RESUME
SUMMARY
Instrument Engineer with 4+ years experience in Instrumentation and Control
field.
Excellent knowledge in instrumentation specification and standard, P&ID, and
instrument/electrical design and drafting.
Experienced in developing PLC and ControlLogix software and HMI using
RSLogix5/RSLogix5000 and RSView32/Factory Talk view for client-server as
well as other Rockwell Software support program (RSLinx, RSEmulate,
RSTrend).
Have experience in project management and contract preparation.
PERSONAL DETAILS
Name
Date of Birth
Gender
Nationality
Marital Status
Passport No.
Passport Expiry Date
Address
Phone Number
:
:
:
:
:
:
:
:
:
YUNITA RACHMUDDIN
10th August 1980
Female
Indonesia
Married
A575795
16 September 2010
Jl. Incoiro No. 11, Sorowako, Sulsel, 91984
+62 811 423 800
Educational Qualification
University
Period of study
:
:
S1 (Electrical Engineering Faculty, sub study
Computer, Control, & Electronic Engineering)
Hasanuddin University, Makassar
August 1999 December 2004
EDUCATION
TRAININGS / SEMINAR ATTENDED:
English for TOEFL test, Hasanuddin University - 2003
Basic PLC Programming & Hardware, Hasanuddin University - 2004
RSLogix5000 for ControlLogix software programming, Rockwell Automation, Jakarta
2007
Factory Talk View SE project development, Rockwell Automation, Jakarta 2007
Basic Safety Training (JSA, LOTO, Risk Assessment, Confine Space, Working on Heights,
Safe Drive Training), Inco Sorowako
CARDAX training for operator and administrator, Sorowako 2008
Report Writing Class, Inco Sorowako 2007
Business English 2 course, Inco Sorowako 2007
RFID Asia 1st annual meeting, Jakarta - 2008
Resume of Yunita R.
Page 1
TECHNICAL SKILLS
Design and drafting control systems using AutoCAD
Computer Literate:
- Windows, MS Office, Visio, AutoCAD, MS Access, MS Project
PLC/ControlLogix based programming using RS/FT software
LANGUANGE & DEGREE OF PROFICIENCY
INDONESIA
ENGLISH
SPEAK
READ
WRITTEN
EXCELLENT
GOOD
EXCELLENT
GOOD
EXCELLENT
GOOD
EXPERIENCE SUMMARY
Employer Name
Period of working
Designation
: PT INCO, tbk
: January 2005 - Now
: Instrument Engineer
Engineering Experiences
:
Familiar with Standard and Code (ISA).
Piping and Instrument Diagram (P&ID) Review and Evaluation.
Instrument data sheet preparation.
Instrument Index and PLC I/O List preparation.
Bill of Material for Instrument/Electrical Bulk Material preparation.
Instrument/Electrical Design and Drafting.
Engineering Work Package (EWP).
QA/QC.
Electrical load calculation.
PLC and ControlLogix software and HMI development.
PROJECT DETAILS
1. Calcine Transfer Fugitive Emission Capture
Position: Instrument & System Design Engineer
Responsibilities:
Engineering Work Package preparation
Bill of material and specification review
Cable Schedule
Instrument drawings (Block Diagram, General Arrangement, Elementary Diagram,
Interconnection Diagram, Instrument Loop Diagram) design
Instrument drawing index preparation
RSLogix5 software development
Project Description:
The purpose of this project is to provide instrumentation and control system installation for CTS
#4 Ventilation system. The main ventilation system installation includes hood, dampers, ducting
and accessories will be covered in the mechanical and civil work package. The scope of
instrument and control work generally includes:
1. Installation of 7 (ea) three-way solenoid valves.
2. Installation of 6 (ea) lever-type limit switches.
3. Installation of junction box complete with terminal block.
4. Run and terminate signal cables.
5. PLC software programming.
Resume of Yunita R.
Page 2
2. Batch Plant Computer Review
Position: Project Engineer
Responsibilities:
Engineering Report preparation
Budget estimation
Bill of material and specification review
Project Description:
Review the computer system at PT INCOs Batching Plant for possibility to install new one and
how it will impact the operation. Generate report and offer solution to sponsor to improve
existing system operation.
3. Security project phase I - IV (Cardax system and Microwave Network)
Position: Project Engineer
Responsibilities:
QA/QC
Testing and commissioning
Bill of material and specification review
Contract preparation and review
Project management
Project Description:
This is an on going and long term project established by PT Inco to improve Security services
at almost every area in PT Inco operation, utilizing CARDAX (Card Access) and CCTVs. This
project also includes installing network infrastructure, i.e. microwave and fiber optic, and
building sophisticated Monitoring Room according to Australian Security Monitoring Standard.
4. Larona Generator #1 & #2 Replacement and Generator #3 Excitation System
Position: Project Engineer
Responsibilities:
Software development
Testing and commissioning
Bill of material and specification review
Contract preparation
Project management
Customer/factory acceptance test
Project Description:
This project mainly consist of 3 parts, i.e. Larona generator #1 and #2 refurbishment, and
Larona generator #3 excitation system (AVR) replacement. Main objectives are:
Replace each generator unit automation with a PTI standard ControlLogix controller.
Replace electro-mechanical governor with modern digital governor.
Incorporate the Unit Automation into the HMI control and Utilities Automation network.
Design and Install ControlLogix (CLX) unit automation cabinet similar to LGS#3 unit.
Design above system to handle heat flow to avoid overheating
Incorporate Governor IO into above ControlLogix system.
Develop Atlas GE software and hardware into above ControlLogix system.
Test and Commission
5. Kiln #5 Grizzly Cooling System
Position: Instrument Design Engineer
Responsibilities:
Engineering Work Package preparation
Bill of material and specification review
Cable Schedule
Instrument drawings (Block Diagram, General Arrangement, Elementary Diagram,
Interconnection Diagram, Instrument Loop Diagram) design
Resume of Yunita R.
Page 3
Instrument drawing index preparation
RSLogix5 software development
Project Description:
The discharge grizzly on Kiln #5 was cooled by high-pressure air from the plant-air system.
This method of cooling provides inefficient heat transfer, using a commodity that is expensive
to produce. The propose solution with this project is to provide a stand-alone low pressure,
high volume air blower connected to an intake header. The exhaust from the cooling system
will vent to atmosphere, as waste,
Instrument works covered in this project generally include:
Installation of temperature sensors and transmitters,
Installation of flow sensor and transmitter,
Installation of junction box,
Installation of PLC analog I/O module,
Run and terminate signal and power cable,
RSLogix5 software development,
Test and commissioning,
Mark-up drawings as built.
6. Fire Protection System at Project Refocus Building
Position: Project Engineer
Responsibilities:
Engineering Work Package preparation
Bill of material and specification review
Drawings (Block Diagram, General Arrangement, Elementary Diagram, Interconnection
Diagram) design
QA/QC
Test and commissioning
Project Description:
The scope of work generally includes:
Installation of electronic fire protection system consists of smoke detectors, manual pull
stations, alarm bell, and indicating light.
Installation of emergency lights.
Installation of exit sign lamp.
Installation of fire extinguishers
7. Fiber Optic and Telephone Cable Installation to Enggano Camp
Position: Design Engineer
Responsibilities:
Cost estimation
Engineering Work Package preparation
Bill of material and specification review
Layout drawing
HAZOP review
Contract preparation
QA/QC
Project Description:
Generally, work scopes covered by this project are:
To run 12/C Single-mode Fiber Optic cable approx. 4 km, overhead through existing and
new (3 ea) poles from FO junction box (FOIC-1) to EMD office at Enggano camp.
To run 12/C Single-mode Fiber Optic cable approx. 100 mtrs, overhead through existing
poles from EMD office to PPI office at Enggano camp.
To run 25-pr telephone cable approx. 150 mtrs, overhead through existing poles from
EMD to PPI office at Enggano camp.
Resume of Yunita R.
Page 4
8. Balambano Powerhouse AC Upgrade
Position: Instrument & System Design Engineer
Responsibilities:
Cost estimation
Material specification review
Instrument drawings (Block Diagram, General Arrangement, Interconnection Diagram,
Instrument Loop Diagram) design
HMI software development using RSView32
Project Description:
Balambano Hydro Power Generation Plant was built in 4 (four) stories building of main
services, up to down, that is generator floor, turbine or fan floor, spiral case or pump floor and
tube case floor. These all floors are consisting of some of the critical equipments and control
panels such as: excitation control panels, governor control panel, etc. which are, very
sensitive to the change of temperature. The normal temperature for panel control shall be
around 22 C to 25 C. It is reported there were several occurrences that equipment trip due
to high temperature.
The current air temperature on entire floors were measured and observed between 29C to 30
C. The temperature in the turbine feed even higher more than 38 C. The performance of the
fan is recently decreased and optimally can only cover half of the area.
This condition raised the following problems:
The fan can not cover the demand of cooling rate and flow for entire floors.
The existing supply fan can only cover half of the area, which are subjected not for
critical equipments or panel controls.
The people who work in these areas could not endure optimally when they are working
within period of 2 up to 3 hours due to high temperature. This condition is experienced
not comfortable to work.
Based on above conditions and problems generated thereby, additional air conditioning
services is significantly needed to supply adequate flow of cooling, especially for control panels
and equipments.
So the main objectives of this project are:
- To provide the proper flow rate of cooling in the area of generator floor, turbine or fan
floor, spiral case or pump floor and tube case floor, so that, the equipments and panel
controls can operate for their optimum service time.
- The workers who are working everyday in particular/certain area need the additional
air conditioner to get comfortable temperature.
- The air conditioning equipment shall be low operating cost, easily maintained and shall
be similar to the Larona air conditioning system.
- Modify the existing fresh air supply fan system to the area.
I herewith certify that all statements above are correct and true.
Sincerely Yours,
Yunita R., ST
Resume of Yunita R.
Page 5
Resume of Yunita R.
Page 6