Time and Motion Studies
Time and Motion Studies
OPERATIONS MANAGEMENT
M. Adnan Madni
RMBA-FALL12-032
Fiza Murtaza
RMBA-FALL12-028
M. Waseem
RMBA-FALL12-024
M.B.A (3.5 Y)
Sec-B
PROGRAM:
Date:
17-Dec-2013
ACKNOWLEDGEMENTS
Project in any field of study is the kind of achievement for which every student is looking
for and thinking upon throughout his academic session that what it should be & how should it be
completed. It is definitely a keen desire of every student to full fill his requirement. It needs
through study untiring efforts, hard work with full devotion towards the cause and last but not
the least proper guidance and corporation from seniors and instructors.
We extend our gratitude to Prof. Nabeel Arif whose guidance, broadened vision and
his ample experience throughout the project served as a lighthouse in this incredible venture for
completion of the project.
Table of Contents
Acknowledgements........................................................................................................ 3
Abstract....................................................................................................................... 6
Introduction.................................................................................................................. 7
Work Study................................................................................................................... 7
Objective...................................................................................................................... 7
Benefits........................................................................................................................ 7
Method Study (Motion Study)......................................................................................... 9
Steps for Method Study Analysis (Motion Study)................................................................9
Select........................................................................................................................... 9
Record......................................................................................................................... 9
Examine..................................................................................................................... 10
Develop, Evaluate and Define........................................................................................ 10
Install......................................................................................................................... 10
Maintain..................................................................................................................... 11
Work Measurement (Time Study)...................................................................................13
Eight Steps of Conducting a Time Study..........................................................................13
Uses of Work Measurement (Time Study)........................................................................14
Techniques of Work Measurement (Time Study)...............................................................14
Requirements for Effective Time Study...........................................................................15
Tools for Time and Motion Study Analysis......................................................................16
Operation Process Chart................................................................................................ 17
Process Flow Chart...................................................................................................... 18
Flow Diagram............................................................................................................. 20
Travel Chart................................................................................................................ 21
Plant Layout............................................................................................................... 22
Fixed Position Layout................................................................................................... 22
Process Layout............................................................................................................ 23
4
Abstract
Time and Motion Study is rarely used in the industry now-a-days. This study using this
type of study method in order to increase production and identify any improvement that
could be made through identifying the process that involving manpower as the main reason
and state the time standard in order to achieve the objectives of increasing the production
and decreasing the cost. This study is using systematic observation, interview with discussion
and stopwatch time study. Statistically Fit and Production Modeller software is used to test
the data and make improvements. By stating the time standard for the process involving
manpower, production rate increase and the cost will be less. Other than that, proposal for
improvement could be made in order to enhance the effort to achieve the main objective
of any business organization in the world. We worked on it and did our best and after a
considerable performance and analysis, we became able to prepare this report.
INTRODUCTION
Work Study
Work Study introduces the most effective method of working. Work study is a means of
enhancing the production efficiency (productivity) of the firm by elimination of waste and
unnecessary operations. It is a technique to identify non-value adding operations by investigation
of all the factors affecting the job. It is the only accurate and systematic procedure oriented
technique to establish time standards. It is going to contribute to the profit as the savings will
start immediately and continue throughout the life of the product. Work study is conducted in
order to identify the current situation in the organization and to find the opportunities of
improvement. Basically Time Study is the technique of Work Measurement
of concept Work Study and the Motion Study also known as Method
Study is also the part of Work Study concept.
Objective
The objective of work study is to assist the management to obtain the optimum use of the
human and material resources available to the organization for the accomplishment of the work
for which, it is engaged.
Benefits
Work Study has many benefits. Some of them are as:
Increase in Productivity
Increase in Efficiency
Improved Work Flow
Improved Work Layout
Improved Standards
Work Study
Method Study
Work Measurement
Motion Study
Time Study
Higher Productivity
Work study is a generic term for those techniques, method study and work measurement
which are used in the examination of human work in all its contexts. And which lead
systematically to the investigation of all the factors which affect the efficiency and economy of
the situation being reviewed, in order to effect improvement.
Select
The selection of the work or service function, to be improved using method study, is
often based on the perception (awareness) of where the best and most economically rewarding
improvements can be achieved, but can also be driven (focused) by health and safety and other
considerations.
