Housing Project Process Guide
Housing Project Process Guide
The greatest possible care has been taken in compiling this guide, and in
ensuring that it is an accurate interpretation of the housing policy. It may
be possible, however, that there are differences in how the housing policy is
applied from province to province, and consequently differences in approach
to those noted here may not be relevant for some provinces. The National
Department of Human Settlements can not take any responsibility for how
the policy is applied from province to province. It is recommended that
provincial differences in approach be determined before using this guide to
embark on a project.
Users of this guide will accordingly use it at their own risk and The National
Department of Housing will not be liable for any damages whatsoever that
may be suffered by any user of this guide arising out of any direct or indirect
reliance placed on the content of this guide.
ABBREVIATIONS
CLARA
DFA
EIA
EIAP
EMP
ESTA
GP
General Plan
IDP
IPILRA
IRDP
LEFTEA
LDO
MEC
NDoHS
NHBRC
PHD
ROD
RSDF
SDF
TABLE OF CONTENTS
PART ONE
Introduction
10
PART TWO
Flow Charts
13
14
16
18
Project Schedule
34
INTRODUCTION
The Department of Human Settlements and the National
Programme
project.
Housing Programme
Description
Financial
Institutional Subsidies
Social Housing
Community Residential Units
Rural Housing
Programme
dwellers worldwide.
equitable basis.
In
order
to
support
the
implementation
of
the
residence permit.
serviced site.
also be satisfied:
low, middle and high income groups. The land use and
assessment.
clinics;
uses.
etc.
applications.
criteria:
all its citizens and in particular the poor who flock to cities
certain conditions;
housing.
Applications for the following people may be
Experience has shown that access to basic services,
Persons
circumstances.
who
have
previously
received
housing
a final phase.
commitments.
be achieved.
housing subsidies.
Furthermore,
10
annually announced;
Programme;
Important considerations
Programme.
finances.
namely:
confirmation of the fact that the land has been occupied for
Reform;
promulgation of CLaRA).
Municipalities;
Traditional Councils; and
The Land Administration Committee (after the
11
12
The flow charts cannot show all the links, as it would clutter
explicitly shown.
Most projects require all the steps in the flow charts, but
terminology varies.
ICON
DESCRIPTION
This icon signifies that a sub-process would normally be required.
This icon signifies that an action, document or sub-process would be required to complete a
specific task.
This icon signifies the initiation of a specific phase.
This connector represents the flow process from one activity to another. Black connectors
represent the main process flow.
Coloured connectors contextualises the flow between phases and should not be used as a
short-cur procedure.
13
Feasibility Process
Housing Chapter in IDP
Status Quo
Appoint Core
Team
Negative
Positive
IRDP
Brownfields
Identified
Land
Legal
Development
Status
Secure
Ownership
of Land
(if required)
No
Non-compliance
Statutory
Assessment
In situ
upgrading
No
Land Surveyor:
Base map
Town Planner:
Layout Plan
Engineer:
Availability of services reports
Physical
Investigation
14
Public
Participation
Yes
Procurement Method
Land
Register
UISP
Greenfields
Yes
Market
Analysis
Planning Process
Municipality
requests project
enrollment with
NHBRC
Finalize
Development
Scope
Turnkey Strategy
Traditional Preplanned
Contractual
Matters
C
Environmental
Practitioner: EIA application
Geotechnical Engineer:
Geotechnical investigation
Source Base
Documents
Contractual Matters
Development Contract
Turnkey:
One contractor or where ad
hoc specialist are required 3
phases are provided.
- Town Planning
- Installation of Services
- Construction of Houses
Traditional Preplanned:
What is the in-house capacity?
