CPIM DSP Sample Test
CPIM DSP Sample Test
1. Which of the following activities can be included in contract management for suppliers ?
. Periodic status report.
. Gantt chart.
. First article inspection.
. Status review meetings.
A. , , B. , ,
C. , , D. , , ,
A. , B. , C. , D. , ,
3. What is the required capacity for W/C 121 when lot size of component A is 100 units ?
A. 10 B. 12 C. 100 D. 210
DSP : Capacity Requirement Planning.
4. At the end of work of W/C 136, 100 units of component A are all scrapped. How many the
hours should be required additionally ?
A. 30 B. 63 C. 75 D. 160
6. Which documents are (is) regarded as the payment for supplier's goods ?
. Bill of lading.
. Packing list.
. Arrival notice.
. Invoice.
A. B. C. , D. , ,
8. Which of the following is the MOST effective practice for the supplier relationship ?
A. Providing demand forecasting for end item.
B. Providing scheduled receipts for suppliers' item.
C. Providing firm planned orders for suppliers' item.
D. Providing planned order receipts for suppliers' item.
9. Calculate the EOQ using the following information.
Annual Demand = 2500 units.
Ordering costs = $ 25.
Carrying costs = $ 2 / unit
Unit costs = $8
10. The table are routing information for order A, B, and C. What is the required capacity for
order C ?
(Lot size = 100 units)
10 100 1 0.5
A 20 201 2 0.2
30 112 1 0.9
10 112 1 0.9
B
20 202 2 0.7
10 101 1 0.5
20 201 2 0.2
C
30 300 1 1.0
40 112 1 0.9
11. Which of the following is required for the successful implementation of JIT ?
A. Pilot group. B. Returnable container.
C. Lag strategy. D. Accurate MRP output.
DSP : Capacity Requirement Planning.
12. What is the rated capacity of W/C 112 when break down of two machines occur ?
Utilization = 90%.
Efficiency = 80%
No. of machines = 6
No. of shifts = 3
Work hours per day = 8 hours
No. of work days per week = 5 days
14. Bucketless MRP system are generally evaluated more effective than typical MRP system
because :
A. It is capable of planning MRP system at the accurate time point.
B. It is appropriate for the stable demand business environment.
C. It is possible for MRP system regenerated to the overall transaction during some periods.
D. Never, it is only the cost factor.
15. In a transfer line, cycle time of the end item is 36 seconds. How many inventory are
carried for customer delivery ? (Projected delivery lead time is 2 hours)
A. 4 units B. 72 units C. 200 units D. 432 units
16. What is the important element for JIT supplier ?
A. Statistical process control for quality. B. Financial stability.
C. Cost effectiveness. D. Delivery reliability.
17. Which of the following is TRUE regarding the timing of preventive maintenance activity ?
A. It is reasonable when the machine has just finished its work.
B. It is reasonable when operators of the machine have just finished their work.
C. When the problem occur in the work center.
D. There must exist a schedule for preventive maintenance.
19. Based on the below time phased record, which of the following is TRUE ?
A. Period 1 for 50 ; Period 2 for 400 ; Period 3 for 100 ; Period 4 for 50
B. Period 3 for 350 ; Period 4 for 50
C. Period 2 for 400 ; Period 3 for 50 ; Period 4 for 50
D. Period 2 for 350 ; Period 3 for 50 ; Period 4 for 50
20. All of the following may increase the complexity of capacity planning EXCEPT ?
A. Lot size. B. Order Mix Variability.
C. Backlog. D. Bottleneck
24. Which of the following is the MOST important factor of JIT to the customer ?
A. Quality. B. Price. C. Short lead time. D. On time delivery.
25. What is the minimum inventory level when the information of a item is as following ?
Demand during lead time = 100 units.
Customer service lever = 99%
Standard deviation = 200 units.
26. Daily sales quantities are 10 units, standard deviation for sales is 3 units. What is the
probability of sales quantities less than 16 units ?
A. 84.13% B. 97.72% C. 99.87% D. None
28. Information of full pegging provide the planner with which information of the following ?
A. Parent's order. B. Independence source.
C. Parent's part number. D. Product's part number.
29. Which of the following information would be used as the input of MRP and CRP ?
A. Bill of Materials B. Work center data.
C. Manufacturing orders D. Inventory data.
30. Which of the following is(are) appropriate as performance measures for MRP system ?
. Inventory turnover.
