Inspection and Test Plan Steel Structure: 1. Document Review

This document outlines the inspection and test plan for a steel structure project. It details the quality control activities, acceptance criteria, and responsible parties for inspection of document review, structural steel work, welding, painting work, and final inspection/punch listing. Key activities include verifying materials and specifications, checking bolt tightness and alignment, visual welding and surface preparation inspections, measuring dry film thickness, and reviewing handover documentation for conformance. Responsible parties will review, approve, and inform on inspection activities and documentation.

Uploaded by

MikiRoniWijaya
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
100% found this document useful (2 votes)
2K views

Inspection and Test Plan Steel Structure: 1. Document Review

This document outlines the inspection and test plan for a steel structure project. It details the quality control activities, acceptance criteria, and responsible parties for inspection of document review, structural steel work, welding, painting work, and final inspection/punch listing. Key activities include verifying materials and specifications, checking bolt tightness and alignment, visual welding and surface preparation inspections, measuring dry film thickness, and reviewing handover documentation for conformance. Responsible parties will review, approve, and inform on inspection activities and documentation.

Uploaded by

MikiRoniWijaya
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 2

INSPECTION AND TEST PLAN STEEL

STRUCTURE

"R" = REVIEW AND COMMENT


QUALITY
ACTIVITY/PROCESS DESCRIPTION
CONTROL
ACTIVITY

DISCIPLINE
ITP N

"A" = APPROVAL DOCUMENT

1.

ALL

PP-0512-GN-GG-004-0

"I" = INFORMATION

INSPECTION ACTIVITIES

QUALITY CONTROL
PROCEDURE REFERENCE

ACCEPTANCE CRITERIA

VERIFYING DOCUMENT

Verify

Contract Document

Contract Document

Verify

Standard & Code

Verify

TJE

CPI

OTHERS

Contract Documents

N/A

Procedure and vendor


manual

Contract Documents

R/A

N/A

Technical Specification &


Proc., Contract Documents

Approval sheet

Contract Documents

R/A

N/A

Verify

Technical Specification &


Proc., Contract Documents

A36 or eq

IR-009

N/A

DOCUMENT REVIEW

1.1.

Contract Documents, Tech. Specification, Procedures Review

1.2.

Review Client's or Owners approved technical specification, project


procedures,
vendor manual, drawings or other documents as the reference to
be followed

1.3.

Finalise deviation, amendments or queries and generate new


procedure as required

2.

STRUCTURAL STEEL WORK

2.1.

Material verification; visual

2.2.

Anchor bolt alignment / center line verification

Visual Inspection

Technical Specification &


Proc., Contract Documents

AISC-ASD

IR-009

SW

N/A

2.3.

Padding plate elevation check

Visual Inspection

Technical Specification &


Proc., Contract Documents

AISC-ASD

IR-009

SW

N/A

2.4.

Alignment check / Verticality

Visual Inspection

Technical Specification &


Proc., Contract Documents

SP-CI-SS-001

IR-009

SW

N/A

2.5.

Bolt Tightening check

Visual Inspection

Technical Specification &


Proc., Contract Documents

AISC-ASD

IR-009

SW

N/A

2.6.

Grouting ( Follow ITP Grouting)

Visual Inspection

Technical Specification &


Proc., Contract Documents

AWS D1.1

IR-009

SW

N/A

3.

3.1.

WELDING ACTIVITY

Welding Visual inspection

INSPECTION AND TEST PLAN STEEL


STRUCTURE

"R" = REVIEW AND COMMENT


QUALITY
ACTIVITY/PROCESS DESCRIPTION
CONTROL
ACTIVITY

DISCIPLINE
ITP N

"A" = APPROVAL DOCUMENT

4.

ALL

PP-0512-GN-GG-004-0

"I" = INFORMATION
QUALITY CONTROL
PROCEDURE REFERENCE

INSPECTION ACTIVITIES

ACCEPTANCE CRITERIA

VERIFYING DOCUMENT

TJE

CPI

OTHERS

PAINTING WORK

4.1.

Surface preparation ( check surface material )

Visual Inspection

Project Specification, Vendor


Manual

Project Specification SP-MEME-025, SSPC

IR-006

SW

N/A

4.2.

Check DFT and visual appearance

Visual Inspection

Project Specification SP-MEME-025, Vendor Manual

Primer, second and finish


coat

IR-006

SW

N/A

Visual Inspection

Technical Specification &


Proc., Contract Documents

Approved drawing

PL-008

N/A

Verify

Contract Documents
Site Instruction Form Scope of
Work

Approved Documents

Turn-over Documents

P/R

R/A

N/A

TING
5.

FINAL INSPECTION AND PUNCH LISTING

6.

DOCUMENTATION

6.1

QA/QC Review of site generated handover document