Posco HR Notes
Posco HR Notes
2 Support processes
Interviewed with Ms. Mazlina and Mr. Azizi on the training process and the
process was found to be consistent with the documented procedure. All the new
staffs receive a general company induction briefing.
management identify and provide appropriate training for employees be it inhouse or via external training courses.
Recruitment & Selection
Process (PMSB-IMS-08). The TNA requested by the HOD and approved by the MD.
Training need analysis conducted as per documented procedure. Sampled and
verified the training needs analysis (Form No: PMSB-F-IMS-32, Rev: 01) dated 14 th
of
Statistical
Techniques, 7 QC Tools, Problem Solving Skills, ISO 9001 & 14001 Awareness and
Audit and Akta Pekerjaan which was requested by Mr. Muhamad Jasmin Samsudin
from the QA/QC department and approved by the general manager. Also
sampled and verified the training needs analysis dated 12 th of November 2014
for the training courses Changing Attitude and Mindset, Effective Problem Solving
and Decision Making Skills, Managing Office Records and Files Effectively, Kursus
Pembangunan Kompetensi untuk Kerani dan kakitangan pentadbiran, Forklift
Safety,
Effective
Inventory
Planning
&
Control
and
Store/Warehouse
Rating Point
100%
98%
100%
98%
Target Min: 70% meet the target data collected reviewed during Management
Review Meeting
Observed the Incoming Inspection practices were consistent as per the
documented procedure (Incoming & Receiving Control Process) PMSB-WH-01
performed by: En. Amirul all the inspection is based on sampling plan and visual
inspection for the following Delivery Order observed
Supplier: Kong Long Huat Chemical S/B
Delivery
Number:
WDO040145
PO
No:6577
Item: Suiphuric Acid (H2SO4) 89%
Qty : 1700Kg
No:6763
Item : Metallic Sheet Plates 32 x 0.8mm O/L Seal (1K/CN)
Qty :1000ea
Verified the calibration process which was found to be consistent with the
documented procedure Equipment Control Process (PMSB-IMS-10). Observed the
Master List of calibration record updated on the 10th June 2015 , Calibration
Record and Calibration Schedule in place. Sampled and verified calibration
records for the instrument Digimatic Micrometer manufactured by Mitutoyo with
model number 395-271, serial number 65251404, control number C1277E with
range 0 to 25 mm, resolution 0.001 mm, measurement uncertainty 0.002 mm
and coverage factor k =2, calibration dated 9th July 2015 and due 9th July 2016
with certificate number PSYP-1533354 and calibration done using the reference
standard Gauge Block (CA03328, PSYP-1427793) which is traceable to the NML
standard. Calibration done by Pyrometro Services (M) Sdn. Bhd. which is a MS
ISO/IEC 17025 certified calibration lab with SAMM number 011. Also sampled and
verified calibration records for the instrument Analytical Balance manufactured
by AND with model number GR-200, serial number 14219909 with maximum
range 210g, resolution 0.0001g and measurement uncertainty 0.0002g,
calibration dated 1st June 2015 and due 1st June 2016 with certificate number
SM15435968 and calibration done using the reference standard Standard Weight
Set Stainless Steel (WS053) which is traceable to the NML standard. Calibration
done by Sendi Mahir Sdn. Bhd. which is a MS ISO/IEC 17025 certified calibration
lab with SAMM number 082. Also sampled and verified the calibration of the Coil
Weighing of brand Mettler Toledo, model KINGBIRD, serial number 00938276MH,
sticker number 0025, capacity 20000kg and readability 10kg calibration dated
22nd June 2015 and next calibration due on 21 st October 2015 with reference
number SR 0068 and certificate number CC 10923, the calibration done with
standard weight set (PWS26 PWS50) with certificate number 3624545-3624569
and OIML class M2 that is traceable to the Metrology Corporation Malaysia Sdn
Bhd (499924-K).