56 0.27 0.32 0.32 0.57 0.25 0.73 0.26
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Deflection Cm -Ve 2.08 1.42 2.91 2.91 1.42 2.08 0.00 1.23 2.47 0.00
Allowable Cm -Ve 5.00 5.00 5.00 5.00 5.00 5.00 4.83 5.33
All Stress Ratios as per above are less than 1.0 - Use Sizes as given above.
Point of CF - Left m 0.00 1.39 0.42 0.42 0.51 1.27 0.00 0.00 1.46 0.00
Unbraced Length m 4.73 4.10 5.16 5.16 4.10 4.73 0.00 4.18 4.94 0.00
Point of CF Right m 1.27 0.51 0.42 0.42 1.39 0.00 0.00 1.62 0.00 0.00
Sag Rod Spacing from Centre m 2.37 2.05 2.58 2.58 2.05 2.37 0.00 2.09 2.47 0.00
DESIGN SHEET Page 11 of 57
Job No. E-1152 Building No. 1 Rev. No. 00 01
Customer M/S RURAL AREAS ELECTRICITY COMPANY Date 21-05-09 15-06-09
Description Designed By NIB NIB
_________________________________________________________________________________________________
BRIDGE INPUT
-------------------------------------------------------------------------------------------------
| Lift Capacity | Bridge weight | Trolley weight| Wheel load | Wheel base | Sys
span | Brge 1| Brge 2| Brge 1| Brge 2| Brge 1| Brge 2| Brge 1| Brge 2|Brge 1 |Brge 2 | Dist
(M) | (kn) | (kn) | (kn) | (kn) | (kn) | (kn) | (kn) | (kn) | (M) | (M) | (M)
-------------------------------------------------------------------------------------------------
11.00 50.00 0.00 30.00 0.00 3.70 0.00 31.90 0.00 2.20 0.00 0.00
4.00 1.03 108.23 60.59 146.65 112.11 206.40 15.86 89.40 18.40 165.00 0.53 0.54
4.15 1.03 108.23 56.01 146.65 103.65 206.40 15.91 89.40 16.99 165.00 0.49 0.50
4.31 1.03 108.23 51.42 146.65 95.15 206.40 15.96 89.40 15.57 165.00 0.45 0.46
4.46 1.03 108.23 46.82 146.65 86.63 206.40 16.01 89.40 14.16 165.00 0.41 0.42
4.62 1.03 108.23 42.20 146.65 78.09 206.40 16.06 89.40 12.74 165.00 0.37 0.38
4.77 1.03 108.23 37.57 146.65 69.52 206.40 16.11 89.40 11.32 165.00 0.33 0.34
4.92 1.03 108.23 32.92 146.65 60.92 206.40 16.16 89.40 9.91 165.00 0.29 0.30
5.08 1.03 108.23 28.26 146.65 52.29 206.40 16.21 89.40 8.49 165.00 0.25 0.25
5.23 1.03 108.23 23.59 146.65 43.64 206.40 16.26 89.40 7.08 165.00 0.21 0.21
5.38 1.03 108.23 18.90 146.65 34.97 206.40 16.30 89.40 5.66 165.00 0.17 0.18
5.54 1.03 108.23 14.19 146.65 26.26 206.40 16.35 89.40 4.25 165.00 0.13 0.18
5.69 1.03 108.23 9.48 146.65 17.54 206.40 16.40 89.40 2.83 165.00 0.09 0.18
5.85 1.03 108.23 4.75 146.65 8.78 206.40 16.45 89.40 1.42 165.00 0.05 0.18
6.00 1.03 108.23 -0.00 146.65 -0.00 206.40 16.50 89.40 -0.00 165.00 0.01 0.18
BEAM COMPONENTS
Top (comp) flange Web Bottom (tens) flange
------------------------------------------------------------------------------------------------------------
Channel | Plate | Plate | Plate
Description | d | wt | yield | w | t | yield | height| t | yield | w | t | yield
| (mm) |(kg/M)| (mpa) | (mm) | (mm) | (mpa) | (mm) | (mm) | (mpa) | (mm) | (mm) | (mpa)
------------------------------------------------------------------------------------------------------------
C230X75X26 230.00 25.70 275.00 0.00 0.0000 0.00 370.00 5.0000 275.00 175.00 6.0000 344.00
1. STAAD PLANE
INPUT FILE: MF.STD
2. START JOB INFORMATION
3. ENGINEER DATE 29-APR-09
4. JOB NAME NEW POWR STATION
5. JOB CLIENT M/S BEST CHOICE
6. JOB NO E-11
7. JOB REV 00
8. JOB PART MAIN FRAME
9. ENGINEER NAME NIB