- Ad hoc contracts with
specialists as and when
required
Proclamation
of Township
Close-out
Phase
Amend TPS
Open Township / Subdivision
register at the Registrar
of Deeds and compile
and handover of deeds to
beneficiaries
Conveyancer
Close-out
Phase
Pegging of stands
Surveyor
Close-out
Phase
Team
Discharge conditions of
establishment / conditions of
approval
Close-out
Phase
Post Approval
Phase
Approval documents
comprise of:
1. Approved layout plan /
subdivision plan
2. Approved Conditions of
Establishment / Conditions of
approval
Close-out
Phase
Approval of
Township
Negative
Positive
Obtain Comments
Statutory Advertisement
Advertisement
of Application
Site
preparation
(where
necessary)
Relocation
of people
Beneficiaries
Subsidy Process
Subsidy
Application
approval
Allocation
of houses
Occupation
of houses
and title
deed
handover to
beneficiaries
Handover of Project
Implementation
Process
Construction
Engineering
Services Design
- Bulk Earthworks
- Install Services
- Construct Streets
- Handover of
services
- Site Supervision
Obtain
Clearance
Certificates
Close-out
Phase
Completion
and Handover
of services to
Council
House Construction:
- Submit building plans
- Approved building
plans
- House Construction
Building Inspection:
- Foundation certificate
- Structural certificate
- Occupation certificate
Circulation of
Application
Preparation
and Submission
of Application
Amend
application
Contractual Matters
Development Contract:
Use community contractors:
Two types of contracts allowed
for:
Documented
proof of all the close-out
phases during project
life cycle
Close-out
Phase
Close-out
Phase
Completed
Top Structure
Close-out
Phase
Occupation
Certificates
Distribution of Layout to
project team
Prepare final
drawdown
Submit
drawdown
to MEC
Payout
Process
- Installation of Services
- Construction of Houses
15
CLaRA Process
CLaRA
Minister
establishes
Land Rights
Board
Community
establish Land
Administration
Committee
Minister
appoint Land
Rights
Enquirer
Municipality assesses
application and make
recommendations to MEC
Determination by Minister
Communal
Land
Individual
Ownership
Community
applies to
municipality
PHD
evaluates
application and
submits to
MEC
Combination
Municipality secures
procurement of services
of implementing agent /
support organisation
Application not
Recommended
Application
Recommended
Application
Refused
Application
Approved
Feasibility Process
Completed
CLaRA
process
Contractual
Matters
C
Status Quo
Finalize
Development
Scope
16
Development Contract:
Use community contractors:
Two types of contracts
allowed for:
- Installation of Services
- Construction of Houses
Implementation
Process
Planning Process
Identified
Land
PHD evaluates
project application
and if complaint with
policy prescripts
submit to MEC
Legal
Development
Status
Determine
Land Rights
MEC
approves project
application
Construction
Engineering
Services Design
- Bulk Earthworks
- Install Services
- Construct Streets
- Handover of
services
- Site Supervision
Where
Applicable
Land Affairs
to approve
development
on State
owned land
Statutory
Assessment
PHD checks
information and
tests against
database
Beneficiaries
Subsidy Process
Subsidy
Application
approval
Project agreement
concluded
Allocation
of houses
New constructed
houses registered
with NHBRC
Where
Applicable
Implementing agent /
supporting organisation
prepares and submits
project application to
MEC
Physical
Investigation
Handover of Project
Land Surveyor:
Base map
Distribution of
Layout to project
team
Documented
proof of all the close-out
phases during project
life cycle
Engineer:
Availability of services reports
Environmental
Practitioner: EIA application
Geotechnical Engineer:
Geotechnical investigation
Close-out
Phase
Close-out
Phase
Completion
and Handover
of services to
Council
Where
Applicable
House Construction:
- Submit building plans
- Approved building
plans
- House Construction
Building Inspection:
- Foundation certificate
- Structural certificate
- Occupation certificate
Where
Applicable
Town Planner:
Layout Plan
Source Base
Documents
Occupation
of houses
and title
deed
handover to
beneficiaries
Obtain
Clearance
Certificates
Where
Applicable
Close-out
Phase
Completed
Top Structure
Close-out
Phase
Occupation
Certificates
Prepare final
drawdown
Submit
drawdown
to MEC
Where
Applicable
Payout
Process
17
followed.
Procurement Strategy
Yes
No
Yes
Does the Developer intend to
appoint community contractors for
different steps of the programme?
