API 614-Chapter 2 DATA SHEET Special Purpose Oil System Si Units
API 614-Chapter 2 DATA SHEET Special Purpose Oil System Si Units
Proposal
Purchase
Job No.:
Item No.:
Page: 1 of 7
By:
Date:
Revision:
As built
For
Site
Manufacturer
Date
Inquiry no.
Requisition No.
Vendor
Figure No.
Option Nos.
Comment
Component review
Oil Requirements: See Chapter 1 data sheet (1.1.5, 1.1.6, 1.1.8, 1.1.9, and 1.1.13)
Supply arrangement:
Lube Oil
Seal Oil
Combined
Baseplates:
Separate console
Point support
Multiple package
Package no. 1
Epoxy grout/precoat
Package no. 2
Package no. 3
Basic system details:
Compressor block-in time
minutes
minutes
minutes
other
100% radiography
Other:
Settling out pressures
(barg)
Magnetic particle
(barg) (1.11.1)
Liquid penetrant
Components:
Piping and Tubing:
Material
Special requirements
Tight shutoff
Tubing fittingsMfg.
Air
Model
Cooling water
Other
319678893.xlsx
Vendor
Proposal
Purchase
Job No.:
Item No.:
Page: 2 of 7
By:
Date:
Revision:
As built
Supplier
Manufacturer
Date
Oil Conditioners:
Inquiry no.
Requisition No.
Degassing Drum:
Service used in
Flow control
Type
Operating temp.
Thermostat control
Portable or mounted on
m3/hr normal/max.
Normal retention
Manufacture
Norm/max. capacity
Model
Driver for
Service used in
C
/
Material
minutes
Interior coating
Oversized vent
Vent relief device
SCFM required
HP and enclosure
Volts/PH/Hz
Corrosion allowance
Omit breather
Code construction
Code stamp
Design/test barg
Other
Other
Other
Material of construction
Other
Other
Reservoir
Service application
Separate lube
Lube/seal combined
Separate seal
319678893.xlsx, 2-50
Proposal
Purchase
Job No.:
Item No.:
Page: 3 of 7
By:
Date:
Revision:
As built
Supplier
Manufacturer
Date
Inquiry no.
Lube
Requisition No.
Lube/seal
Booster seal
main/standby
emergency
Service application
Figure nos.
Include option nos.
Emergency pump system
Pump service
main/
standby
emergency
main/
standby
emergency
Lube oil,
Seal oil &
Control oil
Separate
control oil
Separate seal
oil
Booster pump
discharge oil
Separate
coupling oil
319678893.xlsx, 2-51
per service
Proposal
Purchase
Item No.:
Page: 4 of 7
By:
Date:
Revision:
As built
Supplier
Purchase Order No.
Job No.:
Manufacturer
Date
Inquiry no.
Requisition No.
Coolers:
Service application
Lube
Lube/seal
Code construction/stamp
Material: shell
Channels and covers
Tube sheets and tubes
Removable tube bundle
U-bend tubes permitted
Oil temperature control valve
Continuous Flow Transfer Valves:
Service application:
Lube oil,
Separate
Separate seal
Booster pump
Separate
control oil
oil
discharge oil
coupling oil
Control oil
Common for coolers and filters
Tight shutoff required
Type
Manufacturer
Model
With lifting jack
Rating: barg
Materials: Body
Plug or ball
Trim
319678893.xlsx, 2-52
Proposal
Purchase
Supplier
Job No.:
Item No.:
Page: 5 of 7
By:
Date:
Revision:
As built
Manufacturer
Date
Inquiry no.
Requisition No.
Accumulators:
Service application
Lube oil
Control oil
Seal oil
Rundown
lube
Low pressure
seal
Medium pressure
seal
High pressure
seal
Required, yes or no
Service combined with
Direct contact tank
Bladder type
Include options no.
Capacity (mins)
Capacity (liters)
Blowdown connection
Rundown tanks (Figs. 2A-12a, 2A-12b)
Overhead tank (Figs. 2A-12, 2A-13)
Corrosion allowance
Material
Total capacity (liters)
Design/test (barg)
Code construction/stamp
319678893.xlsx, 2-53
Proposal
Purchase
Supplier
Job No.:
Item No.:
Page: 6 of 7
By:
Date:
Revision:
As built
Manufacturer
Date
Inquiry no.
Requisition No.
Rundown
Low pressure
Medium pressure
High pressure
lube
seal
seal
seal
319678893.xlsx, 2-54
Proposal
Purchase
Shop inspection
Item No.:
Page: 7 of 7
By:
Date:
Revision:
As built
Supplier
Purchase Order No.
Job No.:
Manufacturer
Date
Inquiry no.
Requisition No.
Shop test
Required
Cleanliness
Check controls
Changeover filters/coolers
Special examinations
Code construction/stamp
Sound level
Witness