. Inventory level.
. Delivery speed.
. Purchasing cost reduced.
A. B. C. and D. , and
32. What is the actual capacity of W/C ?
Outputs for 4 weeks = 610 units, 630 units, 600 units, 640 units
Utilization = 80 %
Efficiency = 60 %
Production standard hours = 42 hr / week
Calculated capacity = 44 hr /week
33. Which of the following is TRUE when increasing MRP planning frequency ?
A. Expediting/de-expedite increasing. B. Planned lead time increasing.
C. Replanning frequency increasing. D. MRP accuracy increasing.
34. All of the following information would be directly included in the MRP system EXCEPT ?
A. Actual labor cost. B. On-hand inventory.
C. Order due date. D. Order release date.
39. All of the following would be included in the activities of capacity management EXCEPT ?
A. Resource requirement planning. B. RCCP.
C. CRP. D. Dispatching.
40. Which of the following environment would be the MOST useful for full pegging technique ?
A. Engineer to order. B. Make to order.
C. Make to stock. D. Assemble to order.
A. 12 B. 13 C. 14 D. 15
42. Management notice that a vendor have the chronic problem for on-time delivery. Which of
the following practice is appropriate corresponding to the vendor ?
A. Safety lead time. B. Safety stock. C. Reorder point. D. MRP.
If thirty quantities of order are complete, How much loads are left in the W/C 100 ?
45. Which of the following element is (are) included in item master file (item record) ?
. Lead time.
. Part number.
. Part structure.
. Manufacturing cost.
A. and B. and
C. and D. and
A. , , B. , , C. , , D. , ,
48. When the due date of a item is unexpectedly delayed, a MRP planner first should :
A. Replan MRP.
B. Calculate loads for re-balancing.
C. Communicate with the customer.
D. Expedite the order.
49. The below work center file is for product group A and B.
50. In JIT environment, which of the following practice is generally considered as cost effective
for the supplier ?
A. Multiple supplier of product family. B. Single supplier of product family.
C. Multiple supplier of each product. D. Single supplier of each product.
DSP : Capacity Requirement Planning.
51. One solution to minimize costs when getting small frequent deliveries from suppliers would
be to utilize backhauling. Which of the following BEST defines backhauling ?
A. FOB at the suppliers dock.
B. Using a full truck outbound and an LTL load inbound.
C. Using Kanban to signal suppliers for delivery.
D. Utilizing your trucks to pick up product at suppliers on the way back to your facility.
52. The mission of the purchasing department is to identify and qualify adequate sources of
competitively priced supply to manufacture the products required by the marketplace. Many
times, this mission includes identifying sources regardless of their location. This is called :
A. Faceted sourcing. B. Global sourcing.
C. Localized sourcing. D. Leveled sourcing.
53. Traditionally, purchasing managers believed that having many suppliers for the same parts
would allow them to play one supplier against another. The trend today is toward fewer but
higher quality suppliers. One way to identify the high quality suppliers is through a
A. Supplier audit program. B. Quality inspection program.
C. Supplier reliability program. D. Supplier certification program.
A. I, II, and III B. I, II, and IV C. I, III, and IV D. II, III, and IV
56. The purchasing manager of a company received the following quote for some raw
materials:
Less than 500 units - $50/unit.
500 units or more - $40/unit.
If the ordering cost equals $40, annual volume is 2500 units and the carrying cost of inventory
is 20%, what is the annual cost of the least-cost order quantity ?
A. $2000 B. $1414 C. $4000 D. $2200
58. During inflationary periods, which of the following statements would be true if the LIFO
method of inventory valuation is used ?
A. Inventory value would be lower, cost of goods sold higher.
B. Inventory value would be higher, cost of goods sold higher.
C. Inventory value would be higher, cost of goods sold lower.
D. None of the above.
59. There are occasions when the quality of a product will not meet specifications without
rework. When this occurs, the product will go back through some of the same operations and
maybe some new ones as well. Which of the following describes the best way to handle the
rework, so as to be able to calculate the required capacity including the rework ?
A. Generate a rework order with the routing steps on it. CRP will then include it in its
calculations.
