Engineering and Fabrication of Ewt Module For Nautica Muar
Engineering and Fabrication of Ewt Module For Nautica Muar
Prepared by
Noor Rashidawani Md Noor
This document is the property of MTC Engineering Sdn. Bhd. and shall not be either reproduced or copied in whole or in part or
communicated to any third party without the prior written consent of MTC Engineering Sdn. Bhd..
OUTLINE
PART 1
ENGINEERING
PART 2
CONSTRUCTION
PART 3
COMMISSIONING
PART 4
LESSON LEARNT
This document is the property of MTC Engineering Sdn. Bhd. and shall not be either reproduced or copied in whole or in part or
communicated to any third party without the prior written consent of MTC Engineering Sdn. Bhd..
PART 1
ENGINEERING
This document is the property of MTC Engineering Sdn. Bhd. and shall not be either reproduced or copied in whole or in part or
communicated to any third party without the prior written consent of MTC Engineering Sdn. Bhd..
ENGINEERING
SLUG SUPRESSION
SYSTEM
EWT
MODULE
CRUDE
SEPARATION
SYSTEM
FUEL GAS
SYSTEM
This document is the property of MTC Engineering Sdn. Bhd. and shall not be either reproduced or copied in whole or in part or
communicated to any third party without the prior written consent of MTC Engineering Sdn. Bhd..
ENGINEERING
Slug suppression system
Scrubber
Separator
Separator
Water
Outlet
This document is the property of MTC Engineering Sdn. Bhd. and shall not be either reproduced or copied in whole or in part or
Crude
separation
communicated to any third party without the prior written consent of MTC Engineering
Sdn. Bhd..
Oil
Outlet
system
ENGINEERING
3 Phase
Separator
HP Separator
LP Separator
This document is the property of MTC Engineering Sdn. Bhd. and shall not be either reproduced or copied in whole or in part or
communicated to any third party without the prior written consent of MTC Engineering Sdn. Bhd..
ENGINEERING
Scrubber
HP
Srubber
KO
Srubber
Fuel Gas
Srubber
This document is the property of MTC Engineering Sdn. Bhd. and shall not be either reproduced or copied in whole or in part or
communicated to any third party without the prior written consent of MTC Engineering Sdn. Bhd..
ENGINEERING
This document is the property of MTC Engineering Sdn. Bhd. and shall not be either reproduced or copied in whole or in part or
communicated to any third party without the prior written consent of MTC Engineering Sdn. Bhd..
ENGINEERING
DESIGN CAPACITY :
MAX GAS PRODUCTION
MAX OIL PRODUCTION
MAX PRODUCED WATER PRODUCTION
40 MMSCFD
10000 BPD
2000 BPD
This document is the property of MTC Engineering Sdn. Bhd. and shall not be either reproduced or copied in whole or in part or
communicated to any third party without the prior written consent of MTC Engineering Sdn. Bhd..
PART 2
CONSTRUCTION
This document is the property of MTC Engineering Sdn. Bhd. and shall not be either reproduced or copied in whole or in part or
communicated to any third party without the prior written consent of MTC Engineering Sdn. Bhd..
CONSTRUCTION
VESSEL INTERNAL
PRESSURE VESSEL
PIPING
CONSTRUCTION
OF EWT MODULE
ELECTRICAL
STRUCTURAL
INLET HEATER
This document is the property of MTC Engineering Sdn. Bhd. and shall not be either reproduced or copied in whole or in part or
communicated to any third party without the prior written consent of MTC Engineering Sdn. Bhd..
CONSTRUCTION
PRESSURE VESSEL
1. Material Arrival
2. Material Inspection
This document is the property of MTC Engineering Sdn. Bhd. and shall not be either reproduced or copied in whole or in part or
communicated to any third party without the prior written consent of MTC Engineering Sdn. Bhd..
CONSTRUCTION
PRESSURE VESSEL
3. Marking
4. Surface Preparation
This document is the property of MTC Engineering Sdn. Bhd. and shall not be either reproduced or copied in whole or in part or
communicated to any third party without the prior written consent of MTC Engineering Sdn. Bhd..
CONSTRUCTION
PRESSURE VESSEL
5. Forming of dishes
6. Plate rolling
This document is the property of MTC Engineering Sdn. Bhd. and shall not be either reproduced or copied in whole or in part or
communicated to any third party without the prior written consent of MTC Engineering Sdn. Bhd..
CONSTRUCTION
PRESSURE VESSEL
8. Welding of dishes
This document is the property of MTC Engineering Sdn. Bhd. and shall not be either reproduced or copied in whole or in part or
communicated to any third party without the prior written consent of MTC Engineering Sdn. Bhd..
CONSTRUCTION
PRESSURE VESSEL
9. Nozzle Pre-Fabrication
This document is the property of MTC Engineering Sdn. Bhd. and shall not be either reproduced or copied in whole or in part or
communicated to any third party without the prior written consent of MTC Engineering Sdn. Bhd..
CONSTRUCTION
PRESSURE VESSEL
This document is the property of MTC Engineering Sdn. Bhd. and shall not be either reproduced or copied in whole or in part or
communicated to any third party without the prior written consent of MTC Engineering Sdn. Bhd..
CONSTRUCTION
PRESSURE VESSEL
13. Hydrotest
14. Painting
This document is the property of MTC Engineering Sdn. Bhd. and shall not be either reproduced or copied in whole or in part or
communicated to any third party without the prior written consent of MTC Engineering Sdn. Bhd..
CONSTRUCTION
PRESSURE VESSEL
This document is the property of MTC Engineering Sdn. Bhd. and shall not be either reproduced or copied in whole or in part or
communicated to any third party without the prior written consent of MTC Engineering Sdn. Bhd..
