ITSPMO ProjectRiskPlan v3

This document contains a risk plan with a table listing current open risks and closed/passed risks. The table includes details about each risk such as the risk number, class, date raised, description, probability, impact, rating, response strategy, response plan, owner, and review date. The document also provides a risk rating matrix and definitions for the risk response strategies.

Uploaded by

matteozamolo
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
38 views2 pages

ITSPMO ProjectRiskPlan v3

This document contains a risk plan with a table listing current open risks and closed/passed risks. The table includes details about each risk such as the risk number, class, date raised, description, probability, impact, rating, response strategy, response plan, owner, and review date. The document also provides a risk rating matrix and definitions for the risk response strategies.

Uploaded by

matteozamolo
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 2

<Project Name>

Date:
Project Manager:

Risk Plan
Open / Current Risks
Ri
sk
#

Risk
Class

Date
Raised

Risk Description

Risk
Probabil
ity

Risk
Impact

Risk
Rating

Risk
Respons
e
Strategy

Risk Response Plan

Risk
Owner

Review
Date

Current Status

Risk Description

Risk
Probabil
ity

Risk
Impact

Risk
Rating

Risk
Respons
e
Strategy

Risk Response Plan

Risk
Owner

Review
Date

Current Status

Closed / Passed Risks


Ri
sk
#

Risk
Class

Date
Raised

Internal Use Only

BC | Information Technology Services

Previous
Review
Date

Previous
Review
Date

Previous Status

Previous Status

Page 1 of 2

Risk Probability

Risk Impact
High

Medium

Low

High

Medium

Low

Column
Header

Description
Accept risk

Risk
Response
Strategy

Risk mitigation plans identify the activities that have been planned to reduce the probability of the occurrence of a
particular risk and/or to minimize the adverse impact of the occurrence of a particular risk.
Risk contingency plans define the strategies, activities, and budget that have been planned for responding to a
particular risk, if and when the risk occurs - including trigger date.
Reserve plans define the management and/or contingency reserves set aside to address risks affecting the projects
costs or schedules.
Additional project reserve plans define the management and contingency reserves set aside to address risks yet
to be identified or to address unexpected costs associated with existing risk response plans.
Insurance plans guarantee coverage of loss due to a risk occurrence should it occur but, at an additional cost to the
project.

Internal Use Only

BC | Information Technology Services

Page 2 of 2

You might also like