1. Introduction
1. Introduction
What is purpose of package unit instrumentation specification?
- To ensure that the instrumentation supplied as part of packaged
equipment systems is consistent with the plant instrumentation
requirement
- To covers the material, specifications, work, services and
responsibilities that shall be provided or executed by the Vendor
and by Purchaser for instrumentation associated with 'major
mechanical equipment' (Compressors, boilers, fired furnaces,
filters, lube oil systems, gas generators, etc.).
10
11
12
13
14
15
16
17
2. Guidance on option
selection
18
19
20
21
22
Power Supply:
Explosion Proof:
EEx-ia IIC T4 for Instrumentation & junction box. Ex-p (Type X) for Local
panel. If intrinsic safe certification is not available, then Flameproof (EExd
IIC T4) shall be used.
Weather Protection:
Electrical Connection:
Body material for all instruments and valves shall be equal to or better than the vessel/piping
material. 316 SS shall be used as a minimum for pressure gauge sockets/bourdon tubes, d/p
cell bodies, and for bodies of all non indicating transmitters.
Pneumatic Tubing: Typically 1/4" NPT (minimum) for control valves/316 Size/Material
stainless steel
Impulse Tubing:
24
25
27
28
29
30
31
32
33
34
35
Machines or Package Units shall be equipped with a PLC based control system (no relay
technique). The PLC with dual processor, dual power supply, dual I/Os (i.e. Redundant
CPU, Power supply & I/O cards) in general shall be provided. If Vendor has to supply a
PLC to control his machinery or package unit, the PLC shall be located in a suitable panel.
The method of control shall be clearly specified in the machine or package unit requisition
as well as be indicated on the interface sketches as part of the requisitions.
If the system is controlled by a Vendor PLC, the PLC shall be equipped with a serial
communication facility (Modbus) which will be connected to the plant DCS Wherever data
of the serial link will be used for calculations or non critical control loops, the serial link shall
be redundant. Commands (start, stop), trip or critical control loop signal shall always be
hardwired between DCS/SIS & package Unit.
Dual communication busses shall be used simultaneously, with automatic switch over to the
spare bus upon failure of the primary bus. The system shall automatically check both
busses and alarm on the failure of either one.
The serial link shall be completely commissioned in a so called integration test before
shipment of the PLC/Panel. Machines or units, which are controlled by the DCS The
package vendor has to supply suitable software description / specification as well as to
provide suitable descriptions / date for the programming and graphic design of the DCS.
The Graphic design of vendors control system shall be inline with purchasers Graphic
design specification .
Safety relevant systems can be integrated in the plant SIS system.
For DCS/SIS controlled machines or units, the Vendor shall execute functional test for the
control system to ensure that vendor can provide the requested guarantee for the overall
function and design of the machine and / package without split of responsibilities or
guarantees. All other requested tests (e.g. running test, performance test etc.) shall be
carried out by Vendor fully under Vendor responsibility.
In case a machine or unit requires special electronic devise (e.g. special burner
management system for package boiler, speed governor for steam turbines, anti-surge
controller for compressors, etc.) the electronic units are in the scope of the Vendor.
In general, any critical trip signal which lead to a plant trip shall be 2 out of 3 (triple field
instruments) and provided by vendor.
5.1 General Purpose Packages (Utilities IA Compressor / Nitrogen plant) for example
In general, Packages will be controlled by their own control system and shut-down safety
protection instrumentation. These shall allow for stand alone operation i.e. package start up,
shut down and continuous control. Packages shall be started (and stopped) from the package
interface panel. When the package is running in a steady state the local control set point may
be switched to remote and the main plant DCS will then take control.
The package control system can be in accordance with the following:
Packages shall be provided with fully redundant control and safety protection systems
(PLC) with respect to power feeders, internal power supplies (and power conditioning),
system processors, I/O cards (inclusive of backplanes / racks / cabling, process controllers,
communication cards etc) as a minimum.
36
41
42
43
45
47
and inspection
48
49
50
51
Thank you