No
No
TURNKEY STRATEGY
The turnkey Contractor is appointed
by the Developer through a public
tender to do all the work related
to the successful completion of the
project.
- Planning of approved land;
- Township establishment process;
- Design and installation of internal
reticulation services and the
construction of houses
18
TRADITIONAL PREPLANNED
Professional and contracting services
may be provided in-house or procured
through public tenders.
- The Developer has the flexibility to
appoint and brief professionals and
to manage the process of development in a hands-on manner.
- Contractors undertake construction
by making use of the comprehensive
designs issued by the developer.
Please note: the Developer may
apply the turnkey strategy within this
strategy and award development rights
through a tendering process.
RISK: Developer carries the risk for
any financial overruns.
Yes
DEVELOPMENT CONTRACT
Community Contractors are
contracted / appointed through
public tenders
This strategy permits the community
to participate in development to the
extend that they are able to do so.
Incomplete
Unacceptable
Complete
Unacceptable
Is site underlain
by dolomites?
Yes
No
Acceptable
NHBRC grants in-principle enrollment and advises the
Home Builder in writing and notifies MEC of any conditions
Developer prepares
feasibility study and submits
to NHBRC
No
Is Home Builder
registered?
Yes
Is the
NHBRC unduly
exposed to the
aspects of the
project?
No
19
REFERENCE TABLE
Ref
Task or item
1
MEC Receives Provincial
Housing Subsidy Allocation
from National
20
Notes
Responsibility
NDoHS /
MEC /
Provincial Department of
Human Settlements
Developer (Municipality as
implementing agent)
MEC /
Municipality
Developer /
Land owners /
Municipality
Developer /
Municipality
Developer /
Municipality
MEC
REFERENCE TABLE
Ref
Task or item
Notes
Responsibility
NHBRC /
Developer
Municipality
requests project
enrollment with
NHBRC
9
10
11
NHBRC /
Developer
MEC /
Municipality /
Developer
Developer /
Municipality
Turnkey Strategy
Developer /
Municipality
Traditional Preplanned
Developer /
(Town Planner) /
Municipality
Development Contract
Developer /
Municipality
Memorandums of Understanding /
Undertakings / Agreements / Contracts
MEC /
Municipality (developer) /
NHBRC /
Community /
NGOs /
CBOs /
Contractors
12
13
14
15
Contractual
Matters
21
REFERENCE TABLE
Ref
Task or item
Notes
Responsibility
Project Manager
Developer /
Professional Team
Feasibility Process
Developer
Developer
Status Quo
Developer
Developer /
Municipality
Appoint Core
Team
16
C
17
18
19
20
21
22
REFERENCE TABLE
Ref
Task or item
Notes
Responsibility
Developer
Developer
Developer /
Project Team
Planning Process
In situ
upgrading
Professional Team /
Town Planner
Town Planner
Town Planner /
Municipality /
CBOs /
Community
22
Market
Analysis
23
Finalize
Development
Scope
24
25
26
Public
Participation
27
Land
Register
23
REFERENCE TABLE
Ref
Task or item
Notes
28
Legal
Development
Status
29
Secure
Ownership
of Land
(if required)
30
Statutory
Assessment
31
Physical
Investigation
32
Source Base
Documents
Land Surveyor:
Base map
Town Planner:
Layout Plan
Engineer:
Availability of services reports
Environmental
Practitioner: EIA application
Geo-technical Engineer:
Geo-technical investigation
24
Responsibility
Lawyer /
Determine legal framework for obtaining
Legal Advisor /
the proposed land use rights and / or
Conveyancer
current legal status of the settlement as
well as specific constraints in terms of the
current legislative frameworks and title deed
restrictions.
Lawyer /
Determine the current ownership/vesting
Conveyancer
of the land in question, i.e. National
Government (State), Provincial Government,
Municipality or Private (individual / company
/ trust etc.).
Investigation and assessment in terms of
compliance of the proposed development
against local statutory planning controls and
forward planning documents (SDF, RSDF,
LDO and Precinct Plans).
