Perhitungan Analysis Angkur Bolt-Excel

The document summarizes the calculation of bolt requirements for formwork beams of an H beam on a Middle Cross Beam. It is planned to use 41 bolts with a diameter of 22 mm. Analysis from SAP 2000 obtained loads of 58053 kg and 156648.4 kgm. Checks were performed for shear strength and bearing capacity according to standards. The required number of bolts was calculated to be 16 based on the minimum shear strength requirement. It was concluded that the number of bolts meets the load requirement.

Uploaded by

bonnico
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
1K views26 pages

Perhitungan Analysis Angkur Bolt-Excel

The document summarizes the calculation of bolt requirements for formwork beams of an H beam on a Middle Cross Beam. It is planned to use 41 bolts with a diameter of 22 mm. Analysis from SAP 2000 obtained loads of 58053 kg and 156648.4 kgm. Checks were performed for shear strength and bearing capacity according to standards. The required number of bolts was calculated to be 16 based on the minimum shear strength requirement. It was concluded that the number of bolts meets the load requirement.

Uploaded by

bonnico
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 26

Perhitungan jumlah kebutuhan baut angkur untuk bekisting H beam pada Middle Cross Beam

Direncanakan :
Baut BJ =
41
dari analisa SAP 2000, dida
2
fu =
4100 kg/cm
Pu
2
fy =
2500 kg/cm
Mmax
Plat BJ =
37
t pelat =
20 mm
baut =
25 mm
n baut =
16 bh
KONTROL AKIBAT BEBAN GESER SENTRIS
Vu =
Pu
=
n
fuv =

Vu
Ab

ff=
=

0.75

117368.44
16
7335.528
4.906
0.5
>

1387.5 kg

1. KONTROL KUAT GESER


Vd = f x r x fu x Ab x m
=
0.75
0.5
=
7543.359 kg

4100
(menentukan)

2. KONTROL KUAT TUMPU


Rd = f x 2.4 x db x Tp x fu > Vd
=
0.75
2.4
=
14169.600
kg

1.6
>

7335.528

1495.139363

x
1495.139

3700
kg

.. (SNI 03-1729-2002 Pasal 13.2.2.1)


4.906
1

.. (SNI 03-1729-2002 Pasal 13.2.2.4)


1.2
4100
Vd =
7543.359

Untuk perhitungan, dipakai kontrol kekuatan geser =


Kontrol kuat geser :
Pu =
=
=

Kesimpulan

n
Vd
16
7543.35938
120693.75 kg
>

117368.44 kg

OK

ross Beam
analisa SAP 2000, didapatkan :
=
117368.44 kg
=
62852.64 kgm

kg

kg/cm2

002 Pasal 13.2.2.1)

002 Pasal 13.2.2.4)


kg
7543.35938 kg

dipakai angkur
jumlah =
angkur=

16 bh
25 mm

dipakai pengaku WF 800x350

sambungan las

SAMBUNGAN KUDA-KUDA
Mutu Baja 37
fu =

3700 kg/cm2

fy =

2400 kg/cm2

PROFIL KUDA - KUDA


250
A=
W=
a=
bf =
iy =

250

104.7 cm2
82.2 kg/m
250 mm
255 mm
6.09 cm

x
tf =
Ix =
Iy =
tw =
ix =

14

14 mm
11500 cm4
3880 cm4
14 mm
10.5 cm

Sx =
Sy =
Zx =
Zy =
r=

h=
PROFIL SAMBUNGAN
350
A=
W=
a=
bf =
iy =

250

101.5 kg/cm2
79.7 kg/m
340 mm
250 mm
6 cm

x
tf =
Ix =
Iy =
tw =
ix =

9
14 mm
21700 cm4
3650 cm4
9 mm
14.6 cm

x
Sx =
Sy =
Zx =
Zy =
r=

h=

Mu

Mu

71
12

120,5

Dari Hasil SAP 2000


Pu =
2582
Mu =
3846
Direncanakan :
t pelat =
f baut =
a min =
a maks =
16-1

kg
kgm
12 mm
16 mm
5 mm
=

KONTROL KEKUATAN LAS


a eff maks (Las badan) =
=
=
a eff maks (Las sayap) =

=
1
cm
te x (2 x h + 4 x b)
92.600
cm2
te x (2 x h + 4 x b)
110.600
cm2
203.200
cm2