10. END JOB INFORMATION
11. INPUT WIDTH 79
12. UNIT METER KN
13. JOINT COORDINATES
14. 1 0 0 0; 2 0 8.45 0; 3 6.1 9.06 0; 4 12.2 8.45 0; 5 12.2 0 0; 6 0 6.29777 0
15. 7 12.2 6.29777 0; 8 0.75 6.29777 0; 9 11.45 6.29777 0
16. MEMBER INCIDENCES
17. 1 1 6; 2 3 2; 3 3 4; 4 5 7; 5 6 2; 6 7 4; 7 6 8; 8 7 9
18. SUPPORTS
19. 1 5 PINNED
20. DEFINE MATERIAL START
21. ISOTROPIC STEEL
22. E 2.05E+008
23. POISSON 0.3
24. DENSITY 76.8195
25. ALPHA 1.2E-005
26. DAMP 0.03
27. END DEFINE MATERIAL
28. CONSTANTS
29. MATERIAL STEEL ALL
30. UNIT MMS KN
31. MEMBER PROPERTY AMERICAN
32. *--------------RAFTER------------------- -
33. 2 3 TAPERED 350 5 350 175 6 175 6
34. *--------------COLUMN------------------- -
35. 1 4 TAPERED 250 5 400 175 6 175 6
36. 5 6 TAPERED 400 5 400 175 6 175 6
37. UNIT METER KN
38. MEMBER PROPERTY BRITISH
39. 7 8 TABLE ST UB305X165X40
DESIGN SHEET Page 19 of 57
Job No. E-1152 Building No. 1 Rev. No. 00 01
Customer M/S RURAL AREAS ELECTRICITY COMPANY Date 21-05-09 15-06-09
Description Designed By NIB NIB
Checked By
P R O B L E M S T A T I S T I C S
-----------------------------------
NUMBER OF JOINTS/MEMBER+ELEMENTS/SUPPORTS = 9/ 8/ 2
DESIGN SHEET Page 22 of 57
Job No. E-1152 Building No. 1 Rev. No. 00 01
Customer M/S RURAL AREAS ELECTRICITY COMPANY Date 21-05-09 15-06-09
Description Designed By NIB NIB
Checked By
196. PARAMETER 1
197. CODE AISC
198. FYLD 275000 ALL
199. *-------------------- -
200. *COLUMNS
201. *-------------------- -
202. UNL 1.5 MEMB 1 4 TO 6
203. LY 1.5 MEMB 1 4 TO 6
204. LZ 8.8 MEMB 1 4 TO 6
205. KZ 1.5 MEMB 1 4 TO 6
206. *-------------------- -
207. *RAFTER
208. *-------------------- -
209. UNT 1.5 MEMB 2 3
210. UNB 3 MEMB 2 3
211. LY 3 MEMB 2 3
212. LZ 6.1 MEMB 2 3
213. MAIN 0 ALL
214. TAPER 0 ALL
215. BEAM 1 ALL
216. TRACK 2 ALL
217. LOAD LIST 100 TO 129
218. CHECK CODE ALL
DESIGN SHEET Page 26 of 57
Job No. E-1152 Building No. 1 Rev. No. 00 01
Customer M/S RURAL AREAS ELECTRICITY COMPANY Date 21-05-09 15-06-09
Description Designed By NIB NIB
Checked By
STEEL DESIGN
STAAD.PRO CODE CHECKING - (AISC 9TH EDITION)
********************************************
|--------------------------------------------------------------------------|
| Y PROPERTIES |
|************* | IN CMS UNIT |
| * |=============================| ===|=== ------------ |
|MEMBER 1 * | AISC SECTIONS | | AX = 40.40 |
| * | TAP ERED | | --Z AY = 17.59 |
|DESIGN CODE * | | | AZ = 14.02 |
| AISC-1989 * =============================== ===|=== SY = 61.30 |
| * SZ = 529.22 |
| * |<---LENGTH (M)= 6.30 --->| RY = 3.83 |
|************* RZ = 13.44 |
| |
| 62.9 (KNS-METRE) |
|PARAMETER | L102STRESSES |
|IN KNS CMS | L102L102 IN NEWTON MMS|
|--------------- + L102L102 -------------|
| KL/R-Y= 39.21 | FA = 90.96 |
| KL/R-Z= 98.21 + L102 fa = 17.82 |
| UNL = 150.00 | L102 FCZ = 165.00 |
| CB = 1.00 + L102 FTZ = 165.00 |
| CMY = 0.85 | L102 FCY = 168.99 |
| CMZ = 0.85 + L102 FTY = 168.99 |
| FYLD = 27.50 |L0 fbz = 99.46 |
| NSF = 1.00 +---+---+---+---+---+---+---+---+---+---| fby = 0.00 |
| DFF = 0.00 -3.5 Fey = 686.48 |
| dff= 0.00 ABSOLUTE MZ ENVELOPE Fez = 109.44 |
| (WITH LOAD NO.) FV = 85.24 |
| fv = 4.76 |
| |
| MAX FORCE/ MOMENT SUMMARY (KNS-METRE) |
| ------------------------- |
| |