Town Planner
Town Planner /
Land Surveyor /
Lawyer /
Geotechnical Engineer /
Civil Engineer /
Electrical Engineer /
EIA consultant, et al
REFERENCE TABLE
Ref
33
Task or item
Notes
Responsibility
Town Planner
Town Planner
Town Planner /
Urban Designer /
Engineer
34
35
Distribution of Layout to
project team
36
Preparation
and Submission
of Application
Town Planner
Once the relevant procedure, Act or
Ordinance was chosen (best suited for the
anticipated development and location) the
Town Planner prepares and submits an
application to the relevant authority/tribunal.
Municipality /
Development Tribunal /
Town Planner
Circulation of
Application
Applicant /
Authority
37
38
Advertisement
of Application
25
REFERENCE TABLE
Ref
Task or item
Notes
39
Obtain Comments
40
41
Close-out
Phase
Approval of
Township
42
Close-out
Phase
26
Responsibility
Town Planner /
During Item 35, the application was
circulated to various authorities, bodies and Project team /
Developer
interested and/or affected parties. It is the
prerogative of the entire project team to
obtain (as quick as possible) formal feedback
from the relevant affected parties through
personal consultation, discussions and
negotiations of requirements and conditions
to be imposed.
Once all comments / objections in Item
37 were obtained, the applicant should
reply thereto by either accepting any
requirements / conditions and if so, it might
be necessary to make certain amendments
to the initial layout and application or reject
such objections / requirements / conditions.
In this case it will be necessary to determine
whether the amendment is material
(significant) or immaterial (insignificant)
where material go back to Item 31 if not
proceed and prepare final documents which
will include the final layout and conditions of
establishment. If there is a dispute, a site visit
and a formal public hearing will be held to
afford the parties the opportunity to submit
evidence or arguments to be considered.
Those can be tested by the other parties.
Town Planner /
Professional Team /
Planning Committee /
Townships Board /
Development Tribunal
Municipality /
Town Planner /
Project Manager
REFERENCE TABLE
Ref
Task or item
43
Post Approval
Phase
44
Close-out
Phase
Conveyancer
45
Close-out
Phase
Surveyor
46
Close-out
Phase
Team
Notes
Responsibility
Town Planner /
Professional Team /
Land Surveyor /
Conveyancing Attorney
Conveyancer
Surveyor
Professional Team
27
REFERENCE TABLE
Ref
Task or item
Notes
Responsibility
Town Planner
Town Planner /
Municipality
Amend TPS
It is a pre-proclamation condition /
requirement that the existing town planning
scheme must be amended to include
the township / subdivision in the town
planning scheme prior to the declaration
of the township and the amendment must
be published simultaneously with the
declaration of the township.
Conveyancing Attorney
Services Contractor
Professional Team /
Municipality /
Contractors
47
Close-out
Phase
Proclamation
of Township
48
49
50
Site
preparation
(where
necessary)
51
Relocation
of people
28
REFERENCE TABLE
Ref
Task or item
Notes
Responsibility
Implementation
Process
Professional Team
Local Municipality
Contractors
Civil /
Electrical /
Traffic Engineers /
Municipality
Engineering
Services Design
Engineers /
Contractors /
Municipality
52
53
54
- Bulk Earthworks
- Install Services
- Construct Streets
- Handover of
services
- Site Supervision
55
Obtain
Clearance
Certificates
Close-out
Phase
Conveyancer
29
REFERENCE TABLE
Ref
56
Task or item
House Construction:
- Submit building plans
- Approved building
plans
- House Construction
Building Inspection:
- Foundation certificate
- Structural certificate
- Occupation certificate
57
Close-out
Phase