15

mm

0.707

fu
E70xx
3700
6327
=

0.707
5.788
1.41

Misal te =
Al =
=
Al =
=
A total =

120,5

1.41
11.544

fu
E70xx
3700
6327
=

tw
14
8

mm

tf
14
15

mm

Sx =

d2
3
49284
3

=
=

183486 mm3

255

222

183.486 cm3

fv =

Pu
A

2582
203.2

12.707 kg/cm2

fh =

Mu
Sx

384600
183.486

2096.07272 kg/cm2

f total = (fv2 + fh2) 0.5


=
2096.11
f fn =
=
=
te perlu =

a perlu =

kg/cm2

0.75
0.6
0.75
0.6
2
2847.15 kg/cm
f total
f fn

te perlu
0.707

E70xx
90
>
2096.11
2847.15

70.3
2096.11123944 kg/cm2
=

0.736 cm

1.041 cm

1.4 cm

2582
12

215.167 kg

215.167
2.010

107.069 kg/cm2

0.736
0.707

Sehingga dipakai Las = 1,4 cm


Cek kekuatan Baut
`
Direncanakan :
Baut BJ =
41
fu =
4100 kg/cm2
fy =
2500 kg/cm2
Plat BJ =
37
t pelat =
12 mm
f baut =
16 mm
KONTROL AKIBAT BEBAN GESER SENTRIS
Vu =
Pu
=
n
fuv =

Vu
Ab

ff=
=

0.75
1387.500 kg

1. KONTROL KUAT GESER


Vd = f x r x fu x Ab x m
=
0.75
0.5
=
6179.520 kg

0.5
>

x
107.069

3700
kg

.. (SNI 03-1729-2002 Pasal 13.2.2.1)


4100
2.0096
2
(menetukan)

2. KONTROL KUAT TUMPU


.. (SNI 03-1729-2002 Pasal 13.2.2.4)
Rd = f x 2.4 x db x Tp x fu > Vd
=
0.75
2.4
1.6
1.2
4100
=
14169.600
kg
>
Vd =
6179.520 kg
Untuk perhitungan sambungan dipakai kontrol kekuatan geser =
6179.520
Kekuatan sambungan :
Pu =
n
=
12
=
74154.240 kg
KONTROL TARIK ULIR
Td = f x fy x Ab
=
0.75
=
3768

Vd
6179.520
>

2500
kg

Tu maks = Mu x Tmaks
T2
=
12076440
9650.98
=
1251.317 kg

2582

kg

OK

2.010

<

Td =

3768 kg

OK!!

14
919 cm3
304 cm3
1015 cm3
466 cm3
16 mm
222 mm

14
1280 cm3
292 cm3
1360 cm3
444 cm3
20 mm
312 mm

d2
3
97344
3

>
<
<

250

312

a min =
a maks =
a eff maks =

0.5
1.5
1.5

cm
cm
cm

kg

PERENCANAAN BASE PLATE


KOLOM PENDEK
WF
250
x
2
A =
104.7 cm
W=
82.2 kg/m

250

14

tf =
Ix =

14 mm
11500 cm4

Sx =
Sy =

d =

250 mm

Iy =

3880 cm4

Zx =

bf =
iy =

255 mm

tw =
ix =

14 mm

Zy =

6.09 cm

10.5 cm

r=

h=

fc' kolom beton =


BJ profil 37
fu =
fy =
BJ BAUT 41
fu =
fy =
BJ PELAT 41
fu =
fy =
Diameter Baut =
Beban :

300

kg/cm2

3700 kg/cm2
2400 kg/cm2
4100 kg/cm2
2500 kg/cm2
4100 kg/cm2
2500 kg/cm2
16
Pu =
Mu =
Hu =

mm 5/8"

5641 kg
0 kg
9884 kg

ukuran pelat ditaksir : H > d + h'


h' = (we +c1)
we =
2.223
cm =
c1 =
2.540
cm =
h' =
4.7625
cm =
H =
=
h=

d + 2h'
345.25
323.025

mm =
mm =

22.225
25.400
47.625

mm
mm
mm

34.525
32.3025

cm
cm

B bf + 2 x (kaki las+1/16")

