Training Report2
Training Report2
Submitted By
Training Period
From 1/06/2016 to 10/06/201
Department Of Electrical
Engineering ,
Vidya Pratisthans
kamal nayan bajaj Institute of
technology
Baramati-413133
2016-2017
ACKNOWLEDGEMENT
Completing a task is never a solo effect.
Date: 1/07/2016
Gesudaraj Rahiman
Place: Osmanabad
to 15/06/2016
Sayyad
Duration: 01/06/2016
INTRODUCTION
Maharashtra state electricity board (MSEB).It has four
different sections,
1.MAHAGENCO
-Generation of electricity
2.MAHATRANSCO
-Transmission of electricity
3.MAHAVITARAN
-Distribution of electricity
ELECTRICAL MINISTERS :
-Testing division
Mr. Inamadar sir ( Executive engineer, testing division
latur)
-Testing sub-division
Mr. Marulakar sir(Add. Executive engineer , testing subdivision osmanabad)
Mr. Parikh sir (Asst. Executive engineer,tesing subdivision
osmanabad)
1st day .
Basic knowledge about ohms law
As long as physical state of the conductor Remain
constant then only current flowing through the conductor
is directly proportional to the voltage across the
conductor.
V=I.R
VI
In other conditions it is inversely proportional
P=VI COS
Cos0=1 , unity power factor,I.e we get maximum power if
angle between V and I is zero .
in this , for max. Power we increase the voltage and
decrease the current
so this case tells Voltage is inversely proportional to the
current.
In distribution of electricity we see the poles of three
wire,four wire,five wire I.e three phase ine neutral and ine
earthing wire.
Neutral is for completing the circuit and earth for pass
excess of voltages in the ground.
For our home we require single phase one phase and one
neutral. All of the three wires each contain 440 volt and
we need V phase= V line/3 ie 230 volt.
V.P.K.B.I.E.T Baramati Page 8
3) Isolator
4) Earthing switch
5) lightning arrestor
6) Busbar
7) Current transformer
8) Potential transformer
9) Protective relay
10) DC battery set
11)Capacitor bank
12)Fire fighting system
Power transformer :
Transformer is used to step down the voltage from 33 kv
voltage to 11kv voltage .
Generally 3.15 MVA, 5 MVA, 10 MVA 33/11kv, / Y
transformer are used in 33/11kv s/s.
We can check the RYB side of transformers for whuch we
have to stand face towards LV side and from neutral give
the name RYB.
Every power transformer has
max.delta to star connection.
Maintenance of Transformers
V.P.K.B.I.E.T Baramati Page 10
TRANSFORMER OIL
Its mineral oil obtained by refine crude petroleum. It
serves the following purpose.
Provide additional insulation.
Carries away the heat generated in the core & coils.
Protects the paper from dirt & moisture.
Current Transformer:
Circuit Breaker
Circuit Breaker can switch automatically
during normal and abnormal conditions .
during faulty condition the fault is sensed by
Ac
Testing of meter =
Why we test the meters?
Because sudden faster calibration of the units is happen
So we can check the faulty meter comparingwith
standard meter 6400 Imp/ KWh.
First connect all meters in a series order to burn one unit
of each meter at start.then connect with standard meter
and then burn one unit each .Which meter has burn more
unit than the standard meter, it is faulty meter.
Like this testing of meter is done.