Completion
and Handover
of services to
Council
58
Completion
Inspection
Close-out
Phase
59
Close-out
Phase
Notes
Responsibility
Architect /
Structural Engineer
Civil /
Electrical Engineers /
Architect /
Project Manager
Project Manager /
Contractor /
Architect
Contractor /
Architect /
Developer /
Municipality
Municipality /
PHD
Completed
Top Structure
60
Occupation
Certificates
61
62
63
64
30
Close-out
Phase
Beneficiaries
Subsidy Process
Subsidy
Application
approval
Allocation
of houses
Occupation
of houses
and title
deed
handover to
beneficiaries
Conveyancer /
Municipality /
PHD
REFERENCE TABLE
Ref
Task or item
65
Handover of Project
66
Documented
proof of all the close-out
phases during project
life cycle
67
68
Prepare final
drawdown
Submit
drawdown
to MEC
69
Payout
Process
70
71
72
73
Responsibility
Project Manager /
Contractor /
PHD
Project Manager
Project Manager /
Developer
Developer /
Project Manager
NDoHS,
PHD,
Municipality &
Contractors
Community /
NDoHS /
PHD /
Municipality
Municipality
Community
PHD
MEC
CLaRA Process
Community confirms the
need for housing - Need is
communicated to traditional
council / municipality
Municipality confirms project
part of Housing Chapter of
IDP and funding reservation
agreed with MEC
Community applies to the
municipality to appoint
implementing agent /
supporting organisation
74
PHD
evaluates
application and
submits to
MEC
75
Notes
Application
Approved
31
REFERENCE TABLE
Ref
76
Task or item
Municipality secures
procurement of services
of implementing agent /
support organisation
77
Notes
Responsibility
Municipality
PHD
Implementing Agent
PHD
MEC
PHD /
Municipality
NDOH /
PHD /
Municipality
NDoHS /
PHD /
Municipality
NDoHS /
PHD /
Municipality
PHD checks
information and
tests against
database
78
Implementing agent /
supporting organisation
prepares and submits
project application to
MEC
79
PHD evaluates
project application
and if complaint with
policy prescripts
submit to MEC
80
MEC
approves project
application
81
82
83
84
32
REFERENCE TABLE
Ref
85
Task or item
Payment of subsidies
in accordance with
milestones
86
Notes
Responsibility
NDoHS /
PHD /
Municipality
Project is completed
NDoHS /
PHD /
Municipality
NDoHS /
PHD /
Municipality
NDoHS /
PHD /
Municipality
Project Completion
87
88
Contractual Matters
33
Project Schedules
The project schedule is also a generic schedule which
this Guide can use the schedule as a general tool to plan and
manage their projects, but the best use will be to utilise the
also the one area where a project can inter alia be accelerated
1. Housing process
34
2. Township establishment
35
3. Subsidy application
36
37
5. Application procedure
38
39
7. Sales administration
40
8. Land servicing
41
9. House construction
42
43
DEVELOPMENT CHECKLIST
No
44
Subsidy Application
1.1
1.2
1.3
1.4
1.5
1.6
1.7
1.8
1.9
1.10
1.11
Township Establishment
2.1
Identify land
2.2
Feasibility Studies
2.3
2.4
2.5
Conclude agreement
2.6
2.7
2.8
2.9
2.10
2.11
%
Complete
Days
Planned
Days
Completed
Days
Remaining
DEVELOPMENT CHECKLIST
No
%
Complete
Days
Planned
Days
Completed
Days
Remaining
Total Completion
3
3.1
EIA Application
3.2
Complete application
3.3
3.4
Peruse application
3.5
Submit application
3.6
3.7
3.8
Scoping phase
3.9
3.10
Site Assessment
3.11
3.12
3.13
3.14
3.15
3.16
3.17
Submit report to CA
3.18
Awaiting approval by CA
3.19
3.20
EIA Report
3.21
3.22
3.23
3.24
Draft EMP
3.25
3.26
3.27
3.28
3.29
Record of decision
3.30
Issue ROD
3.31
3.32
3.33
3.34
3.35
3.36
3.37
45
DEVELOPMENT CHECKLIST
No
46
4.1
4.2
Obtain Basemapping
4.3
4.4
4.5
4.6
4.7
4.8
4.9
4.10
4.11
4.12
4.13
4.14
4.15
4.16
Advertising application
4.17
4.18
4.19
4.20
4.21
%
Complete
Days
Planned
Days
Completed
Days
Remaining