Aconex 2016
Project Configuration
1. Project Information..................................................................................................................... 3
1.1
Project Details..........................................................................................................................................................3
1.2
3.2
3.3
Document Types.......................................................................................................................................................8
3.4
Document Status....................................................................................................................................................11
3.5
Discipline................................................................................................................................................................12
3.6
Stage......................................................................................................................................................................13
3.7
4. Workflow Module...................................................................................................................... 13
5. Mail Module Configuration....................................................................................................... 14
5.1
Mail Types...............................................................................................................................................................14
5.2
6. Project Preferences.................................................................................................................. 16
Related Documents
This document must be read in conjunction with, but not limited to, other project specific manuals, plans
or procedures that are applicable to this project. The table below lists the relevant documents.
Document Reference
Title
Author
XXX-YYY-00-MAN-0002
Custodianship
The ongoing management of this document will reside with the nominated custodian who is Enter
Custodian Name from Client Organisation and will be supported by the Aconex Client Operations team. All
amendments must be submitted to the nominated custodian.
Aconex 2016
Project Configuration
1. Project Information
In this section there are details about the Background of the project.
1.1
Project Details
Client Organisation*
Project Name*
Project Short Name* (max 20
characters)
Project Code* (max 8
characters)
Project Director*
Email*
Key Implementation Contact*
Email*
Phone Number*
Project Start Date*
Estimated Completion Date*
Project Type*
Project Address
Project Address 1*
City/Suburb*
Postcode*
Country*
Phone Number*
Fax Number
Project Description*
Quarza Residence
Quarza Residence @ Melawati
QUA
John Ngi
[email protected]
+6012 2249 765
01/07/2016
31/12/2018
Mixed Use Development
KL East, Setapak
Kuala Lumpur
Malaysia
Aconex 2016
Project Configuration
1.2
Prefix*
Contact Name
Contact Details
Role
SDM
CL
Crest Builder
CBH
John Ngi
MC
Turner International
Malaysia
TIM
Doug Diercksen
PM
SA Architects
SAA
Siti Yusrin
Arup Jururunding
ARP
PCR
Azmizi Mukhlis
BNC
QS
Geoffrey Thomas
Associates
GTA
Geoffrey Thomas
CN
PTA Design
PTA
CN
Integrated
GeoPlanning
IGP
CN
Aconex
ACX
LC
CN
CN
+603-9236 7401
CN
Role
CL
Client
PM
Project Manager
LC
Lead Consultant
CN
Consultant
QS
Quantity Surveyor
MC
Main Contractor
NSC
Nominated Subcontractor
Aconex 2016
Project Configuration
Client
Sime Darby Melawati
Contractors
Quantity Surveyor
B&C
Consultants
Aconex 2016
Project Configuration
2.1
The following table details the standard document register fields recommended by Aconex.
Label
Require
d
Type
Description of use
Text
Yes
Yes
Yes
Yes
Section
2.3
Yes
Section
2.4
(50 chars)
Yes
Section
2.5
Date
Yes
Yes
(1024 chars)
No
Confidential
Check Box
No
File
File
No
(15 chars)
No
Date Modified
Date
n/a
System
Controlled
Review Status
n/a
n/a
System
Controlled
Review Source
n/a
n/a
System
Controlled
Document No
Revision
Title
Type
Status
Discipline
Revision Date
Created By
Comments
Print Size
(50 chars)
Text
(15 chars)
Text
(255 chars)
List, single
(50 chars)
List, single
(40 chars)
List, single
Text
(60 chars)
Text Area
Text
Aconex 2016
Note
Project Configuration
2.2
The following table lists additional document register fields that have been included to suit the specific
information management requirements of this project.
Label
Stage
Building Zone
Submission
Stages
Description of use
List, single
Yes
Yes
No
(50 chars)
List, single
(50 chars)
List, multi
(60 chars)
Text
(120 chars)
Scale
Text
Percent Complete
Text
(60 chars)
Reference
Require
d
Type
Aconex 2016
Note
No
No
No
Project Configuration
2.3
Document Types
The following table indicates the document types available for use on the project. An X indicates that the
project role has been configured with the ability to create that document type in the register.
Type
Code*
Description of use
CL
PM
L
C
QS
CN
MC
NS
C
AGD
Contract Docs
CON
Bill of Quantities
BOQ
Bond
BND
Brief
BRF
Calculation
CAL
Catalogue
CAT
Certificate
CRT
Data Sheet
DST
Delivery Note
DNO
Drawing
DWG
Estimate
EST
ITP
Invoice
INV
List
LST
Our
terms in and
PQP - Materials/Fittings
For the
registration
submission=MFSS
distributionSample
of lists e.g.,
Table of
X
X
Contents, Attendance
Sheets/Records etc.
Manual
MAN
Material
Submittal
MTS
Agenda
Aconex 2016
X
X
X
X
X
8
Project Configuration
Meeting Minutes
Method
Statement
Material/Work
Testing Results
MOM
MST
MWT
R
Organisation
Charts
ORG
Payment
Certificate
PAY
Permit
PER
Photographs,
Images and
Videos
IMG
Policy
PLY
Pre-qualification
PRQ
Presentation
PRN
Proposal
PPS
Report
RPT
Request for
Proposal
RFP
Schedule
SCH
Shop Drawing
SHD
Specification
SPC
Variation Order
VOR
Warranty
WRT
Role
CL
Client
PM
Project Manager
LC
Lead Consultant
QS
Quantity Surveyor
CN
Consultant
MC
Main Contractor
Aconex 2016
Project Configuration
NSC
Nominated Subcontractor
Aconex 2016
10
Project Configuration
2.4
Document Status
The following table indicates document statuses available for use on the project. An X indicates that the
project role has been configured with the ability to create or update a document with that status.