306.175 mm =
b =

306.175

307

mm

0.8

255

B2/B1 =

1.629

2
=
B1 =
B2 =

51.088

mm

307 mm
500 mm

30.7 cm

H1 =
H2 =

345.25 mm
500 mm

h2/h1 =

1.448

(menentukan)

Dipakai yang kecil H2/H1 =


A1 =
105991.75 mm2
A2 =
250000 mm2
A2/A1 =
2.359
< 4
fc" =

A2
A1

fc '

1.448

460.739 kg/cm2

fcn' = 0.85 x fc"


fcn' =
391.628 kg/cm2
Bm =
=

B
307

mm

30.7

cm

Tebal pelat Baja :


arah H :

1,333 fc' n Bm
fy Bm

t h'
t1

0.218

cm

arah B

1,333 fc' n Bm
fy Bm

t h'
b =

B 0,8b
f
2

51.5

mm

t2

2.353

cm

5.15

cm

karena pengharuh Tn
garis netral : a

a h
a=

h2

0.366

Pu 2 h H 2 M u
c f c' n B

h
H
Pu
Mu
fc'n

cm

Cu = c x fcn' x B x a
= 2641.412633 kg
Tu = cu + Pu
= 2641.412633
=
8282.413 kg
Pakai Baut
d=
Td ulir = x 0,75 x Ab x fu

=
=
=
=
=

B =

16

5641

mm

Ab =

2.011

cm

= 4636.990757 kg

Jumlah baut yang dipakai :


n=
8282.413
4636.990757

1.786

pakai =

Badan Baut :
fv =

Hu
=
9884
=
n x Ab
4.021
ft =
1,3 fu
r2 fv
=
5330 3686.92373
2
= 1643.076271 kg/cm
ft = 1643.076271 kg/cm2
Pelat
Td badan = x ft x Ab
= 6182.65434 kg
Td ulir = 4636.99076 kg
Untuk jumlah baut dipakai perhitungan kekuatan ulir baut =
Jadi tetap pakai 3 baut D 16 TIAP SISI
t 2,108

t3 >

0.845

Jadi tebal plat :

2457.94915 kg
ulir tdk pd bid. Geser
r2 =
1.5

4636.99076

Tu h ' we
fy B

cm

t1
t2
t3

Dipakai tebal plat


t =
Jarak antar Baut dipasang sejarak 2,4 db =

0.218 cm
2.353 cm
0.845 cm
2.500 cm
=

2.000

3.84 cm
7.00 cm

14
919 cm3
304 cm3
1015 cm3
466 cm3
16 mm
222 mm

32.303
34.525
5641
0
391.628
30.7

baut

kg

Perhitungan jumlah kebutuhan baut angkur untuk bekisting H beam pada Middle Cross Beam
Direncanakan :
Baut BJ =
41
dari analisa SAP 2000, dida
2
fu =
4100 kg/cm
Pu
2
fy =
2500 kg/cm
Mmax
Plat BJ =
37
t pelat =
32 mm
baut =
22 mm
n baut =
16 bh
KONTROL AKIBAT BEBAN GESER SENTRIS
Vu =
Pu
=
n
fuv =

Vu
Ab

ff=
=

0.75

3628.313

3628.313
3.799

954.9698637

0.5
>

1387.5 kg

1. KONTROL KUAT GESER


Vd = f x r x fu x Ab x m
=
0.75
0.5
=
5841.578 kg

58053
16

4100
(menentukan)

2. KONTROL KUAT TUMPU


Rd = f x 2.4 x db x Tp x fu > Vd
=
0.75
2.4
=
14169.600
kg

1.6
>

x
954.970

3700
kg

.. (SNI 03-1729-2002 Pasal 13.2.2.1)


3.799
1

.. (SNI 03-1729-2002 Pasal 13.2.2.4)


1.2
4100
Vd =
5841.578

Untuk perhitungan, dipakai kontrol kekuatan geser =


Kontrol kuat geser :
Pu =
=
=

Kesimpulan

n
Vd
16
5841.5775
93465.24 kg
>

58053 kg

OK

ross Beam
analisa SAP 2000, didapatkan :
=
58053 kg
=
156648.4 kgm

kg

kg/cm2

002 Pasal 13.2.2.1)

002 Pasal 13.2.2.4)


kg
5841.5775 kg

dipakai angkur
jumlah =
angkur=

16 bh
22 mm

dipakai pengaku WF 600x350