| AXIAL SHEAR-Y SHEAR-Z MOMENT-Y MOMENT-Z |
| |
| VALUE 73.8 13.2 0.0 0.0 62.9 |
| LOCATION 0.0 0.0 0.0 0.0 6.3 |
| LOADING 110 103 0 0 102 |
| |
|**************************************************************************|
|* *|
|* DESIGN SUMMARY (KNS-METRE) *|
|* -------------- *|
|* *|
|* RESULT/ CRITICAL COND/ RATIO/ LOADING/ *|
| FX MY MZ LOCATION |
| ====================================================== |
| PASS AISC- H1-1 0.808 110 |
| 72.00 C 0.00 52.63 6.30 |
|* *|
|**************************************************************************|
| |
|--------------------------------------------------------------------------|
DESIGN SHEET Page 27 of 57
Job No. E-1152 Building No. 1 Rev. No. 00 01
Customer M/S RURAL AREAS ELECTRICITY COMPANY Date 21-05-09 15-06-09
Description Designed By NIB NIB
Checked By
|--------------------------------------------------------------------------|
| Y PROPERTIES |
|************* | IN CMS UNIT |
| * |=============================| ===|=== ------------ |
|MEMBER 2 * | AISC SECTIONS | | AX = 37.90 |
| * | TAP ERED | | --Z AY = 15.52 |
|DESIGN CODE * | | | AZ = 14.02 |
| AISC-1989 * =============================== ===|=== SY = 61.29 |
| * SZ = 446.98 |
| * |<---LENGTH (M)= 5.86 --->| RY = 3.76 |
|************* RZ = 14.37 |
| |
| 70.8 (KNS-METRE) |
|PARAMETER | L102STRESSES |
|IN KNS CMS | IN NEWTON MMS|
|--------------- + -------------|
| KL/R-Y= 79.75 | L102 FA = 165.00 |
| KL/R-Z= 42.46 + fa = 1.95 |
| UNL = 150.00 | L115 FCZ = 166.59 |
| CB = 1.00 + L115 FTZ = 166.59 |
| CMY = 0.85 |L10L101L101 FCY = 168.99 |
| CMZ = 0.85 + L101 L115 FTY = 168.99 |
| FYLD = 27.50 | L101L103 fbz = 158.45 |
| NSF = 1.00 +---+---+---+---+---+---+---+---+---+---| fby = 0.00 |
| DFF = 0.00 29.8 Fey = 165.97 |
| dff= 0.00 ABSOLUTE MZ ENVELOPE Fez = 585.51 |
| (WITH LOAD NO.) FV = 97.85 |
| fv = 15.53 |
| |
| MAX FORCE/ MOMENT SUMMARY (KNS-METRE) |
| ------------------------- |
| |
| AXIAL SHEAR-Y SHEAR-Z MOMENT-Y MOMENT-Z |
| |
| VALUE -17.5 27.0 0.0 0.0 70.8 |
| LOCATION 0.0 5.9 0.0 0.0 5.9 |
| LOADING 105 101 0 0 102 |
| |
|**************************************************************************|
|* *|
|* DESIGN SUMMARY (KNS-METRE) *|
|* -------------- *|
|* *|
|* RESULT/ CRITICAL COND/ RATIO/ LOADING/ *|
| FX MY MZ LOCATION |
| ====================================================== |
| PASS AISC- H2-1 0.963 102 |
| 7.41 T 0.00 -70.82 5.86 |
|* *|
|**************************************************************************|
| |
|--------------------------------------------------------------------------|
DESIGN SHEET Page 28 of 57
Job No. E-1152 Building No. 1 Rev. No. 00 01
Customer M/S RURAL AREAS ELECTRICITY COMPANY Date 21-05-09 15-06-09
Description Designed By NIB NIB
Checked By
|--------------------------------------------------------------------------|
| Y PROPERTIES |
|************* | IN CMS UNIT |
| * |=============================| ===|=== ------------ |
|MEMBER 3 * | AISC SECTIONS | | AX = 37.90 |
| * | TAP ERED | | --Z AY = 15.52 |
|DESIGN CODE * | | | AZ = 14.02 |
| AISC-1989 * =============================== ===|=== SY = 61.29 |
| * SZ = 446.98 |
| * |<---LENGTH (M)= 5.86 --->| RY = 3.76 |
|************* RZ = 14.37 |
| |
| 70.8 (KNS-METRE) |
|PARAMETER | L103STRESSES |
