1 Field Report Lanpooling in Chaurjahari
1 Field Report Lanpooling in Chaurjahari
Government of Nepal
Ministry of Urban Development
Department of Urban Development and Building
Construction (DUDBC)
NEW TOWN PROJECT COORDINATION OFFICE (NTPCO)
PREPARATION OF DPR & PARTIAL IMPLEMENTATION OF LAND POOLING PROJECT
OF CHAURJAHARI NEW TOWN
Field Report
Submitted By
GEOC Nepal P. Ltd./ECoCoDE Nepal P. Ltd./ Technocrat Consultancy P.
Ltd.in
New Baneshwor, Kathmandu
January 2016
TABLE OF CONTENTS
1.
INTRODUCTION......................................................................................................... 1-5
1.1
1.2
Background................................................................................................................ 1-5
Land Pooling: Brief Introduction with public Understanding........................................1-6
1.2.1 Land Pooling an introduction..................................................................1-6
1.3
1.4
2.
2.1
2.2
2.3
Geographical Description...........................................................................................2-7
Climate....................................................................................................................... 2-7
Physical and Social Infrastructures.............................................................................2-7
2.3.1 Road......................................................................................................2-7
2.4
2.3.2
Water Supply..........................................................................................2-8
2.3.1
Electricity................................................................................................2-8
2.3.2
2.3.3
Irrigation.................................................................................................2-8
2.3.4
Agriculture..............................................................................................2-9
2.4.3
2.4.4
2.4.5
Environmental situation........................................................................2-10
3.
3.1
3.2
3.3
3.4
3.5
3.6
3.7
Institutional Arrangements........................................................................................3-12
4.
4.1
4.2
4.3
4.4
4.5
4.5.2
Households..........................................................................................4-15
4.5.3
Natural Features..................................................................................4-15
4.5.4
Existing Roads-section.........................................................................4-15
4.6
4.7
4.8
4.9
4.10
5.
5.1
5.2
6.
7.
CONCLUSION.......................................................................................................... 7-22
FIGURES
Figure 3.1: Institutional Hierarchy................................................................................................. 3-13
TABLES
Table 1.1: Selected 10 New Towns..................................................................................................... 1-5
Table 2.1 : Household and Population of Bijeshowri VDC..................................................................2-9
Table 2.2 : Fertile area of the Bijeshwori VDC....................................................................................2-9
Table 3.1: Consultant's Major Field Visits..........................................................................................3-11
Table 3.2: Users' Committees........................................................................................................... 3-13
Table 4.1: Features of Project Area.................................................................................................. 4-14
Table 4.2: Land Use Pattern............................................................................................................. 4-14
Table 4.3: Land Ownership Status.................................................................................................... 4-15
Table 4.4: Present Land Value.......................................................................................................... 4-16
ANNEXES
Annex 1:
Annex 2:
Annex 3:
Minutes
Annex 4:
Drawings
o
Block Plan
Option I
Option II
Option III
ABBREVIATIONS
Cu.m
Cubic Meter
DDC
DUDBC
FGD
GoN
Government Of Nepal
GPS
HH
House Holds
IEE
MHH
MoPPW
MUD
NGO
PCO
TDC
UC
Users' Committee
VDC
Page 3
FIELD REPORT
January 2016
Page 4
FIELD REPORT
1.
January 2016
INTRODUCTION
1.1 Background
With the recent announcement of 72 new municipalities, there are 133 municipalities across
the country displaying that the urbanization process in Nepal is going with rapid pace. The
population growth rates in the urban (municipal) areas, are as high as 6% per annum, and is
roughly four times the average national population growth rate (1.35%) (CBS2068).
Simultaneously, the rapid urbanization has instigated a high demand of serviced land and
housing units including provision of physical, social and emergency amenities. Also the
urban growth of Nepal has been so rampant, haphazard and City concentrated that causing
serious degradation of environment making the living and working condition worse.
Moreover, the demand in most of rapidly developing cities including capital was so high that
the initiated process of supplying sufficient urban infrastructure and other facilities was
inadequate.
