Hlaine Tet Hotel Project: Press Pile Record

The document contains details of a piling project for the Hlaine Tet Hotel, including specifications for a ZYJ 260A piling machine weighing 270 tons. It then lists 24 piles driven between July 20th, 2016 and July 22nd, 2026. For each pile, it notes the pile number, size, hammer energy, penetration depth and time taken to install the pile.

Uploaded by

Nwe Oo
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
49 views1 page

Hlaine Tet Hotel Project: Press Pile Record

The document contains details of a piling project for the Hlaine Tet Hotel, including specifications for a ZYJ 260A piling machine weighing 270 tons. It then lists 24 piles driven between July 20th, 2016 and July 22nd, 2026. For each pile, it notes the pile number, size, hammer energy, penetration depth and time taken to install the pile.

Uploaded by

Nwe Oo
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

HLAINE TET HOTEL PROJECT

PRESS PILE RECORD

MACHINE NAME
:ZYJ 260A
DIMENSION(LXBXH)(mm)
:11872x6200x3141
WEIGHT OF E MACHINE
:130 TONS6%
WEIGHT OF WHOLE MACHINE:270 TONS

Date-10.8.2016
Sr; No

Date

Pile No;

Length

Pile Size(mm)
Leader(M)

Last (Mpa)

Last(Ton)

Penetration(M)

Follower(M)

Penetration From
Natural
Ground(M)
Start

Time

Wastage(M)

Remark

Finish

13

20.7.2021

A13

200x200

6+6

14

71.25

16.9

16.9

15:35

16:15

1.1

14

21.7.2016

A14

200x200

6+6+6

13.5

68.71

19.3

19.3

8:40

9:30

4.7

15

21.7.2017

A15

200x200

10

50.89

10.5

10.5

9:35

9:55

1.5

16

21.7.2018

A16

200x200

6+6+6

12.1

61.58

24

24.3

10:10

11:15

17

21.7.2019

A17

200x200

12.5

63.62

10.7

10.7

13:50

14:15

1.3

18

21.7.2020

A18

200x200

6+6

13

66.16

14.3

14.3

14:45

15:20

3.7

19

21.7.2021

A19

200x200

13.5

68.71

11.8

11.8

15:25

15:45

0.2

20

21.7.2022

A20

200x200

12

61.07

12

12

16:15

16:40

21

22.7.2023

A21

200x200

12

61.07

12

12.3

8:40

9:00

22

22.7.2024

A22

200x200

12

61.07

12

12.3

9:10

9:35

23

22.7.2025

A23

200x200

6+6

12.5

63.62

13.3

13.3

9:45

10:30

4.7

24

22.7.2026

A24

200x200

6+6

12.5

63.62

15.6

15.6

10:40

11:20

2.4

.cylinder= 2nos;(2C)
.Side Piling
.cylinder= 2nos;(2C)
.Side Piling
.cylinder= 2nos;(2C)
.Side Piling
.cylinder= 2nos;(2C)
.Side Piling
.cylinder= 2nos;(2C)
.Side Piling
.cylinder= 2nos;(2C)
.Side Piling
.cylinder= 2nos;(2C)
.Side Piling
.cylinder= 2nos;(2C)
.Side Piling
.cylinder= 2nos;(2C)
.Side Piling
.cylinder= 2nos;(2C)
.Side Piling
.cylinder= 2nos;(2C)
.Side Piling
.cylinder= 2nos;(2C)
.Side Piling