|IN KNS CMS | IN NEWTON MMS|
|--------------- + -------------|
| KL/R-Y= 79.75 | L103 FA = 165.00 |
| KL/R-Z= 42.46 + fa = 1.95 |
| UNL = 150.00 | L120 FCZ = 166.59 |
| CB = 1.00 + L120 FTZ = 166.59 |
| CMY = 0.85 |L10L101L101 FCY = 168.99 |
| CMZ = 0.85 + L101 L120 FTY = 168.99 |
| FYLD = 27.50 | L101L102 fbz = 158.45 |
| NSF = 1.00 +---+---+---+---+---+---+---+---+---+---| fby = 0.00 |
| DFF = 0.00 29.8 Fey = 165.97 |
| dff= 0.00 ABSOLUTE MZ ENVELOPE Fez = 585.51 |
| (WITH LOAD NO.) FV = 97.85 |
| fv = 15.53 |
| |
| MAX FORCE/ MOMENT SUMMARY (KNS-METRE) |
| ------------------------- |
| |
| AXIAL SHEAR-Y SHEAR-Z MOMENT-Y MOMENT-Z |
| |
| VALUE -17.5 27.0 0.0 0.0 70.8 |
| LOCATION 0.0 5.9 0.0 0.0 5.9 |
| LOADING 104 101 0 0 103 |
| |
|**************************************************************************|
|* *|
|* DESIGN SUMMARY (KNS-METRE) *|
|* -------------- *|
|* *|
|* RESULT/ CRITICAL COND/ RATIO/ LOADING/ *|
| FX MY MZ LOCATION |
| ====================================================== |
| PASS AISC- H2-1 0.963 103 |
| 7.41 T 0.00 -70.82 5.86 |
|* *|
|**************************************************************************|
| |
|--------------------------------------------------------------------------|
DESIGN SHEET Page 29 of 57
Job No. E-1152 Building No. 1 Rev. No. 00 01
Customer M/S RURAL AREAS ELECTRICITY COMPANY Date 21-05-09 15-06-09
Description Designed By NIB NIB
Checked By
|--------------------------------------------------------------------------|
| Y PROPERTIES |
|************* | IN CMS UNIT |
| * |=============================| ===|=== ------------ |
|MEMBER 4 * | AISC SECTIONS | | AX = 40.40 |
| * | TAP ERED | | --Z AY = 17.59 |
|DESIGN CODE * | | | AZ = 14.02 |
| AISC-1989 * =============================== ===|=== SY = 61.30 |
| * SZ = 529.22 |
| * |<---LENGTH (M)= 6.30 --->| RY = 3.83 |
|************* RZ = 13.44 |
| |
| 62.9 (KNS-METRE) |
|PARAMETER | L103STRESSES |
|IN KNS CMS | L103L103 IN NEWTON MMS|
|--------------- + L103L103 -------------|
| KL/R-Y= 39.21 | FA = 90.96 |
| KL/R-Z= 98.21 + L103 fa = 17.82 |
| UNL = 150.00 | L103 FCZ = 165.00 |
| CB = 1.00 + L103 FTZ = 165.00 |
| CMY = 0.85 | L103 FCY = 168.99 |
| CMZ = 0.85 + L103 FTY = 168.99 |
| FYLD = 27.50 |L0 fbz = 99.46 |
| NSF = 1.00 +---+---+---+---+---+---+---+---+---+---| fby = 0.00 |
| DFF = 0.00 -3.5 Fey = 686.48 |
| dff= 0.00 ABSOLUTE MZ ENVELOPE Fez = 109.44 |
| (WITH LOAD NO.) FV = 85.24 |
| fv = 4.76 |
| |
| MAX FORCE/ MOMENT SUMMARY (KNS-METRE) |
| ------------------------- |
| |
| AXIAL SHEAR-Y SHEAR-Z MOMENT-Y MOMENT-Z |
| |
| VALUE 73.8 13.2 0.0 0.0 62.9 |
| LOCATION 0.0 0.0 0.0 0.0 6.3 |
| LOADING 113 102 0 0 103 |
| |
|**************************************************************************|
|* *|
|* DESIGN SUMMARY (KNS-METRE) *|
|* -------------- *|
|* *|
|* RESULT/ CRITICAL COND/ RATIO/ LOADING/ *|
| FX MY MZ LOCATION |
| ====================================================== |
| PASS AISC- H1-1 0.808 113 |
| 72.00 C 0.00 52.63 6.30 |
|* *|
|**************************************************************************|
| |
|--------------------------------------------------------------------------|
DESIGN SHEET Page 30 of 57
Job No. E-1152 Building No. 1 Rev. No. 00 01