Thus, to respond to the unbalanced, rapid, haphazard and uncontrolled urbanization, as
well as the increasing demands of housing, infrastructure and other public amenities in the
cities of Nepal, the Government has decided to plan and build ten new towns in the junction
or in around 3 km distances of Mid hill highway (MHH) and North /south corridor roads
through New Town Project Coordination Office (PCO) under DUDBC, MUD. This initiation, in
addition, once it succeeds will help to mitigate the increasing trend of migration to the capital
and other rapid urbanizing cities with all its negative environmental and social
consequences. The New Towns will attract the population growth through planned
development in the upcoming years, by creating economically vibrant towns as a place to
live, work and entertain. This will delineate a rural urban boundary and create an
environment of city development with an integrated approach that consists of all physical,
social, economic and other anticipated urban facilities. To address the corresponding urban
spatial growth demands, land required for the road, drainage and water supply development
subcomponent will be managed through the mechanism of land pooling (LP) too. This is to
reduce haphazard development and urban sprawl and land speculation.
Thus as a long-term policy initiative, GON is providing technical and financial support to
study and implement different land development tools as a part of urban development
process in the designated 10 new towns. So efforts have been done to implement Land
Development Programs in the feasible areas of Chaurajhari, Rukum through Land Pooling
Programs with people's participation and cost recovery basis. Hence, the Consultant
prepares the Detail Planning Report (DPR) and Implementation Works of Land Pooling
Projects of Chaurjhari New Town.
The project aims to develop new cities which are given as follows:
Table 1.1: Selected 10 New Towns
S.
No.
Road
District
Tehrathum
Dhading
Tanahu
Baglung
Dailekh
Achham
Page 5
FIELD REPORT
January 2016
Baitadi
Rukum
Panchthar
10
Sindhuli
1. The Act under Section 3, gives power for integrated physical development of city in
reconstruction, further development in any parts of Nepal.
2. The act under Section 12 empowers the Town Development Committees for the initiation
and implementation land development for urban housing and development through
Guided Land Development (GLD), Site and Services and Land Pooling.
3. Under Section 16, the act has guiding provision for the involvement of various actors of
urban land development process.
Local Self Government Act 1999
Local Self Government Act 1999 is a policy of decentralization. The act empowers local
authorities to initiate especially the municipalities to land development activities relating to
guided land development, land pooling and site and services. It has also spelled the
involvement of private sector in local governance as a policy instrument.
Land Act of 1964 (for understanding of constraints related to land ownerships, tenancy
rights),
Land Acquisition Act, 1977 (for understanding of constraints related to land acquisition,
compensation.)
Land Pooling Reference Manual
Besides acts and policies, the overall process for the implementation of the land pooling
projects are described on the manual
Town development, urban planning and building-related basic guidance, 2072
Page 6
FIELD REPORT
January 2016
in particular about the future of their land that would now be subjected to instrument of land
pooling. Primarily, the hilly people, dependant largely on subsistence agrarian activities and
the demand of labor market at far away land for their economics, had not experienced the
planned urban living so far and the proposed land pooling project provides them with so far
inexperienced and unsolicited opportunity . Thus the public support for conducting land
pooling had been overwhelming as almost all landowners within the delineated project
boundary had expressed their support by signing the written consent paper along with a
copy of citizenship and landowner certificate. This support is achieved partly because of the
expectation that the land price with rise up significantly once the plots are serviced with
necessary infrastructure for planned urban living. Proposed land pooling project, as only a
small instrument of urban development under IDP preparation had been successful to win
the confidence of local people for the larger policy commitment shown by the central
government in the issue of urban planning and development. It is expected that with the
accomplishment of the project not only the land value of the land owners would but life
standard index of the inhabitants itself would go up because they would have access to
amenities of urban living which is designed to support healthy and prosperous living.
Based on the survey following suggestions are identified
About 90 % have positive response towards the landpolling project and ready to contribute
their lands for the project.
About 5 % have the doubtful responses and quite feels doubt on the successful
implementation of the project.
About 5 % have the mixed responses that means want to contribute for the landpooling but
fear of loss of agricultural lands.
On average overall all people have great enthusiasm on the project
2.
2.2 Climate
Chaurjahari is too hot in the summer time and too cold in winter. During the winter season
Chaurjahari is covered with misty fog which is visible from some VDC of surrounding district
of Salyan and Jajarkot that lasts till 10-11 am in the morning. The average annual highest
temperature is 290 celcius and minimum is 9.50 Celsius. Maximum rain here 61 millimeters
and minimum is zero and average rain in this VDC is 9.42 millimeters.
