PART 1 GENERAL
1.01 SCOPE OF WORK
A. Furnish all labor, materials, equipment, and incidentals required to install, field
test, complete, and make ready for service (Quantity and Description) ---- vertical
high density cross-linked polyethylene storage tank(s) designed for use with 80% 98% Sulfuric Acid and approved containment system as shown on the Drawings
and as specified herein.
Optional Section
B. Cage ladder shall be furnished as a part of the work of this Section and shall be in
accordance with OSHA standards. Tank shall be furnished with all lugs required
for mounting the ladder as specified by the MANUFACTURER and rated by
MANUFACTURERs for use with 80% -98% Sulfuric Acid.
Optional Section
C. Leak detection system shall be furnished as a part of the work of this Section and
shall be complete with tank system. The leak detection system shall be between
primary and secondary walls and provided with associated fittings, down pipe,
alarm, and control box.
1.02 SUBMITTALS
A. Submit to the ENGINEER as provided in Section-------, shop drawings details of
construction and erection as follows:
1. Dimensions of tank, fittings and attachments.
2. Wall thickness calculations per ASTM D 1998-97 using 600 psi design hoop
stress @ 100 degrees F.
3. Locations of fittings and attachments.
4. Resin used and a complete manufacturers specification of the resin used.
5. Weight of tanks.
6. Statement that fabrication is in accordance with these Specifications.
7. Samples.
8. Instructions for handling, storage and installation of tanks.
9. Statement that materials and resin used are suitable for intended service.
10. (Optional) Drawing details for ladder, platform, and safety cage as
recommended by MANUFACTURER.
B. Drawing Approval
1. Shop drawings shall be approved by the ENGINEER prior to manufacturing of
the tank(s). Approval of drawings by the ENGINEER shall not release the
CONTRACTOR of responsibility of compliance with these specifications. All
proposed changes to these Specifications shall be stated in writing
C. Samples.
1. Representative samples of the Metallocene High Density Crosslinked
Polyethylene with an Oxidation Resistant Polyethylene Liner tank shall be
furnished at the time of shop drawing review. These samples shall be from plant
production and shall be representative of quality and impact resistance of tanks
to be furnished. The ENGINEER may reject any tank which does not meet the
standard of the representative samples.
D. References
1. Submit to ENGINEER list of previous 10 similar use site installations in the past
36 months.
2. Submit to the ENGINEER supporting information of UL tank manufacturing
capabilities.
3. Submit to the ENGINEER supporting information of ISO 9001 certification.
1.04 REFERENCE STANDARDS
A. American National Standards Institute (ANSI)
1. ANSI B16.5 Pipe Flanges and Flanged Fittings.
B. American Society of Testing Materials (ASTM)
1. ASTM D638 Standard Test Method for Tensile Properties of Plastics.
2. ASTM D746 Brittleness Temperature of Plastics and Elastomers by Impact.
3. ASTM D790 Standard Test Methods for Flexural Properties of Unreinforced
and Reinforced Plastics and Electrical Insulating Materials.
4. ASTM D883 Standard Definitions of Terms Relating to Plastics.
5. ASTM D1505 Density of Plastics by the Density-Gradient Technique.
6. ASTM D1525 Vicat Softening Temperature of Plastics.
7. ASTM D1693 ESCR Spec. Thickness .125 F50 10% Igepal.
8. ASTM D1998 Standard Specification for Polyethylene Upright Storage
Tank: Section 11.3: Low Temperature Impact Test and Section 11.4:
Oxylene-Insoluble Fraction (Gel Test).
C. Where reference is made to one of the above following standards, the revisions
in effect at the time of the bid opening shall apply.
Optional Section
g/cc
Units
Value
.940 to .945
Hrs.
> 1000
Psi.
2,600
Percent
400
Degrees F.
240
Degrees F.
-130
Psi.
100,000 to 110,000
Degrees C.
67
Ft. lbs.
75
Hrs.
>1000
Psi.
900
dome of the primary tank shall be equal or larger in diameter than the barrel
of the outer secondary tank. The dome extension shall extend to the outside
diameter of the tank forming a weather shield for the outer tank. The
secondary containment tank, outer tank, shall be a MHDXLPE, open top,
vertical, cylindrical, flat bottom, and seamless in construction. The dimension
details, and accessories shall be shown on drawings and specifications
herein.
F. The tank diameter shall be measured externally. Tolerance on the outside
diameter including out of roundness shall be plus or minus 3 percent.
Measurement shall be taken in a horizontal position. The knuckle radius at
bottom to wall shall be a minimum of 1-in.
H. The minimum wall thickness shall be -inches in all places (or see 1.02A).
I.
All edges cut out, such as entrance manway, shall be trimmed to have smooth
edges.
No restrictions
1. Impact Test: ASTM 1998-Section 11.3 shall be used for this test. Sample
shall not shatter at 120 ft. lbs. with sample at minus 20 degrees F for a -in
wall thickness. For a wall thickness less than -in, the sample shall not
shatter at 100 ft. lbs. and minus 20 degrees F.
2. Degree of Crosslinking Test: ASTM 1998-Section 11.4 shall be used in this
test. A minimum of 70 percent Gel must be obtained.
3. Hydrostatic Test: Each tank shall be filled with water and checked for leaks
no less than one hour after filling.
4. Wall Thickness: Each tank shall have an actual wall thickness measurement
taken at every 90 degrees, at each one foot elevation, up to three feet from
the bottom of the tank.
PART 3: EXECUTION
3.01 INSTALLATION
A. Install the MHDXLPE tanks in accordance with the Drawings and the
manufacturers instructions.
B. All fitting connections must be installed with flexible type connections as per the
Manufacturers recommendations.
C. Make all pipe connections to tanks as shown on the Drawings.
D. Following the field test, tanks and support members shall be anchored in their
final position according to the manufacturers recommendations.
3.02 FIELD TESTING
A. After installation, each tank connecting pipes, and valving shall be field tested by
filling with water. The tank and fittings shall hold water without loss, evidence of
weeping or capillary action for a period of 24 hours prior to acceptance. The
ENGINEER may also inspect each tank for defects, damage, and conformance
with the Specifications.
B. After testing, the tanks shall be thoroughly cleaned and dried.
C. Should any defects become evident during inspection, testing, or within the
guarantee period, the CONTRACTOR shall repair or replace the defective tank
or fitting as approved by the ENGINEER.
3.03 WARRANTY
A. The CONTRACTOR shall warrant the tanks to be free from defects in materials
and workmanship and to be suitable for the applications and chemicals as
specified in these Contract Specifications.
B. The MHDXLPE tanks shall have a warranty equal to the Poly Processing
Company Limited Warranty for the storage of 80% - 98% Sulfuric Acid (REV. C /
April 15,2000).
END OF SECTION