Customer M/S RURAL AREAS ELECTRICITY COMPANY Date 21-05-09 15-06-09
Description Designed By NIB NIB
Checked By
|--------------------------------------------------------------------------|
| Y PROPERTIES |
|************* | IN CMS UNIT |
| * |=============================| ===|=== ------------ |
|MEMBER 5 * | AISC SECTIONS | | AX = 40.40 |
| * | TAP ERED | | --Z AY = 17.59 |
|DESIGN CODE * | | | AZ = 14.02 |
| AISC-1989 * =============================== ===|=== SY = 61.30 |
| * SZ = 529.22 |
| * |<---LENGTH (M)= 2.15 --->| RY = 3.64 |
|************* RZ = 16.19 |
| |
| 75.8 (KNS-METRE) |
|PARAMETER | L102STRESSES |
|IN KNS CMS | L102 IN NEWTON MMS|
|--------------- + L102 -------------|
| KL/R-Y= 41.17 | L102 FA = 165.00 |
| KL/R-Z= 81.55 + L102 fa = 6.13 |
| UNL = 150.00 | FCZ = 165.00 |
| CB = 1.00 + FTZ = 165.00 |
| CMY = 0.85 | L102 FCY = 168.99 |
| CMZ = 0.85 + L102 FTY = 168.99 |
| FYLD = 27.50 |L11L115L115L115 fbz = 143.18 |
| NSF = 1.00 +---+---+---+---+---+---+---+---+---+---| fby = 0.00 |
| DFF = 0.00 67.7 Fey = 622.85 |
| dff= 0.00 ABSOLUTE MZ ENVELOPE Fez = 158.72 |
| (WITH LOAD NO.) FV = 85.24 |
| fv = 2.76 |
| |
| MAX FORCE/ MOMENT SUMMARY (KNS-METRE) |
| ------------------------- |
| |
| AXIAL SHEAR-Y SHEAR-Z MOMENT-Y MOMENT-Z |
| |
| VALUE 28.4 15.7 0.0 0.0 75.8 |
| LOCATION 0.0 2.2 0.0 0.0 2.2 |
| LOADING 101 105 0 0 102 |
| |
|**************************************************************************|
|* *|
|* DESIGN SUMMARY (KNS-METRE) *|
|* -------------- *|
|* *|
|* RESULT/ CRITICAL COND/ RATIO/ LOADING/ *|
| FX MY MZ LOCATION |
| ====================================================== |
| PASS AISC- H2-1 0.905 102 |
| 24.75 T 0.00 -75.77 2.15 |
|* *|
|**************************************************************************|
| |
|--------------------------------------------------------------------------|
DESIGN SHEET Page 31 of 57
Job No. E-1152 Building No. 1 Rev. No. 00 01
Customer M/S RURAL AREAS ELECTRICITY COMPANY Date 21-05-09 15-06-09
Description Designed By NIB NIB
Checked By
|--------------------------------------------------------------------------|
| Y PROPERTIES |
|************* | IN CMS UNIT |
| * |=============================| ===|=== ------------ |
|MEMBER 6 * | AISC SECTIONS | | AX = 40.40 |
| * | TAP ERED | | --Z AY = 17.59 |
|DESIGN CODE * | | | AZ = 14.02 |
| AISC-1989 * =============================== ===|=== SY = 61.30 |
| * SZ = 529.22 |
| * |<---LENGTH (M)= 2.15 --->| RY = 3.64 |
|************* RZ = 16.19 |
| |
| 75.8 (KNS-METRE) |
|PARAMETER | L103STRESSES |
|IN KNS CMS | L103 IN NEWTON MMS|
|--------------- + L103 -------------|
| KL/R-Y= 41.17 | L103 FA = 165.00 |
| KL/R-Z= 81.55 + L103 fa = 6.13 |
| UNL = 150.00 | FCZ = 165.00 |
| CB = 1.00 + FTZ = 165.00 |
| CMY = 0.85 | L103 FCY = 168.99 |
| CMZ = 0.85 + L103 FTY = 168.99 |
| FYLD = 27.50 |L12L120L120L120 fbz = 143.18 |
| NSF = 1.00 +---+---+---+---+---+---+---+---+---+---| fby = 0.00 |
| DFF = 0.00 67.7 Fey = 622.85 |
| dff= 0.00 ABSOLUTE MZ ENVELOPE Fez = 158.72 |
| (WITH LOAD NO.) FV = 85.24 |
| fv = 2.76 |
| |
| MAX FORCE/ MOMENT SUMMARY (KNS-METRE) |
| ------------------------- |
| |
| AXIAL SHEAR-Y SHEAR-Z MOMENT-Y MOMENT-Z |
| |
| VALUE 28.4 15.7 0.0 0.0 75.8 |
| LOCATION 0.0 2.2 0.0 0.0 2.2 |