Road
Considered as a spine of the development process, the road transportation has been in
operation in Chaurjahari since last 3 years. There are two main road networks connecting
Bijeshwori VDC to headquarter of Rukum district, Musikot (Khalanga), and to Nepalgunj
through Sallibaazar. All the VDCs except 1, 8 and 9 are connected to road networks, and
these VDCs do not have access to road network because of the lack of political consensus.
Preparation of DPR and Partial Implementation
of Landpooling Project at Chaurjahari, Rukum.
Page 7
FIELD REPORT
January 2016
Chaurjahari had an airport as far back as 2029 BS and NAC had established its office, and
now Chaurjahari air service serves commercial flights for 2 times a week. A ring road,
encompassing the main market area and airport, construction has been started recently in
Chaurjahari.
2.3.2
Water Supply
Despite the fact that, millions have been spent time and again in water supply construction
and maintenance project with the support of ADB, local people are still facing the problem of
access to adequate quality drinking water. Increasing population and its growth rate along
with the poor maintenance services and high leakages, demand of sufficient of water supply
is still high in Chaurjahari. People of Chaurjahari commute far and spend hours collecting
water for domestic purposes. The main sources of water are mul, kuwa, padhera which are
been consumed by people and is not sufficient now. Also 793 households of ward no 3 to 7
have access to drinking water through Chaurjahari Drinking Water Plan office and this has
made life little better for those Households.
1
Electricity
Since 2047 BC, Vijeshwori hydro power company had been yielding 150KW of power and it
has been in operation under lease since 2055 BS. Electricity had been supplied to 650 HH,
but most of its customers are in the neighbouring Jajarkot district. Since two years micro
hydropower has not producing any power due to which people of Chaurjahari is compelled to
live in dark with limited solar power. Nowadays solar energy is the main source of power in
Chaurjahari night life.
2.3.3
After the telephone lines were closed during the Maoist insurgency period, VSAT line had
provided services in this VDC where at present people have been communicating through
CDMA, SKY, Namaste and NCELL. People coming from Jajarkot to access telephone
services now have to make a STD call in their own district. Since the rapid proliferation of
mobile technology people have not been using postal office present present at Chaurjahari.
The facility for communication is average in Bijeshwori New Town area.
2.3.4
Irrigation
Chaurjahari tar irrigation project, started in 2027 at Bijeshwori hilltop, covering an area of
1770 square meter, has its source point at setigaon khola muhan at ward number 3 and 4
and it is 19.5km long. This project was completed in 1934 BS. This project, although capable
of providing irrigation services to 600 hectors, local people had not been able to enjoy this
service easily. Despite the availability of sufficient fertile land, the inadequate irrigation
supply has turned those fertile lands into barren land.
2.3.5
Urbanizing Chaurjahari does not sign of proper settlement development. In the bazaar area,
nowhere we could see the provision for sewer lines. Local community had been raising the
demand for proper sewer disposal system in the entire town area. There is neither public
centralized sewerage network system for sewage collection nor sewage treatment plants for
sewage disposal. Most of the households have ordinary toilets with soak pits. Only few
household have managed safety tank and toilet.
Because of the lack of solid waste management, degrading urban environment has emerged
as important issue. The prevailing solid waste disposal from toilet includes pit system of
disposal. The state of drainage and other sanitation facilities are almost negligible. Solid
waste from kitchen and degradable matters are decomposed for manure, and other solid
wastes are either collected and burnt or disposed along the riverside. Thus, from the current
status of the VDC, provision of landfill site seems necessary.
Page 8
FIELD REPORT
January 2016
Spreading across 27.35 square km, the total population of Bijeswori VDC is 9847 and total
household 1646. The male population in the year 2011 is 5017 and the female population is
4830, such that the sex ratio is 90.8. The density of population in the Bijeshowri VDC is 3
persons per hectare and average household size is 4.65.
Table 2.1 : Household and Population of Bijeshowri VDC
Ward no.
Household no.
Population
Total
Male
Female
205
1193
639
554
196
1186
594
592
199
1191
596
595
243
1468
698
770
188
1239
637
602
181
1087
549
538
141
856
431
425
150
845
461
384
143
782
412
370
Total
1646
9847
5017
4830
Agriculture
Major economic activity of the people of this area is agriculture but some are also engaged
in trade and business activity. Major agricultural yield of this area includes maze, potato,
wheat, barley. Beside this, animal husbandry is also a major occupation in this region which
is yet to be commercialized and scaled up. In this regard, while the Bijeshwori VDC is largely
dependent on agriculture, Chaurjahari is developing as a market center that provides for the
needs of the surrounding areas. Likewise with the development of MHH the influx of people
in Chaurjahari is constantly on the rise.