LC
QS
CN
MC
NS
C
Final
For Construction
For Co-ordination
For Design
For Handover
Information Only
Not Started
Preliminary
Status
Description of use
As-Built
CL
PM
Use the following values if workflows are NOT being used otherwise delete them and use Section
2 instead.
2.5
Approved
Approved with
Comments
Revise and
Resubmit
Rejected
Code
Role
CL
Client
PM
Project Manager
LC
Lead Consultant
QS
Quantity Surveyor
CN
Consultant
MC
Main Contractor
NSC
Nominated Subcontractor
Discipline
The project disciplines used on this project are detailed in the following table.
XXX-YYY-00-MAN-0001 Rev.00 Draft
Aconex 2016
11
Project Configuration
Discipline
Code
*
Description of use
00 - Non Specific
00
Architectural
AR
CS
For all Civil design documentation including but not limited to sketches,
reports, drawings, specifications, plans and schedules.
Mechanical &
Electrical
ME
For all Mechanical and Electrical design documentation including but not
limited to sketches, reports, drawings, specifications, plans and schedules.
Quantity Survey
QS
For all documentation associated with Cost Control including but not limited to
reports, recommendations, schedules and BOQs.
Environmental,
Health & Safety
HS
For all Health & Safety documentation including but not limited to reports,
notices, lists, plans, forms and schedules.
Interior Design
ID
Land Survey
SV
For all Land Survey design documentation including but not limited to
sketches, reports, drawings, specifications, plans and schedules.
Landscape
LS
For all Landscape design documentation including but not limited to sketches,
reports, drawings, specifications, plans and schedules.
Other
OT
For all other Specialist Process & design documentation including but not
limited to sketches, reports, drawings, specifications, plans, schedules,
manuals, datasheets & calculations.
Project Management
PM
For all Project Management documentation including but not limited to reports,
plans, forms, procedures, schedules and instructions.
Quality Assurance
QA
For all Quality Assurance and Control documentation including but not limited
to manuals, procedures, forms, notices and reports.
Signage &
Wayfinding
SG
For all Signage & Wayfinding process and documentation but not limited to
sketches, reports, drawings, specifications, plans, schedules, manuals,
datasheets & calculations.
Traffic
TR
For all Traffic design documentation including but not limited to sketches,
reports, drawings, specifications, plans and schedules.
Vertical
Transportation
VT
For all Vertical Transportation design documentation including but not limited
to sketches, reports, drawings, specifications, plans and schedules.
*System requirement used in document numbering (see Information Management Policy document).
Aconex 2016
12
Project Configuration
2.6
Stage (optional)
2.7
Value
00
00 - Non Specific
CD
01 - Concept Design
SD
02 - Schematic Design
DD
03 - Design Development
TD
05 - Tender Documentation
CT
04 - Contract Documentation
CN
06 - Construction Documentation
AB
07 - As Built
The table below indicates the reasons for issue used on this project.
Reason
Role
3. Workflow Module
The following table details the review outcomes (Review Status) being used in workflows for this project.
Review Status
Description of use
Status*
Not Reviewed
Approved
For documents that have been reviewed in accordance with project review
procedures and have been approved.
Reviewed
Approved with
Comments
Reviewed
Reviewed
No Comments
For documents that have been reviewed in accordance with project review
procedures without comment.
Reviewed
In Progress Label
Pending
Review Outcomes
Aconex 2016
13
Project Configuration
4.1
Mail Types
The mail types that an organization can create are detailed in the following table. An X indicates that the
project role has been configured with the ability to create and send that mail type.
Type
Clients
Instruction
PMs Instruction
Code*
Description of use
CI
PMI
Architects
Instruction
AI
Engineers
Instruction
EI
Consultant Advice
Notice
CAN
Design Query
DQ
General
Correspondence
Letter
PM
LC
Q
S
CN
MC
NS
C
X
X
GCOR
LETTER
Request For
Information
RFI
Inspection
Request
INR
Non Conformance
Report
NCR
Response to RFI
RTRFI
Response to NCR
RNCR
Transmittal
CL
TRANSMI
T
X
X
X
X
X
X
Aconex 2016
14
Project Configuration
Cod
e
CL
4.2
Role
Client
PM
Project Manager
LC
Lead Consultant
QS
Quantity Surveyor
CN
Consultant
MC
Main Contractor
NSC
Nominated Subcontractor
Code
Usage / Description
00 - Non Specific
00
Project Wide
PJW
Aconex 2016
15
Project Configuration
5. Project Preferences
This section details the project level preferences for this project.
Preference
Value
Open
No
No
Yes
Yes
Lock project mail auto-numbering scheme across all organizations so only the
project owner can change these settings
Yes
Lock mail and document types across all organizations so only the project owner
can change these settings
Yes
Aconex 2016
16