| LOADING 101 104 0 0 103 |
| |
|**************************************************************************|
|* *|
|* DESIGN SUMMARY (KNS-METRE) *|
|* -------------- *|
|* *|
|* RESULT/ CRITICAL COND/ RATIO/ LOADING/ *|
| FX MY MZ LOCATION |
| ====================================================== |
| PASS AISC- H2-1 0.905 103 |
| 24.75 T 0.00 75.77 2.15 |
|* *|
|**************************************************************************|
| |
|--------------------------------------------------------------------------|
DESIGN SHEET Page 32 of 57
Job No. E-1152 Building No. 1 Rev. No. 00 01
Customer M/S RURAL AREAS ELECTRICITY COMPANY Date 21-05-09 15-06-09
Description Designed By NIB NIB
Checked By
|--------------------------------------------------------------------------|
| Y PROPERTIES |
|************* | IN CMS UNIT |
| * |=============================| ===|=== ------------ |
|MEMBER 7 * | BRITISH SECTIONS | | AX = 51.30 |
| * | ST UB305X165X40 | | --Z AY = 16.63 |
|DESIGN CODE * | | | AZ = 22.48 |
| AISC-1989 * =============================== ===|=== SY = 92.61 |
| * SZ = 560.51 |
| * |<---LENGTH (M)= 0.75 --->| RY = 3.86 |
|************* RZ = 12.87 |
| |
| 45.9 (KNS-METRE) |
|PARAMETER |L110 STRESSES |
|IN KNS CMS | L110 IN NEWTON MMS|
|--------------- + L110L110 -------------|
| KL/R-Y= 19.43 | L110 FA = 151.06 |
| KL/R-Z= 5.83 + fa = 0.88 |
| UNL = 75.00 | L110L110 FCZ = 181.50 |
| CB = 1.00 + FTZ = 181.50 |
| CMY = 0.85 | L110 FCY = 206.25 |
| CMZ = 0.85 + L110L110 FTY = 206.25 |
| FYLD = 27.50 | L0 fbz = 81.82 |
| NSF = 1.00 +---+---+---+---+---+---+---+---+---+---| fby = 0.00 |
| DFF = 0.00 -2.5 Fey =2794.86 |
| dff= 0.00 ABSOLUTE MZ ENVELOPE Fez=0.3111E+5|
| (WITH LOAD NO.) FV = 110.00 |
| fv = 36.86 |
| |
| MAX FORCE/ MOMENT SUMMARY (KNS-METRE) |
| ------------------------- |
| |
| AXIAL SHEAR-Y SHEAR-Z MOMENT-Y MOMENT-Z |
| |
| VALUE 4.5 61.3 0.0 0.0 45.9 |
| LOCATION 0.0 0.0 0.0 0.0 0.0 |
| LOADING 110 110 0 0 110 |
| |
|**************************************************************************|
|* *|
|* DESIGN SUMMARY (KNS-METRE) *|
|* -------------- *|
|* *|
|* RESULT/ CRITICAL COND/ RATIO/ LOADING/ *|
| FX MY MZ LOCATION |
| ====================================================== |
| PASS AISC- H1-3 0.457 110 |
| 4.50 C 0.00 45.86 0.00 |
|* *|
|**************************************************************************|
| |
|--------------------------------------------------------------------------|
DESIGN SHEET Page 33 of 57
Job No. E-1152 Building No. 1 Rev. No. 00 01
Customer M/S RURAL AREAS ELECTRICITY COMPANY Date 21-05-09 15-06-09
Description Designed By NIB NIB
Checked By
|--------------------------------------------------------------------------|
| Y PROPERTIES |
|************* | IN CMS UNIT |
| * |=============================| ===|=== ------------ |
|MEMBER 8 * | BRITISH SECTIONS | | AX = 51.30 |
| * | ST UB305X165X40 | | --Z AY = 16.63 |
|DESIGN CODE * | | | AZ = 22.48 |
| AISC-1989 * =============================== ===|=== SY = 92.61 |
| * SZ = 560.51 |
| * |<---LENGTH (M)= 0.75 --->| RY = 3.86 |
|************* RZ = 12.87 |
| |
| 45.9 (KNS-METRE) |
|PARAMETER |L112 STRESSES |
|IN KNS CMS | L112 IN NEWTON MMS|
|--------------- + L112L112 -------------|
| KL/R-Y= 19.43 | L112 FA = 151.06 |