Record
The relevant facts about the task being undertaken (started) by direct observation and
collect such additional data as may be needed from the appropriate (suitable) sources.
Here we record what is happening now, in order to make informed decisions about how
best to improve the operation. The recording can be done in a variety of ways, depending on the
activity observed and the knowledge of the method study engineer.
10
11
Select
Work which can be studied in Economic Advantage
Record
All facts about the Job / Operation
Examine
The facts critically (Purpose, Place, Sequence, Persons)
Seek Alternatives, Simplify, Eliminate, Combine or Change
Develop
A Record of an Improved Method under Prevailing
Conditions Re-examine and Select the Best Method
Evaluate
Evaluate Different Alternatives to Developing a New
Improved Method Comparing the Cost Effectiveness
Define
Method, Procedure, Layout, Equipment Working
Conditions, Material, Quality Instructions
Install
The Improve Method, Plan Arrange and Implement
Maintain
Verify at Regular Intervals that the Improved Is In Use
6)
influences)
Compute the normal time for each task element:
7)
Sum the normal times for each element to develop a total normal time for the task
8)
13
Time study
Activity Sampling
Predetermined Motion Time Systems
Synthesis from Standard Data
Estimating
Analytical Estimating
Comparative Estimating
Above mentioned these techniques we shall concern ourselves primarily with time study,
15
16
17
18
Flow Diagram
A flow diagram is a drawing or a model substantially to scale, which shows the location
of the various activities carried out and tube routes followed' by workers, materials or equipment
in their execution.
20
Travel Chart
A Travel chart is a tabular record for presenting quantitative data about the movement of
worker, materials or equipments between any numbers of places over any given period of time.
By using this technique, we figure out the travelling frequency of materials or workers
between various departments. The departments having the most frequent travelling of worker or
materials are located very close to each other. The other departments are located on the same basis
of frequency of travelling.
Figure shows a sketch of the usage of this technique.
Moreover all the layout strategies are also included in motion and time study analysis to
measure the effectiveness of the plans developed for the improvement of the performance of
machinery either in human form or in material form.
Plant Layout and Materials Handling offer very good scope for improvements and cost
reduction. While developing improved methods it is necessary to give a careful consideration to
the layout and handling aspects. A poor layout involving' excessive movement of materials and
21
Plant Layout
Plant layout can be considered as the physical arrangement of industrial facilities. These
Facilities include
a)
b)
c)
d)
e)
f)
Buildings,
Equipment,
Workplaces,
Shortage points,
Offices, and
Employee facilities.
It should integrate all the factors affecting a layout and should be a best
Compromise
It should involve minimum movement of materials
There should be a continuous flow of work
The space should be effectively utilized
It should ensure satisfaction and safety for employees
It should be flexible to accommodate changes.
There are basically three types of layouts which are described as under:-
Process Layout
In a process layout all machines or process of the same type are grouped together. The
advantages of a process layout are
22
Product Layout
In a product layout the arrangement of machinery is according to the sequence of
operations of the product. Advantages of such a layout are
Less material, handling,
Less in-process inventories and
Reduced congestion and less floor space are occupied.
Manufacturing costs' ate low at high volume of production but the costs will be very high
at lower volumes of production. The capital investment on machines may be quite high and all
operation times need to be balanced. A breakdown on any one machine in the line may hold up the
complete production time.
A product layout will be economical when the volume of production is large, when the
product design is standardized and when the demand is fairly steady. Most of the layouts in
practice are combination of the above. It may be worthwhile to have a product type of layout for
some of the components and others may have a process layout depending on the various factors as
discussed above.
25
26
As we can see from the above given diagram, every effect has some causes and by
handling those causes, we can easily overcome various issues in the proper performance of the
various operations. So in case of Time and Motion Study analysis, if there is any issue arises will
be certainly the cause of an unhealthy action. So by handling that action will cause an effect
which is in good of the process.
27
Bibliography
http://healthit.ahrq.gov/health-it-tools-and-resources/time-and-motion-studies-database
http://www.scott-grant.co.uk/pages/time-and-motion.php
http://www.hai.co.za/Time_and_motion.php
http://methodstudy.co.uk/method_study_definition.htm
workstudy-measurement.blogspot.com
28