Table 2.2 : Fertile area of the Bijeshwori VDC
Serial Number
Location
number)
1.
Chaurjahari wariwala
5,6,7
Vegetables,
potato,
paddy, maze, wheat
2.
Chaurjahari pariwala
3,4
Vegetables,
potato,
paddy, maze, wheat,
barley
3.
4.
Laharesimal, dabkhet
ward
Yielded crop
Page 9
FIELD REPORT
January 2016
potato, vegetables
5.
Khahare
6.
Amlatakura jyula
Education
Bijeshwori VDC has many social infrastructures. In Chaurjahari, there are 7 government
school, 6 private boarding schools, 1 higher secondary school and 1 campus. This shows
that there are sufficient schools and college within the project area.
Health
A Chaujahari Mission Hospital has been running in this VDC. This hospital serves people
from Rapti, Bheri, Karnali zone; especially for people of district such as Rukum, Salyan,
Jajarkot, Dolpa, Rolpa, and Surkhet. Initially established with capacity for 15 beds, now it
has a capacity of 40 beds and 37 staffs are working in this hospital including two doctors.
Also District Ayurved Hospital, Bijeshwori sub health post, and Uphela, and number of
medical halls are serving as health centres in the VDC.
2.4.4
Environmental situation
Bijeshwori VDC is mostly covered with forest. Chaurjahari is rich in Flora and Fauna.
Because of this the environment does not seem to appear as severely dilapidating but
however by being subjected to continuous population growth pressure and under the
pressure from the market forces that are making its presence felt in the Chaurjahari market
area, considerable proportion of environmental degradation can be observed. Especially the
mixing up of the sewerage and other waste in Jahari River and Bheri river is a matter of
concern. Ever increasing amount of waste disposed in the river and continuous and
unregulated exploitation of natural resource for extracting sand and aggregate from the river
belt has contributed to environmental degradation. Furthermore the increasing trend of
deforestation and lack of public toilets in bazaar area is another matter of concern which is
adding up to the degradation of the environment. Development of MHH has given impetus to
the growth and expansion of this market center. So even if environmental characters do not
seem to go out of proportion it is bound to be more problematic in future if proper measures
would not be taken.
Page 10
FIELD REPORT
3.
January 2016
Consultant Personnels
Field Progress
(Civil
Abinash Hamal
Abinash Hamal
From 2072-08-09 To Surendra
Maharjan
2072-08-17
(Civil Engineer)
Amir
(Architect)
Maharjan
Abinash Hamal
From 2072-09-23 To Surendra
Maharjan
2072-09-30
(Civil Engineer)
Abinash Hamal
Page 11
FIELD REPORT
January 2016
The Project area covers around 33.987 hectars as per the GPS survey along the boundary
of the LP site.
Objective
In order to confirm the project area, the GPS survey has been carried out. The survey was
generally aimed at the following:
i)
Area Calculation.
ii)
Page 12
FIELD REPORT
January 2016
Under the coordination of former Ward Chairman 15 membered users' committee was
created on the date 2072/08/12 under the presence of the mass of land owners, political
parties and teachers etc.
Table 3.2: Users' Committees
S.No
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Designation
Coordinator
Vice-Coordinator
Member
Member
Member
Member
Member
Member
Member
Member
Member
Member
Member
Member
Member
Name
Mr. Jhuse Bista
Mr. Kul Bahadur Bista
Mr. Daulat Bahadur Bista
Mr. Tek Bahadur Bista
Mr. Bhadre Giri
Mr. Lal Bahadur Bista
Mr. Bir Bahadur Giri
Mr. Gopal Lamichhane
Mrs. Chandra Kala Bika
Mr. Indre Bista
Mr. Jhup Bahadur Bista
Mrs. Pabitra Pun (Giri)
Mr. Tej Bahadur Gosai
Mr. Mote Giri
Mr. Tularam Sunar
Consultant
Page 13
FIELD REPORT
January 2016
4.