| KL/R-Z= 5.83 + fa = 0.88 |
| UNL = 75.00 | L112L112 FCZ = 181.50 |
| CB = 1.00 + FTZ = 181.50 |
| CMY = 0.85 | L112 FCY = 206.25 |
| CMZ = 0.85 + L112L112 FTY = 206.25 |
| FYLD = 27.50 | L0 fbz = 81.82 |
| NSF = 1.00 +---+---+---+---+---+---+---+---+---+---| fby = 0.00 |
| DFF = 0.00 -2.5 Fey =2794.86 |
| dff= 0.00 ABSOLUTE MZ ENVELOPE Fez=0.3111E+5|
| (WITH LOAD NO.) FV = 110.00 |
| fv = 36.86 |
| |
| MAX FORCE/ MOMENT SUMMARY (KNS-METRE) |
| ------------------------- |
| |
| AXIAL SHEAR-Y SHEAR-Z MOMENT-Y MOMENT-Z |
| |
| VALUE -4.5 61.3 0.0 0.0 45.9 |
| LOCATION 0.0 0.0 0.0 0.0 0.0 |
| LOADING 110 112 0 0 112 |
| |
|**************************************************************************|
|* *|
|* DESIGN SUMMARY (KNS-METRE) *|
|* -------------- *|
|* *|
|* RESULT/ CRITICAL COND/ RATIO/ LOADING/ *|
| FX MY MZ LOCATION |
| ====================================================== |
| PASS AISC- H1-3 0.457 113 |
| 4.50 C 0.00 45.86 0.00 |
|* *|
|**************************************************************************|
| |
|--------------------------------------------------------------------------|
DESIGN SHEET Page 34 of 57
Job No. E-1152 Building No. 1 Rev. No. 00 01
Customer M/S RURAL AREAS ELECTRICITY COMPANY Date 21-05-09 15-06-09
Description Designed By NIB NIB
Checked By
220. FINISH
DESIGN SHEET Page 51 of 57
Job No. E-1152 Building No. 1 Rev. No. 00 01
Customer M/S RURAL AREAS ELECTRICITY COMPANY Date 21-05-09 15-06-09
Description Designed By NIB NIB
Checked By
Bracing design
Bracing Design:
Area of Longitudinal load : 8.7x0.5x12x0.5 = 26.1 sqm
Wind force acting on eave : 26.10 x 0.9 = 24 kN
16 dia rod capacity = 0.7 x 275 x .785 x 16 x 16 = 38.6 kN
Considering 2 braced bays, force in one braced bay = 24/2 =12 kN
Force due to crane longitudinal kick = 5 kN
Max. force acting in rod = (17/5.8) x 9.09 = 27 kN < 38.6 kN
Hence use 16 dia rod bracing for roof & wall.
DESIGN SHEET Page 52 of 57
Job No. E-1152 Building No. 1 Rev. No. 00 01
Customer M/S RURAL AREAS ELECTRICITY COMPANY Date 21-05-09 15-06-09
Description Designed By NIB NIB
Checked By
1. STAAD PLANE
INPUT FILE: EWC-6WIDE8m.STD
2. START JOB INFORMATION
3. ENGINEER NAME NIB
4. JOB NAME NEW POWER STATION AT DHOFAR
5. JOB CLIENT M/S BEST CHOICE
6. JOB NO E-11
7. JOB REV 0
8. ENGINEER DATE 30-APR-09
9. END JOB INFORMATION
10. INPUT WIDTH 79
11. UNIT METER KN
12. JOINT COORDINATES
13. 1 0 0 0; 2 0 8.4 0
14. MEMBER INCIDENCES
15. 1 1 2
16. DEFINE MATERIAL START
17. ISOTROPIC STEEL
18. E 2.05E+008
19. POISSON 0.3
20. DENSITY 76.8195
21. ALPHA 1.2E-005
22. DAMP 0.03
23. END DEFINE MATERIAL
24. CONSTANTS
25. MATERIAL STEEL ALL
26. SUPPORTS
27. 1 PINNED
28. 2 FIXED BUT FY FZ MX MY MZ
29. MEMBER PROPERTY BRITISH
30. 1 TABLE ST UB203X133X25
31. *LOADING-------------------- -
32. LOAD 1 DL
33. SELFWEIGHT Y -1
34. LOAD 2 LOADTYPE WIND TITLE WL
35. MEMBER LOAD
36. 1 UNI GX 4.5
37. *----------------------------------------------------- -
38. *LOAD COMBINATION STARTS
39. *----------------------------------------------------- -
40. LOAD COMB 100 COMBINATION LOAD CASE D+L+CL
DESIGN SHEET Page 53 of 57
Job No. E-1152 Building No. 1 Rev. No. 00 01
Customer M/S RURAL AREAS ELECTRICITY COMPANY Date 21-05-09 15-06-09
