BBP Template

Business Blue Print - SAPMM Business process Details [ To-Be Process] Document ID: Prepared By: Reviewed By: Project Manager: Approved By SAP Project Business Blue print document.

Uploaded by

reddysd
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
547 views8 pages

BBP Template

Business Blue Print - SAPMM Business process Details [ To-Be Process] Document ID: Prepared By: Reviewed By: Project Manager: Approved By SAP Project Business Blue print document.

Uploaded by

reddysd
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 8

Project – SAP

Project Name:
Document Business Blue Print - SAP- MM
Name: Business process Details [ To-Be Process ]
Document ID: Version: 1.0
Project Manager:
Prepared By: Date: 10.02.2012
Reviewed By: Date: 00.00.0000
Approved By xxx Date: 00.00.0000
<Client Name>

SAP Project Page 1 of 8 Controlled Document


Business Blue print document © Copyright - Do Not Duplicate
Prepared by:
Project – SAP

Revision History

SR. VERSION DATE OF SECTION DESCRIPTION REASON CHANGE REVIEWED


FOR MADE BY BY
NO. NO. REVISION NUMBER OF CHANGE
CHANGE
1 1.0D 00.00.0000 Draft Version Project
Manager
2 1.0 00.00.0000 Final Version Project
Manager

SAP Project Page 2 of 8 Controlled Document


Business Blue print document © Copyright - Do Not Duplicate
Prepared by:
Project – SAP
Table of Contents
1.1 Existing Process General Explanation....................................................................................4
1.2 Explanation of Existing Functions & Events – Flow Sheet...............................................4

2 Requirements.........................................................................................................................4
2.1 Requirements & Expectations..............................................................................................4

3 Proposed Process.................................................................................................................6
3.1 Proposed Process General Explanation.............................................................................6
3.2 Explanation of Proposed Functions & Events..................................................................13
3.3 Special Organizational Considerations (start here for the Org structure).....................20
3.4 Change Management Issues..............................................................................................21
3.5 Description of Improvements.............................................................................................21

4 Functional Deficiencies.......................................................................................................21
4.1 Description of Functional Deficiencies.............................................................................21
4.2 Approaches for covering Functional Deficiencies of type..............................................21

5 Interface and Reports..........................................................................................................21


5.1 File conversion considerations..........................................................................................21
5.2 Interface considerations.....................................................................................................22
5.3 Operational Reports............................................................................................................23

6 Authorization Management.................................................................................................23
6.1 Authorization of User Roles...............................................................................................23

7 Disclaimer.............................................................................................................................23
7.1 Disclaimer.............................................................................................................................23

8 Process Sign-Off....................................................................................................................24

SAP Project Page 3 of 8 Controlled Document


Business Blue print document © Copyright - Do Not Duplicate
Prepared by:
Project – SAP
Existing Process

Sr. No Topics
1.1 Existing Process General Explanation

Common
1.2 Explanation of Existing Functions & Events – Flow Sheet

1. Organisation Structure -
2. Requisitioning and Ordering (MRP, PR, PO, Release, Consignment)
3. Mat Y Procurement (Batch Managment)
4. Internal Processes (Transfer posting -G, Stock Transfer-M, Physical Inv-G,
Scrapping-M, Vendor Return-M, WM)
5. Inbound Process (EDI, ASN Receipt, GR and Putaway, IV, Contracts)

2 Requirements

Sr. No Topics
2.1 Requirements & Expectations

A…

3 Proposed Process

Sr. No Topics
3.1 Proposed Process General Explanation
B…

3.2 Explanation of Proposed Functions & Events

C…

3.3 Special Organizational Considerations (start here for the Org structure)

3.4 Change Management Issues

N/A

SAP Project Page 4 of 8 Controlled Document


Business Blue print document © Copyright - Do Not Duplicate
Prepared by:
Project – SAP
3.5 Description of Improvements
D..

4 Functional Deficiencies

Sr. No Topics
4.1 Description of Functional Deficiencies

Not Identified.

4.2 Approaches for covering Functional Deficiencies of type

N/A

5 Interface and Reports

Sr. No Topics
5.1 File conversion considerations.
1. Dev-01
Addition of potency information in Idoc
2. Dev-02
Report to potency information

E…

SAP Project Page 5 of 8 Controlled Document


Business Blue print document © Copyright - Do Not Duplicate
Prepared by:
Project – SAP
5.2 Interface considerations

5.3 Operational Reports

SAP Project Page 6 of 8 Controlled Document


Business Blue print document © Copyright - Do Not Duplicate
Prepared by:
Project – SAP
6 Authorization Management

Sr. No Topics
6.1 Authorization of User Roles

7 Disclaimer

Sr. No Topics
7.1 Disclaimer

N/A

8 Process Sign-Off

Module Material Management


Process
Sub Process / No. n/a
Description

Project Consultant Core Team Process Owner Project Manager


Manager Member (Client) (Client)
(Client)

SAP Project Page 7 of 8 Controlled Document


Business Blue print document © Copyright - Do Not Duplicate
Prepared by:
Project – SAP

Project Manager Consultant Core Team Process Owner Project Manager


Name Name Member Name Name Name

SAP Project Page 8 of 8 Controlled Document


Business Blue print document © Copyright - Do Not Duplicate
Prepared by: