This document summarizes the raw material calculations for a cement plant producing 5000 tons of clinker per day. It calculates that the plant will require 2,111,010 tons of limestone and 570,900 tons of clay annually. Over a 50 year period, the plant will need a total of 105,550,500 tons of limestone, which can be supplied by 302 quarries of size 5000 m2 and depth 50m. The annual limestone requirement will be 6 quarries. The clay requirement for 5 years will be 2,854,500 tons.

Uploaded by

Tamer Fathy
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
431 views

Raw Materials Calculations

This document summarizes the raw material calculations for a cement plant producing 5000 tons of clinker per day. It calculates that the plant will require 2,111,010 tons of limestone and 570,900 tons of clay annually. Over a 50 year period, the plant will need a total of 105,550,500 tons of limestone, which can be supplied by 302 quarries of size 5000 m2 and depth 50m. The annual limestone requirement will be 6 quarries. The clay requirement for 5 years will be 2,854,500 tons.

Uploaded by

Tamer Fathy
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

RAW MATERIALS CALCULATIONS

For 5000 t/day Clinker the Calculation of Raw Materials will be as follow:
Total Annual Clinker production

Ton/Day
5000

Ton/Year
5000 x 330 (day) = 1,650,000

Total Annual Raw Meal

Ton/Day

Ton/Year

based (on clinker factor = 0.60)

(5000 / 0.6) = 8335

1,650,000 / 0.6 = 2,750,000

Total Annual Raw Materials

Ton/Day
8335 x 0.92 x 1.1 = 8435

Ton/Year
2,750,000 x 1.1 x 0.92 = 2,783,000

Ton/Day
8435 x 0.7584 = 6397

Ton/Year
6397 x 330 = 2,111,010

Ton/Day
8435 x 0.2047 = 1730

Ton/Year
1730 x 330 = 570,900

based on convex factor = 0.92

Total Annual Limestone


Based on Raw Mix calculation (75.84%)

Total Annual Clay


Based on Raw Mix calculation (20.47 %)

Conclusion
The limestone required for (50 years operation) = 2,111,010 x 50 = 105,550,500 tons
Each quarry equal 5000 m2
According to the calculations, for limestone for 50 years in case we will use depth 50 m:
Each quarry = 5000 x 50 x 1.4 = 350,000 tons
The Limestone quarries required = 105,550,500 / 350,000 = 302 quarries/50 years
The Limestone quarries required = 2,111,010 / 350,000 = 6.0 quarries/ year
The Clay required for (5 years) = 570,900 x 5 = 2,854,500 tons/5years

Ahmed Mahmoud