Description Designed By NIB NIB
Checked By
P R O B L E M S T A T I S T I C S
-----------------------------------
NUMBER OF JOINTS/MEMBER+ELEMENTS/SUPPORTS = 2/ 1/ 2
ORIGINAL/FINAL BAND-WIDTH= 1/ 1/ 3 DOF
TOTAL PRIMARY LOAD CASES = 2, TOTAL DEGREES OF FREEDOM = 3
SIZE OF STIFFNESS MATRIX = 0 DOUBLE KILO-WORDS
REQRD/AVAIL. DISK SPACE = 12.0/ 32535.4 MB
45. PARAMETER 1
46. CODE AISC
47. UNL 3 ALL
48. LY 3 ALL
49. LZ 8.3 ALL
50. MAIN 0 ALL
51. TRACK 2 ALL
52. BEAM 1 ALL
53. LOAD LIST 100
54. CHECK CODE ALL
DESIGN SHEET Page 55 of 57
Job No. E-1152 Building No. 1 Rev. No. 00 01
Customer M/S RURAL AREAS ELECTRICITY COMPANY Date 21-05-09 15-06-09
Description Designed By NIB NIB
Checked By
STEEL DESIGN
STAAD.PRO CODE CHECKING - (AISC 9TH EDITION)
********************************************
|--------------------------------------------------------------------------|
| Y PROPERTIES |
|************* | IN CMS UNIT |
| * |=============================| ===|=== ------------ |
|MEMBER 1 * | BRITISH SECTIONS | | AX = 32.00 |
| * | ST UB203X133X25 | | --Z AY = 10.54 |
|DESIGN CODE * | | | AZ = 13.91 |
| AISC-1989 * =============================== ===|=== SY = 46.25 |
| * SZ = 230.31 |
| * |<---LENGTH (M)= 8.40 --->| RY = 3.10 |
|************* RZ = 8.55 |
| |
| 29.8 (KNS-METRE) |
|PARAMETER | L100L100L100 STRESSES |
|IN KNS CMS | IN NEWTON MMS|
|--------------- + L100 L100 -------------|
| KL/R-Y= 96.70 | FA = 93.05 |
| KL/R-Z= 97.06 + L100 L100 fa = 0.24 |
| UNL = 300.00 | FCZ = 141.01 |
| CB = 1.00 + L100 L100 FTZ = 148.93 |
| CMY = 0.85 | FCY = 186.16 |
| CMZ = 0.85 + FTY = 186.16 |
| FYLD = 24.82 |L0 L0 fbz = 129.25 |
| NSF = 1.00 +---+---+---+---+---+---+---+---+---+---| fby = 0.00 |
| DFF = 0.00 -1.7 Fey = 112.89 |
| dff= 0.00 ABSOLUTE MZ ENVELOPE Fez = 112.05 |
| (WITH LOAD NO.) FV = 99.28 |
| fv = 0.00 |
| |
| MAX FORCE/ MOMENT SUMMARY (KNS-METRE) |
| ------------------------- |
| |
| AXIAL SHEAR-Y SHEAR-Z MOMENT-Y MOMENT-Z |
| |
| VALUE 1.5 14.2 0.0 0.0 29.8 |
| LOCATION 0.0 0.0 0.0 0.0 4.2 |
| LOADING 100 100 0 0 100 |
| |
|**************************************************************************|
|* *|
|* DESIGN SUMMARY (KNS-METRE) *|
|* -------------- *|
|* *|
|* RESULT/ CRITICAL COND/ RATIO/ LOADING/ *|
| FX MY MZ LOCATION |
| ====================================================== |
| PASS AISC- H1-3 0.919 100 |
| 0.77 C 0.00 -29.77 4.20 |
|* *|
|**************************************************************************|
| |
|--------------------------------------------------------------------------|
DESIGN SHEET Page 56 of 57
Job No. E-1152 Building No. 1 Rev. No. 00 01
Customer M/S RURAL AREAS ELECTRICITY COMPANY Date 21-05-09 15-06-09
Description Designed By NIB NIB
Checked By
56. FINISH
DESIGN SHEET Page 57 of 57
Job No. E-1152 Building No. 1 Rev. No. 00 01
Customer M/S RURAL AREAS ELECTRICITY COMPANY Date 21-05-09 15-06-09
Description Designed By NIB NIB
Checked By
Connection design
JOB No. A-18-09 Rev. No. 0
DQ.No. Date 20-May-09
CLIENT M/S RGO Designed By NIB
DESCRIPTION BP Checked By
2
Bond Stress For M20 grade Cocrete : 0.80 N/mm
2
Area of Base Plate (A) : 288x400 = 115200 mm
2
Pressure over the concrete pedestal (Fy(DL+LL) /A) : 0.64 N/mm
2
Allowable pressure below the base plate : 6.0 N/mm