Miscellaneous Plastic (Plastic Scoop) : F E D C B A
Miscellaneous Plastic (Plastic Scoop) : F E D C B A
3s
18s
TASK
A
B
C
D
E
F
TASK
TIME
(seconds)
3
8
12
15
12
10
12s
15s
12s
10s
PREDECESSOR / TASKS
THAT MUST PRECEDE
A
B
C
D
E
TASK DESCRIPTION
Insert raw material
Material inject to mold
Product produce
Cutting and cleaning
QC checking
Packaging
The time for a process is about 60 seconds and the production time is 480 minutes per
day.
Daily production rate is 2800
18s
12s
15s
12s
10s
IDLE TIME
Idle time= [( num of work station)( cycle time)] total workstation time
= [(6) x ( 10.29)] 60
= 1.74
BALANCE DELAY (BD) = (total idle time / total workstation time) x 100
BD = (1.74 / 60) x 100
BD = 2.9%
14s
50s
55s
D
20s
TASK
A
B
C
D
E
F
G
H
I
J
17s
17s
17s
13s
TASK
TIME
(seconds)
50
16
14
55
20
17
17
17
13
14
14s
TASK DESCRIPTION
Insert raw material
Material inject to mold
Product produce (bottle)
Cutting and cleaning
Product produce (bottle cap)
Cutting and cleaning
Insert raw material
Material inject to mold
Product produce ( insert )
Packaging
The time for a process is about 250 seconds and the production time is 480 minutes per
day.
Daily production rate is 420
16s
14s
50s
55s
D
20s
14s
17s
17s
17s
13s
IDLE TIME
Idle time= [( num of work station)( cycle time)] total workstation time
= [(4) x (68.57)] 250
= 24.28
BALANCE DELAY (BD) = (total idle time / total workstation time) x 100
BD = (24.28 / 250) x 100
BD = 9.71%
54s
G H
TASK
A
B
C
D
E
F
G
H
TASK
TIME
(seconds)
54
24
36
12
18
24
42
66
24s
36s
12s
18s
24s
42s
66s
TASK DESCRIPTION
Insert raw material
Material inject to mold
Product produce (bottle)
Material inject to mold
Product produce (bottle cap)
Cutting and cleaning
Checking (QC)
Packaging
The time for a process is about 276 seconds and the production time is 440 minutes per
day.
Daily production rate is 400
54s
G H
24s
36s
12s
18s
24s
42s
IDLE TIME
Idle time= [( num of work station)( cycle time)] total workstation time
= [(5) x (66)] 276
= 54
BALANCE DELAY (BD) = (total idle time / total workstation time) x 100
BD = (54 / 276) x 100
BD = 19.56%
66s
40s
D
H
30s
20s
40s
6s
25s
C
50s
15s
G
TASK
A
B
C
D
E
F
G
H
I
TASK
TIME
(seconds)
40
30
50
40
6
25
15
20
18
18s
TASK DESCRIPTION
Insert raw material
Material inject to mold
Material inject to mold
Product produce (bottle)
Cutting and cleaning
Product produce (spray cap)
Checking (QC)
Packaging
Packaging
The time for a process is about 244 seconds and the production time is 440 minutes per
day.
Daily production rate is 400
40s
D
H
30s
20s
40s
6s
25s
C
50s
15s
G
18s
IDLE TIME
Idle time= [( num of work station)( cycle time)] total workstation time
= [(5) x (60)] 244
= 56
BALANCE DELAY (BD) = (total idle time / total workstation time) x 100
BD = (56 / 244) x 100
BD = 22.95%