0% found this document useful (0 votes)
208 views

Overall Equipment Effectiveness: Production Data Calculated Data

This document calculates the overall equipment effectiveness (OEE) of a production process based on collected data. It provides production data including shift length, break times, downtime, ideal run rate, total and rejected pieces produced. It then calculates availability, performance, quality, and overall OEE as 74.79% based on the ratios of operating time to planned production time, actual to ideal production rate, and good pieces to total pieces respectively.

Uploaded by

medi38
Copyright
© © All Rights Reserved
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
208 views

Overall Equipment Effectiveness: Production Data Calculated Data

This document calculates the overall equipment effectiveness (OEE) of a production process based on collected data. It provides production data including shift length, break times, downtime, ideal run rate, total and rejected pieces produced. It then calculates availability, performance, quality, and overall OEE as 74.79% based on the ratios of operating time to planned production time, actual to ideal production rate, and good pieces to total pieces respectively.

Uploaded by

medi38
Copyright
© © All Rights Reserved
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 1

Overall Equipment Effectiveness

Production Data
Shift Length
8
Short Breaks
2
Meal Break
1
Down Time
47
Ideal Run Rate
60
Total Pieces
19271
Reject Pieces
423
Support Variable

Calculation

Planned
Production Time

Shift Length-Breaks

Operating Time

Planned Production Time - Down


Time

Good Pieces

Total Pieces - Rejects Pieces

OEE Factor

Calculated Data
Hours =
480 Minutes
Breaks @
15 Minutes Each =
30
Breaks @
30 Minutes Each =
30
Minutes
PPM ( Pieces per Minute )
Pieces
Pieces
Calculated Data
480

60

420

Minutes

420

47

373

Minutes

19271

423

18848

Pieces

Calculated Data

Calculation

Availability

Operating Time / Planned


Productiion Time

Performance

( Total Pieces / Operating Time ) /


Ideal Run Rate

Quality
OEE

Good Pieces / Total Pieces


Availability*Prformance*Quality

Minutes Total
Minutes Total

373

420

19271
18848
0.8881

/
/
*

373
19271
0.8611

/
=
*

OEE %
0.8881
60

=
0.9780
0.9780
=

= 88.81 %
0.8611 = 86.11 %
= 97.80 %
0.7479 = 74.79 %