Remarks
Site Location
District
Rukum
VDC(past)/Municipality(currently
announced)
Ward Nos
/Present:
Accessibility
District Headuarters, Khalanga
40 Km
60 Km
Terrain
Plain
Description
Area (ha)
Percent (%)
Agriculture
30.03
85.01
4.03
11.41
Institutional
0.59
1.68
Page 14
FIELD REPORT
January 2016
0.67
1.90
Total
35.32
100.00
Area (sq.m)
Percent of Total
1.68
96.42
0.68
1.22
100
Total plots demarcated within the land pooling site is 1140. The average number of plots
holding by a land owner is around 3.5 based upon which the total number of land owners in
the within the LP site is around 300.
As per the TDC Act 12.1.1, to operate the land pooling program in an area requires
consensus of at least fifty one percent of local land owners and tenants. Abide by this clause
the consultant has collected 160 consensuses of the 300 land owners hence the further
processing for the land pooling in the decided LP site has been mandated. The detail list of
land owners' plots has been given at Annex 1.
4.5.2
Households
The project area has total households of 255 nos. mainly along the Chaurjahari-Salli Road
section, west boundary.
4.5.3
Natural Features
The Kahare khola named Dattule Khola runs along East-West direction of the project area
Average Gradient
: 0.7 %
Length
: 540 m
: 8.5 m
Page 15
FIELD REPORT
4.5.4
January 2016
Existing Roads-section
Formation Width
Pavement Condition
: Gravel
Formation Width
Pavement Condition
: Gravel
Average Width
Pavement Condition
: 6.0 m
: Earthen
Adjacent
to
GharigaunLamichanne Gaun Road
section, Sa near to Market
NRS 200,000.00
NRS 50,000.00
Along
GharigaunLamichanne Gaun Raod
section about 1km away of
NRS 100,000.00
NRS 25,000.00
Page 16
FIELD REPORT
January 2016
market
4.10 Challenges
The Consultant is facing a series of challenges that could continue to create constraints in
planning and implementation of the project. Some of the key challenges and considerations
for Consultant include:
Incomplete TDC
As TDC is the main actor of the project with the ultimate power and authority to take
decisions, formulate plans and policies regarding the implementation and management of
the project. But the Chaurjahari Town Development Committee is still incomplete till date
hence it surely going to be a challenge for the consultant to make important decisions and
consensus.
Lack of Coordination
An effective coordination is prerequisite for the successful and timely completion of the
project. The line agencies like New Town Development Project Coordination Office, Land
Revenue Department, Road Division are not well coordinated. The consultant alone rushes
for the consensus and coordination.
Technical Challenges
A 11 KVA electric line runs diagonally across the project area and making the consultant to
plan the area freely.
In addition the squatter houses along the west boundary making the plan little difficult
Airports
The Chaurjahari Airport will limit the height of buildings to be constructed.
VDC Ward Boundary
The project area encompasses two wards of Bijeshwari VDC; ward 3 and ward 4. On
account of which it has been producing technical constraint to plan the area freely.
Irregular and unshaped plots
As the existing plots are very length with narrow width, it seems to be difficult to hand over
the developed housing plots at the original location.
Cadastral maps and documents
The cadastral maps have errors due to smaller scale of maps, difficulty to match
adjoining sheets and errors of land records. Some of the parcel may not be registered or has
litigation or on mortgages. If the total area of the project and the summation of area of all
parcels as per the land records are same or more or less same, it will not be the problem. It
Preparation of DPR and Partial Implementation
of Landpooling Project at Chaurjahari, Rukum.
Page 17
FIELD REPORT
January 2016
there is some discrepancy between field measurement and record, certainly disputes will
occur.
5.
Ever since LP project has been announced people of the project area seemed to be very
enthusiastic and very much curious about the future plan of the area. On this regard
Consultants have been in regular consultation with the land owners, TDC professionals on
the making of conceptual plan of the Chaurjahari area.
There will be change in the land use pattern of the site than the previous land use pattern.
From the plan there will be increase in the road and free space area in the land use resulting
in the change of agricultural lands into housing plots.
1
The required physical facilities for the project site of area 30 ha will be planned as follows
a.
Road Network
In order to supply road facilities to each and every plots of the site, a road network plan has
been prepared. While planning the road network, the existing roads and other affecting
factors have been kept in mind.
In the road network plan three types of road have been proposed.
4m
6m and
8 m Road
b.
Drain Network
To catch the storm water surface drain along the sides of the roads will be proposed and the
drain network has been prepared which ultimately drains into the Duttele River.
c.
