Construction Project
Scope Management
SAFETY AND
RISK
MANAGEMENT
CONSTRUCTION
INDUSTRY
FINANCIAL
MANAGEMENT
SCOPE
MANAGEMENT
CONSTRUCTION
PROJECT
MANAGEMENT
TIME
MANAGEMENT
COST
MANAGEMENT
HUMAN
RESOURCES
MANAGEMENT
QUALITY
MANAGEMENT
SCOPE
NEED
REQUIREMENTS
PHASE
SCOPE
DEFINITION
PHASE
Scope Statement
The scope statement should include broad
description of what is to be covered in the
works.
The format and its presentation should be
such that is should be a clear
communication between the various players
of the extent and nature of the project.
Scope Statement
Statement of Work
A brief description of overall scope.
It should specify the type of facility its units and
subunits and the intended functionality they are
expected to deliver.
Organization of Work
An outline of how the items specified in the statement
of work are to be carried out.
It should also state whether the project is to
conventionally built or fast track.
Scope Statement
Statement of Work
SCOPE OF WORK
Scope Statement
Requirements of Work
Requirements of work scan over the basic feasibility
of the project units and subunits.
The requirements should be properly and clearly
specified in the scope statement.
The requirement include the overview of the basic
financial, physical and regulatory constraints.
Overall Objectives
An outline of how the items specified in the statement
of work are to be carried out.
It should also state whether the project is to
conventionally built or fast track.
Scope Statement
Critical objective
Critical objectives are the minimum desired
functionality expected from the project. The
fulfillment and approval of these determines whether
the project will move ahead or be abandoned.
Control Philosophy
The type of organization control systems and the
policy should be specified
Performance Specifications
The performance specifications of the equipment to e
used is to be specified
Scope Statement
Repair and maintenance standard
Apart from the functionality the equality which the
project is to deliver should also be specified by
specifying the repairs and maintenance standards..
Contingency Policy
The scope statement should include a contingency
policty. This policy should be comprehnsive policty in
the start including in it the policy for allownances and
management reserves.
WORK
BREAKDOWN
STRUCTURE (WBS)
PHASE
Statement of work
Organization of work
Requirement of work
Objectives
Basic Architectural Plans