Clean Air Flow Test
Clean Air Flow Test
PROJECT:M/s RAMAGUNDAM
UNIT 7 (500 MW )
PROJECT
PROCEDURE
PURPOSE OF
DOCUMENT
DOCUMENT NO.
PS:TSX:173:00:03
COPY NO:
ISSUED TO:
00
Rev. No.
KJ
KPTM
KB
04.08.2003
Prepared by
Reviewed by
Approved by
Date
Station: NTPC
RAMAGUNDA
M
Sheet 1 of 10
PLANT DETAILS
2.0
OBJECTIVE
3.0
PROPOSAL
4.0
SERVICES REQUIRED
5.0
SAFETY PERECAUTIONS
6.0
EMERGENCY PROCEDURE
7.0
8.0
METHOD
9.0
COMPLETION CRITERIA
10.0
APPENDICES
LOG SHEET
Station: NTPC
RAMAGUND
AM
Sheet 2 of 10
PLANT DETAILS
1.1
1.2
There are 4 (four) coal pipes emanating from each mill from mill
outlet point with individual mill discharge valve (MDV) and coal
pipe shut-off gate near the coal bumer assembly. These coal
pipes are subjected to clean air flow test to ensure uniform flow in
all the coal pipes.
1.3
The mills are pressurized mills with primary air fans supplying the
air flow and the head required for overcoming milling system
resistance.
1.4
Signatures
NTPC
BHEL
Station: NTPC
RAMAGUNDA
M
Sheet 3 of 10
:
:
:
:
:
:
XRP 103
BHEL 9
66.3 TPH
525 KW
600 RPM
Cold PA
Lub-oil System
a.
b.
c.
d.
e.
1.6
Pump Make/Type
Capacity
Speed
Relief Valve Setting
Motor Rating
:
:
:
:
Alekton / Screw
70 LPM
970 RPM
7.0 KSC
:
3.7 KW
Since, Primary Air Fans and mills are available for this test, the
required plant item completion list, for mechanical, Electrical and
C & I to be prepared at site prior to test.
Signatures
NTPC
BHEL
Station: NTPC
RAMAGUND
AM
Sheet 4 of 10
OBJECTIVE
Clean Air flow test in milling system is carried out to
i.
check velocity variation between the pulverized coal
pipes of a mill is within allowable limit and there by to
ensure that correct size orifices are installed in coal
pipes for equalizing the Air flow and
ii.
there is no foreign material plugged inside the
pulverised coal pipes.
3.0
PROPOSAL
3.1
Clean Air flow tests shall be conducted in all the mills individually
with Cold Air.
3.2
The test will be conducted by running primary air fan and mill and
flow measurement will be taken at specified locations( ref. s 7.7 &
7.10) and ensured that completion criteria (Section 9.0) is
achieved by placing required sizes of orifice plates in p.c.
pipelines.
Note :
The complete responsibility for conducting the test in a safe and
systematic manner following the approved procedure as well as
making the system ready are in the BHELs scope.
4.0
SERVICES REQUIRED
4.1
4.2
4.3
Signatures
NTPC
BHEL
Station: NTPC
RAMAGUNDA
M
Sheet 5 of 10
4.5
4.6
4.7
Availability of LT supply
4.8
Availability of HT supply
4.9
Pitot Tube
5.0
SAFETY PRECAUTIONS
5.1
5.2
5.3
5.4
5.5
Other agencies working near the test area are informed / cleared
as per requirement. SRCC will be enforced.
6.0
EMERGENCY PROCEDURE
6.1
The test team should be aware of the steps to be taken to trip the
running equipment in case of any emergency / abnormal
observations are notified to them.
Signatures
NTPC
BHEL
Station: NTPC
RAMAGUND
AM
Sheet 6 of 10
6.3
7.0
7.1
The trial run of the mill which is selected for the test, is completed
and is ready for operation from remote in all respect . The milling
system should be clean and all air leakage points have been
arrested.
7.2
7.3
7.4
7.5
Mill and Coal pipes seal air dampers are commissioned and kept
fully closed.
7.6
The Coal Pipes isolation gate near the burner end (in all 4
corners) are kept opened fully.
7.7
Signatures
NTPC
BHEL
Station: NTPC
RAMAGUNDA
M
Sheet 7 of 10
7.9
7.10
7.11
All gates and dampers in Primary Air, Secondary air and Milling
circuits are commissioned and ready for operation from remote.
7.12
7.13
7.14
Pitot Tube to be used for clean air flow test is calibrated one and
the calibration certificate is available.
7.15
8.0
METHOD
8.1
8.2
Under Mill in off condition, start seal air fan and ensure discharge
pressure more than the mill inlet pressure by 100 mm wcl. Then
start the mill as per O & M manual instruction and keep it in
running condition.
Signatures
NTPC
BHEL
Station: NTPC
RAMAGUNDA
M
Sheet 8 of 10
Air flow through the mill is increased by opening hot /cold air damper
and loading PA fan accordingly.
8.5
8.6
Select a Coal Pipe of average length, and insert the pilot tube to the
center of the pipe and adjust the air flow to produce the calculated
pilot tube differential pressure (approximetely 110% flow)
8.7
8.8
8.9
Record mill air temperature, mill air flow indication mill differential
pressure, PA header pressure at control room. If control room
indications are not available for certain parameter, than suitable
measuring arrangements to be made at local. (If both are available,
cross check local and remote readings)
Velocity profile in each Coal Pipe shall be obtained by traversing the
pitot tube at the same plane in two directions (A and B), 90 0 apart at
the center of equal areas. (Suggested locations is as given in
section 7.7&7.10)
Convert the pilot tube differential pressure reading (velocity head)
into air velocity inside the Coal Pipe by using the formula
V = 0.2365227
h. (t)
NTPC
BHEL
Station: NTPC
RAMAGUND
AM
Sheet 9 of 10
Record air temperature and flow differential across the mill inlet
air measuring device. These values are to be frequently checked
and maintained throughout the test .
8.12
8.13
In case the deviation is not within the allowable limit, sizes of the
orifices plates will be adjusted and the test will be repeated till
deviation is within the limit.
8.14
Determine the Weight flow per minute through each coal pipe
using the equation: Air flow (Kg/min) = ( x D2/4)xV60X?
Where V = Air velocity m/sec
D = Coal pipe ID , m
? = Air density , Kg/m3 at test temperature.
Totalise the air flow for one mill.
9.0
COMPLETION CRITERIA
9.1
The clean air flow test for Coal Pipes completed after achieving
the following criteria.
a)
Signatures
NTPC
BHEL
Sheet 10 of 10
10.0
LOG SHEET
DATE:
PROJECT
UNIT
ACTIVITY
:
:
:
Corner 1
S.No
A
h
B
V
Corner 2
A
B
h
V
h
V
Corner 3
A
B
h
V
h
V
Corner 4
A
B
h
V
h
V
1
2
3
4
5
6
7
8
9
10
11
Ave.Vel
(m/sec)
Air
Flow
(T/Hr)
1.
2.
3.
4.
5.
6.
7.
Air Temperature
Coal Pipe ID
PA HDR Pressure
Furnace Pressure
Max. Velocity
Average Velocity (Vp)
Min. Velocity
:
:
:
:
:
:
:
(Tolerance +5%)
(Tolerance 5%)
Signatures
NTPC
BHEL