Open Space
Page 18
FIELD REPORT
January 2016
One object of the land pooling project is to provide required open spaces within the project
area. Generally the demarcated open spaces are proposed for social and green belts. Open
spaces increase the aesthetic value of the area. In addition the open space is the minimum
criteria of the propose land use plan of the propose land pooling plan.
In this planning the open spaces have not been proposed at separate location but have
been proposed on the either sides of the river. Land for open spaces will not be less than
5%.
d.
In the well and proper planned urban area, facilities like water supply, electricity and
telephone line is essential. In the present contest these facilities have been the prerequisite
of the modern urban life. Generally these facilities are provided by the concerned authorities
and line agencies. Hence it is suitable to initiate to invest on those facilities through the
related line agencies.
If it's decided to invest on such facilities through the project, definitely the contribution of the
landowners is going to be increase considerable which might hamper on the implementation
of the project. Hence it will be a wise decision to initiate for those facilities and other possible
works like blacktopping of roads through the concerned authorities.
The investment on the facilities will be equal to the amount of the sales plot. Detailed other
funding sources will be decided by the town development committee.
6.
2.0
3.0
1.2
1.3
Scope of Works
1.4
1.5
1.6
Study Methodology
Project site profile
3.1
Geo-Graphical Information
3.2
Administrative Division
3.3
Demographic Characteristics
3.4
Land Use
3.5
Municipal Infrastructures
3.5.1
Water Supply
3.5.2
3.5.3
3.5.4
Page 19
FIELD REPORT
4.0
5.0
6.0
January 2016
Project Boundary
4.3
4.4
4.5
Landowners Consensus
4.6
Issues on contribution
Institutional Framework
Block Plan Design and Housing Plot Analysis
6.1
Block Plan Concept Design
6.1.1
6.1.2
Planning Components
Land Use Plan
Infrastructure Development Plan
Road Network Plan
Drain Network
Open Spaces
Utility Services
6.2
6.2.1
6.2.2
Construction Cost
6.2.3
6.2.4
7.0
6.2.5
Issues on contribution
6.2.6
6.2.7
Implementation Strategy
7.1
Implementation schedule
7.2
8.0
Institutional framework
Recommendation
Page 20
FIELD REPORT
1.3
1.4
1.5
2.0
2.1
2.2
2.3
2.4
2.5
1.2.2
Settlement Patterns
1.2.3
Migration
1.2.4
Human Resources
1.2.5
Economic Status
1.2.6
Public consultation
Social mitigation and monitoring
Socio- economic and cultural issues
Environmental Assessment
Introduction
Methodology Adopted for this Study
Brief Description of Existing Environment
2.3.1 Bio-Physical Environment
2.3.2
Biological Environment
2.3.3
Land-Use
Public Consultation
Impact Identification, Prediction and Evaluation
2.5.1 Beneficial Impacts
2.5.2
2.6
2.7
2.8
January 2016
Adverse Impacts
Environmental Monitoring
Table Framework for environmental Management Plan
Costs for Executing the Environmental Management Action Plan
2.8.1 Specific Cost Details
2.8.2
1.3
2.
2.1
2.2
2.3
2.4
2.5
2.6
2.7
2.8
Cost Estimate
General
Costing Details
1.2.1 Unit Rates
1.2.2
Rate Analysis
1.2.3
Quantities
Cost Estimates
Economic Analysis
Introduction
Potential for poverty alleviation
Review of previous feasibility study
Construction costs
Land - economic costs
Economic Analysis Results
Distribution of benefits
Sensitivity tests
Page 21
FIELD REPORT
2.9
January 2016
Conclusion
7.
Index map
Proposed Land Use Map
Conceptual Block Plan - Bubble Map
Block Plans
Road Network Plan
Strom Water Drainage Network Plan
Plan, Profile and Cross section of Roads
Drawings of Typical structures
CONCLUSION
This report presents the field investigation of the Chaurjahari Land Pooling Project and also
presents the progress of the project development till date. Before presenting the Detailed
Engineering Report, the report provides a conclusion of the detailed site analysis undertaken
by the consultant. This analysis forms the basis for the preparation of the detail Landuse
Plan, Road Network Plan, Residential Plan, Green and Open Space Plan, Industrial Plan
and Infrastructure Plans on the selected Land Pooling site at Chaurjahari. Further, the report
gives the mandate for the further process of the Land Pooling Development Process.
Page 22
FIELD REPORT
January 2016
Page 23
FIELD REPORT
January 2016
Page 24