0% found this document useful (0 votes)
116 views12 pages

Lube Oil System: Enpro Industries Pvt. LTD

This document is an actual plan for work order 15045D from Enpro Industries Pvt. Ltd. for customer MHI Japan. It outlines 115 activities to be completed with expected start and end dates. So far, all piping activities from tack welding to stress relieving have been 100% completed according to schedule. Remaining activities include gauge board mounting, tubing and cabling layout, hydrotesting, cleaning, painting, reassembly and shipment which are on track to meet the targeted completion date of August 7.

Uploaded by

shadabhaider
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
116 views12 pages

Lube Oil System: Enpro Industries Pvt. LTD

This document is an actual plan for work order 15045D from Enpro Industries Pvt. Ltd. for customer MHI Japan. It outlines 115 activities to be completed with expected start and end dates. So far, all piping activities from tack welding to stress relieving have been 100% completed according to schedule. Remaining activities include gauge board mounting, tubing and cabling layout, hydrotesting, cleaning, painting, reassembly and shipment which are on track to meet the targeted completion date of August 7.

Uploaded by

shadabhaider
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 12

15045D

ACTUAL PLAN
REV.1

PRPN. DATE - 10/02/2016

REV.2

ENPRO INDUSTRIES PVT. LTD.

REV.3

W.O.NO. -15045D

Activity Not Progress

Updated on 2/07/2016

WORK INPROCESS

CUSTOMER- MHI JAPAN

WORKCOMPLETED
HOLIDAY

Sr.No.

