2G Id SR No 3G Site ID (Alpha) CO (Name and Contact No) Site Type (Indoor/Out Door) Battery Type (Shoto 90or 150A/ACB

This document provides site details for site ID 7010 including location in Lahore, battery type and quantity, welding and guarding status, sharing with other operators, CPRI and power cable installation details, rectifier and power cube details, and statuses for various components. Key details include it being an outdoor site with 52 ACB batteries that is guarded in Lahore and shares with Warid. CPRI and power cables should be installed without sharp bends. The rectifier and power cube are in working order with proper breakers, grounding, and alarms.

Uploaded by

Amjad Azeemi
Copyright
© © All Rights Reserved
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
26 views

2G Id SR No 3G Site ID (Alpha) CO (Name and Contact No) Site Type (Indoor/Out Door) Battery Type (Shoto 90or 150A/ACB

This document provides site details for site ID 7010 including location in Lahore, battery type and quantity, welding and guarding status, sharing with other operators, CPRI and power cable installation details, rectifier and power cube details, and statuses for various components. Key details include it being an outdoor site with 52 ACB batteries that is guarded in Lahore and shares with Warid. CPRI and power cables should be installed without sharp bends. The rectifier and power cube are in working order with proper breakers, grounding, and alarms.

Uploaded by

Amjad Azeemi
Copyright
© © All Rights Reserved
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 8

Sr

No

3G Site ID
(Alpha)

2G ID

7010

4292

CO (Name and
Contact No)

Site
Type(Indoor/Out
Door)

outdoor

Battery type(Shoto
90or 150A/ACB

ACB

Batteries
Quantity

Welding Status

52 ok

Guarded/Unguar Guard Contact


ded
No

guarded

City

lhr

Sharing
Status

yes

OMO

warid

CPRI
OMO ID

NO sharp bend to
CPRI

no

Extra CPRI Rings


must be laid on
the tower rather
than on ground

1 sectors ring

RRU Power Cable

Flexible pipe must


NO sharp bend to
be installed on all
RRU Power Cable
CPRI cables

no

no

Extra RRU Power


Cable Rings must
be laid on the
tower rather than
on ground

ok

RRU Power Cable

ACB Rectifier

Flexible pipe must


I lugs or Thimbles
be installed on all
must be installed
RRU Power Cable
RRU power cable.
in In door site

n/a

ok

Rectifier module
work Status

ok

Humidity, smoke &


water sensor must Faulty SPD Status
be installed.

yes

no

Used separate
breaker.

ok

Power Cube

Breaker must not


be under rating.

20amp

Rectifier module
work Status

ok

Power cube must


Faulty SPD Status be grounded with
Bus bar.

Power Cube
Alarms status

AC four core must


lay proper in duct
or in GI Pipe

Cube

Breaker must not


be under rating.

I lugs must be
installed on AC
four core cable.

Antenna & RRU


should be
Batteries
All Rawl bolts
assembled with
connection must should be installed
proper assembly.
be tight.
on power cube.
Chuck nuts and
bolts etc

ok

RET installation
Status

Out door

SPD Installation
status

Filter Installation
status

Replaced faulty
RCU, No
compromise on
RET alarms on
node B.

RRU Grounding
Routing of Power
Must be with
cable and CPRI
Grounding Bar not
mus be in clumps
on tower leg

I lugs
Checknut
Breaker
Neto
Weather Tape

You might also like