B. Keep the rework order separate and add it to the work centers after the CRP run is
completed.
C. Do not generate a rework order as it will duplicate erroneously the load on the plant.
D. Send the rework to a separate area in the plant and keep it out of the normal routings.
60. Finite loading has been viewed as a sophisticated technique to ensure promised delivery
dates to the customer are met. However, there are some problems with it. Which of the
following would describe a problem with finite loading ?
A. Planned orders cannot be planned accurately.
B. It assumes predictability of job arrival.
C. Capacity is not finite.
D. Efficiency is not predictable, therefore, capacity is not predictable.
61. In a VMI system of inventory, who is responsible for maintaining the inventory levels at the
proper levels to ensure high customer service levels ?
A. Planners. B. Suppliers. C. Buyers. D. Supplier scheduler.
62. When a supplier has been certified and has been reliably delivering products to a
company, often times the company will develop a process, whereby, purchase orders are no
longer necessary. The product will arrive at the dock, bypass inspection and counting, and be
delivered to the production line. This delivery location on the production line is called a :
A. Point of use location. B. Consignment location.
C. Dock to stock location. D. VMI location.
63. Often, companies will use cross-functional teams to develop new designs and get products
to market. These cross-functional teams will very often include the appropriate suppliers in the
design. This allows the product development activities to overlap each other, thereby, shortening
the product development time. This process of overlapping activities in the product development
cycle is called :
A. Design for quality. B. Design accountability.
C. Supplier partnerships. D. Concurrent engineering.
64. Supplying vendors with projections of future orders provides support for which of the
following vendor activities ?
. Workforce stabilization
. Raw material cost reduction
. Capacity utilization improvement
65. It is important to maintain a close relationship with certified supplier partners. The MOST
difficult part of establishing a supplier partnership is :
A. Establishing trust in the relationship.
B. Developing a consistent, accurate form of communication.
C. Ensuring consistent meetings are occurring to build relationships across company
boundaries.
D. Training and educating the workforce.
66. In today's manufacturing environment of eliminating waste, many companies are eliminating
the purchase order because it does not add value for the customer. This is accomplished
usually by replacing individual PO's with :
A. Phone calls. B. FAXes.
C. Supplier schedules. D. Planner reports.
68. A disciplined effort to compare the function performed by an item and its cost in an
attempt to find a lower cost alternative is called :
A. Item evaluation. B. Re-engineering.
C. Supplier partnership. D. Value analysis.
69. Which two of the following functions are the responsibility of purchasing rather than inventory
management ?
. Negotiating the price to be paid for purchased materials.
. Determining the appropriate order quantity when the supplier offers quantity discounts.
. Specifying delivery dates and quantities on blanket purchase orders.
. Monitoring supplier performance and deciding when to switch from one supplier to
another.
A. , B. , C. , D. ,
70. When the MPS is infeasible to produce, which of the following techniques would be used
to smooth the capacity requirements ?
A. Scheduled receipts. B. Firm planned orders.
C. Resource profiles. D. Capacity bills.
71. Which of the following BEST describes an outbound stockpoint in a Kanban scheduling
system ?
A. A field warehouse nearest a large market.
B. A staging area for outbound shipments.
C. A location on the plant floor near the point of use where material is moved to be pulled
to the next operation.
D. An inventory location at the customer site.
DSP : Capacity Requirement Planning.
72. Firm planned orders are useful for doing which of the following ?
. Preventing the system from automatically rescheduling
. Creating a planned order that does not agree with the lot sizing rule for that item
. Preventing the explosion of requirements at lower levels
. Freezing the timing of a planned order release
A. I only B. III and IV only C. I, II, and IV only D. I, II, III, and IV
73. A line of appliances is due for a design change at the end of the model year. In planning
the maximum reasonable production for the current design, which of the following factors should
NOT be taken into account ?
A. The probable accuracy of the demand forecasts for the remainder of the season.
B. The cost of expediting production changes if the demand is greater than planned.
C. The cost of carrying excess stock until it is consumed for spares.
D. The cost of making the design changes.
74. Which of the following reasons could be used to justify maintaining safety stock in an MRP
system ?
. Uncertain leadtimes for raw materials
. Items used for spare parts which are also used in assembly
. Component items manufactured in-house have had inventory errors
Solution :