Activity

LUBE OIL SYSTEM


CHECK BASEFRAME PRIMER PAINTED

BASE FRAME WATER LEVEL AND LAYOUT MARKING

TANK MOUNTING

FILTER MOUNTING

COOLER MOUNTING

Remark

W/C IN.DIA

ACHIEVED

% Completed

22.5

22.5

100.00

22.5

22.5

100.00

Received on 2/05/16
4

PUMP MOUNTING

PIPING TACKING
5

SK 1 MOP SUCTION PIPING TACKING

SPECTACLE BLIND-/80NB,150# -NA


6

SK. 2 AOP SUCTION PIPING TACKING

SPECTACLE BLIND-/80NB,150# -NA


7

SK. 3 MOP DISCHARGE PIPING TACKING

38.5

38.5

100.00

SK. 4 AOP DISCHARGE PIPING TACKING

32.5

32.5

100.00

SK. 5 AOP,MOP DISCH TO COOLER INLET PIPING TACKING

42

42

100.00

10

SK. 6 TCV INLET PIPNG TACKING

12

12

100.00

11

SK 7 PCV INLET TACKING

50

50

100.00

12

SK. 8 PCV RETURN TO TANK PIPING TACKING

24

24

100.00

13

SK. 9 MOP PSV RETUN TO TANK PIPING TACKING

22

22

100.00

14

SK 10 AOP PSV RETURN TO TANK PIPING TACKING

14

14

100.00

15

SK 11 COOLER OUTLET PIPING TACKING

20

20

100.00

16

SK. 12 TCV INLET AND BYPASS PIPING TACKING

22

22

100.00

17

SK. 13 FILTER INLET PIPING TACKING

64

64

100.00

reducer RECEIVED-17/05/2016
18

SK. 14 TCV OUTLET PIPING TACKING

26

26

100.00

19

SK 15 FILTER OUTLET PIPING TACKING

36

36

100.00

20

SK. 16 ACC INLET PIPING TACKING

34

34

100.00

21

SK 17 PCV TO LUBE OIL OUTLET PIPING TACKING

69

69

100.00

22

SK 18 MOP,AOP HPV RETURN SUPPLY PIPING

100.00

23

SK.19 COOLER DRAIN PIPING TACKING

18

18

100.00

24

SK. 20 COOLER SHELL SIDE VENT PIPING TACKING

36

36

100.00

25

SK. 21 CW PIPING

26

SK.22 FILTER VENT PIPING TACKING

27

SK. 23 FILTER DRAIN PIPING TACKING

28

SK. 24 ACC VENT DRAIN PIPING TACKING

29

100.00

22

22

100.00

100.00

10

10

100.00

SK. 25 PSV RETURN PIPING TACKING

30.5

30.5

100.00

30

SK. 26 N2 PURGING PIPING TACKING

100.00

31

SK. 27 TANK CONNECTION PIPNG TACKING

12

12

100.00

32

SK. 28 TANK CONNECTION PIPNG TACKING

100.00

33

SK29 IMPULSE PIPING

Total
PIPING WELDING

697.5

100.00

697.5

100.00

QC Verification

26-Apr

27-Apr

28-Apr

29-Apr

30-Apr

1-May

2-May

3-May

4-May

5-May

6-May

7-May

8-May

9-May

10-May

11-May

12-May

13-May

14-May

15-May

16-May

17-May

18-May

19-May

20-May

21-May

22-May

23-May

24-May

25-May

26-May

27-May

28-May

34

SK 1 MOP SUCTION PIPING WELDING

22.5

22.5

100.00

22.5

22.5

100.00

SPECTACLE BLIND-/80NB,150# -NA


35

SK. 2 AOP SUCTION PIPING WELDING

SPECTACLE BLIND-/80NB,150# -NA


36

SK. 3 MOP DISCHARGE PIPING WELDING

38.5

38.5

100.00

37

SK. 4 AOP DISCHARGE PIPING WELDING

32.5

32.5

100.00

38

SK. 5 AOP,MOP DISCH TO COOLER INLET PIPING WELDING

42

42

100.00

39

SK. 6 TCV INLET PIPNG WELDING

12

12

100.00

40

SK 7 PCV INLET WELDING

50

50

100.00

41

SK. 8 PCV RETURN TO TANK PIPING WELDING

24

24

100.00

42

SK. 9 MOP PSV RETUN TO TANK PIPING WELDING

22

22

100.00

43

SK 10 AOP PSV RETURN TO TANK PIPING WELDING

14

14

100.00

44

SK 11 COOLER OUTLET PIPING WELDING

20

20

100.00

45

SK. 12 TCV INLET AND BYPASS PIPING WELDING

22

22

100.00

46

SK. 13 FILTER INLET PIPING WELDING

64

64

100.00

47

SK. 14 TCV OUTLET PIPING WELDING

26

26

100.00

48

SK 15 FILTER OUTLET PIPING WELDING

36

36

100.00

49

SK. 16 ACC INLET PIPING WELDING

34

34

100.00

50

SK 17 PCV TO LUBE OIL OUTLET PIPING WELDING

69

69

100.00

51

SK 18 MOP,AOP HPV RETURN SUPPLY WELDING

100.00

52

SK.19 COOLER DRAIN PIPING WELDING

18

18

100.00

53

SK. 20 COOLER SHELL SIDE VENT PIPING WELDING

36

36

100.00

54

SK. 21 CW PIPING

55

SK.22 FILTER VENTPIPING WELDING

22

22

100.00

56

SK. 23 FILTER DRAIN PIPING WELDING

100.00

57

SK. 24 ACC VENT DRAIN PIPING WELDING

10

10

100.00

58

SK. 25 PSV RETURN PIPING WELDING

30.5

30.5

100.00

59

SK. 26 N2 PURGING PIPING WELDING

100.00

60

SK. 27 TANK CONNECTION PIPNG WELDING

12

12

100.00

61

SK. 28 TANK CONNECTION PIPNG WELDING

100.00

62

SK29 IMPULSE PIPING WELDING

697.5

697.5

100.00

Total
RT

63

STRESS RELEIVING

64

SK 1 MOP SUCTION PIPING SR

SPECTACLE BLIND-/80NB,150# -NA


65

SK. 2 AOP SUCTION PIPING SR

SPECTACLE BLIND-/80NB,150# -NA


66

SK. 3 MOP DISCHARGE PIPING SR

67

SK. 4 AOP DISCHARGE PIPING SR

68

SK. 5 AOP,MOP DISCH TO COOLER INLET PIPING SR

69

SK. 6 TCV INLET PIPNG SR

70

SK 7 PCV INLET SR

71

SK. 8 PC RETURN TO TANK PIPING SR

72

SK. 9 MOP PSV RETUN TO TANK PIPING SR

73

SK 10 AOP PSV RETURN TO TANK PIPING SR

74

SK 11 COOLER OUTLET PIPING SR

75

SK. 12 TCV INLET AND BYPASS PIPING SR

15045D

15045D

76

SK. 13 FILTER INLET PIPING SR

77

SK. 14 TCV OUTLET PIPING SR

78

SK 15 FILTER OUTLET PIPING SR

79

SK. 16 ACC INLET PIPING SR

80

SK 17 PCV TO LUBE OIL OUTLET PIPING SR

81

SK 18 MOP,AOP HPV RETURN SUPPLY SR

82

SK.19 COOLER DRAIN PIPING SR

83

SK. 20 COOLER SHELL SIDE VENT PIPING SR

84

SK. 21 CW PIPING SR

85

SK.22 FILTER VENTPIPING SR

86

SK. 23 FILTER DRAIN PIPING SR

87

SK. 24 ACC VENT DRAIN PIPING SR

88

SK. 25 PSV RETURN PIPING SR

89

SK. 26 N2 PURGING PIPING SR

90

SK. 27 TANK CONNECTION PIPNG SR

91

SK. 28 TANK CONNECTION PIPNG SR

92

SK29 IMPULSE PIPING SR

93

Piping Supports prefbrication

100

94

Piping Supports fitment with job

98

95

Piping Supports welding with job

98

96

Gauge Board Mounting

97

Hold joints welding

98

Tubing and cabelling layout

99

Piping Hydro Testing (H)

100

Piping Acid Cleaning & Phosphating

101

Cooler,Filter,Pump mtg drilling,tapping

102

Painting

103

Piping Reassembly

104

Instrument Tubing

105

Instrument Cabling

106

Temporory Piping Assembly

107

Oil filling

108

Flushing (H)

109

Internal testing

110

Customer inspection (H)

111

Punch Points Clearing

112

Oil draining

113

Rust prevention

114

Packing

115

Shipment. (EXW )

Cabling layout completed

15045D

15045D

29-May

30-May

31-May

1-Jun

2-Jun

3-Jun

4-Jun

5-Jun

6-Jun

7-Jun

8-Jun

9-Jun

10-Jun

11-Jun

12-Jun

13-Jun

14-Jun

15-Jun

16-Jun

17-Jun

18-Jun

19-Jun

20-Jun

21-Jun

22-Jun

23-Jun

24-Jun

25-Jun

26-Jun

27-Jun

28-Jun

29-Jun

30-Jun

1-Jul

2-Jul

3-Jul

4-Jul

5-Jul

6-Jul

7-Jul

8-Jul

9-Jul

10-Jul

11-Jul

12-Jul

13-Jul

14-Jul

15-Jul

16-Jul

17-Jul

15045D

15045D

15045D

15045D

18-Jul

19-Jul

20-Jul

21-Jul

22-Jul

23-Jul

24-Jul

25-Jul

26-Jul

27-Jul

28-Jul

29-Jul

30-Jul

31-Jul

1-Aug

2-Aug

3-Aug

4-Aug

5-Aug

6-Aug

7-Aug

15045D

15045D

15045D