CONSTRUCTION
VESSEL INTERNAL
This document is the property of MTC Engineering Sdn. Bhd. and shall not be either reproduced or copied in whole or in part or
communicated to any third party without the prior written consent of MTC Engineering Sdn. Bhd..
CONSTRUCTION
INLET HEATER
1. Material arrival
This document is the property of MTC Engineering Sdn. Bhd. and shall not be either reproduced or copied in whole or in part or
communicated to any third party without the prior written consent of MTC Engineering Sdn. Bhd..
CONSTRUCTION
INLET HEATER
This document is the property of MTC Engineering Sdn. Bhd. and shall not be either reproduced or copied in whole or in part or
communicated to any third party without the prior written consent of MTC Engineering Sdn. Bhd..
CONSTRUCTION
INLET HEATER
3. Hydrotest
This document is the property of MTC Engineering Sdn. Bhd. and shall not be either reproduced or copied in whole or in part or
communicated to any third party without the prior written consent of MTC Engineering Sdn. Bhd..
CONSTRUCTION
STRUCTURAL
1. Material arrival
This document is the property of MTC Engineering Sdn. Bhd. and shall not be either reproduced or copied in whole or in part or
communicated to any third party without the prior written consent of MTC Engineering Sdn. Bhd..
CONSTRUCTION
STRUCTURAL
This document is the property of MTC Engineering Sdn. Bhd. and shall not be either reproduced or copied in whole or in part or
communicated to any third party without the prior written consent of MTC Engineering Sdn. Bhd..
CONSTRUCTION
STRUCTURAL
6. Final coat
This document is the property of MTC Engineering Sdn. Bhd. and shall not be either reproduced or copied in whole or in part or
communicated to any third party without the prior written consent of MTC Engineering Sdn. Bhd..
CONSTRUCTION
STRUCTURAL
CONSTRUCTION
STRUCTURAL
This document is the property of MTC Engineering Sdn. Bhd. and shall not be either reproduced or copied in whole or in part or
communicated to any third party without the prior written consent of MTC Engineering Sdn. Bhd..
CONSTRUCTION
PIPING
1. Material Arriving
This document is the property of MTC Engineering Sdn. Bhd. and shall not be either reproduced or copied in whole or in part or
communicated to any third party without the prior written consent of MTC Engineering Sdn. Bhd..
CONSTRUCTION
PIPING
3. Hydrotest
4. Painting
This document is the property of MTC Engineering Sdn. Bhd. and shall not be either reproduced or copied in whole or in part or
communicated to any third party without the prior written consent of MTC Engineering Sdn. Bhd..
CONSTRUCTION
ELECTRICAL AND INSTRUMENTATION
This document is the property of MTC Engineering Sdn. Bhd. and shall not be either reproduced or copied in whole or in part or
communicated to any third party without the prior written consent of MTC Engineering Sdn. Bhd..
CONSTRUCTION
ASSEMBLY WORKS
This document is the property of MTC Engineering Sdn. Bhd. and shall not be either reproduced or copied in whole or in part or
communicated to any third party without the prior written consent of MTC Engineering Sdn. Bhd..
This document is the property of MTC Engineering Sdn. Bhd. and shall not be either reproduced or copied in whole or in part or
communicated to any third party without the prior written consent of MTC Engineering Sdn. Bhd..
PART 3
COMMISSIONING
This document is the property of MTC Engineering Sdn. Bhd. and shall not be either reproduced or copied in whole or in part or
communicated to any third party without the prior written consent of MTC Engineering Sdn. Bhd..
COMMISSIONING
The function test and continuity test for all instruments in the EWT
Module.
The main equipment is HART communicator
This document is the property of MTC Engineering Sdn. Bhd. and shall not be either reproduced or copied in whole or in part or
communicated to any third party without the prior written consent of MTC Engineering Sdn. Bhd..
PART 4
LESSON LEARNT
This document is the property of MTC Engineering Sdn. Bhd. and shall not be either reproduced or copied in whole or in part or
communicated to any third party without the prior written consent of MTC Engineering Sdn. Bhd..
ENGINEERING
No
2
3
ISSUE
Changing of heating medium
from steam to hot oil and
addition of fuel gas scrubber
IMPACT/LOSSES
-The date to start the
fabrication delayed almost
30 days due to changed on
the engineering.
-Need to carried out 2nd
HAZOP for the new design.
SUGGESTION
Finalize every single thing before
proceed to detail design and
avoid any re design works because
it will affect the schedule.
This document is the property of MTC Engineering Sdn. Bhd. and shall not be either reproduced or copied in whole or in part or
communicated to any third party without the prior written consent of MTC Engineering Sdn. Bhd..
FABRICATION
No
ISSUE
1 Lack of Manpower
Poor progress
2
monitoring
IMPACT/LOSSES
-They need to work in
extended hours and
implement the night shift
which will influence the
quality of the works.
-The schedule were affected
due to less commitment from
the fabricator
SUGGESTION
-Segregate this package into two part
which are pressure vessel and structural,
piping complete with assembly.
-A full time project engineer at site as a
compulsory requirement to our
contractor for the next project.
This document is the property of MTC Engineering Sdn. Bhd. and shall not be either reproduced or copied in whole or in part or
communicated to any third party without the prior written consent of MTC Engineering Sdn. Bhd..
THANK YOU
This document is the property of MTC Engineering Sdn. Bhd. and shall not be either reproduced or copied in whole or in part or
communicated to any third party without the prior written consent of MTC Engineering Sdn. Bhd..
Q&A
This document is the property of MTC Engineering Sdn. Bhd. and shall not be either reproduced or copied in whole or in part or
communicated to any third party without the prior written consent of MTC Engineering Sdn. Bhd..