Thermograph y Report
Thermograph y Report
re
i
DC
on
PreDiCon Engineering
Predictive Maintenance Report
Telephone:
Fax:
e-mail:
Report Date:
Report prepared by:
Wilmar House, 23-25 Windermere
Road
Blackpool FY4 2BX
Tel: +44 (0)1253 400541
Fax: +44 (0)1253 400552
email: [email protected]
Wilmar House
23-25 Windermere Road,
Blackpool FY4 2BX
tel: (01253) 400541
fax: (01253) 400552
email: [email protected]
Area
System
Location
re
i
on
PDC
PreDiCon Ltd.
Maintenance
Thermography
Work Request #
Customer
Priority No
Electrical Distribution
Priority Description
Substation #1
234
1
Within 2 days
Analyst
Ron Frend
Equipment
Transformer #3
Reports Date
20-Feb-02
Component
Connection Box
Inspection Date
20-Feb-02
Analysis and
Comments
Recommendations
While the body of the transfomer is no more than 35'C at any point, the top of the connection box
is showing a high temperature at over 57'C. The most probable casue for this high temperature is
a resistance connection inside the connection box.
Check the connection box internals as a matter of urgency and remake all electrical connections
therein.
Figure #1
Figure #2
59.0C
20
15.6C
Completion Date:
Comments on Completion
Sign Above
Issue Date
Please complete this form and return to PreDiCon on completion of work on Fax (01253) 400552
Wilmar House
23-25 Windermere Road,
Blackpool FY4 2BX
tel: (01253) 400541
fax: (01253) 400552
email: [email protected]
Area
System
Location
Maintenance
Priority No
Priority Description
235
3
When convenient
Analyst
Ron Frend
Reports Date
21-Feb-02
Inspection Date
20-Feb-02
Boiler House
Component
Recommendations
Work Request #
Electrical Distribution
EP713
Analysis and
Comments
Thermography
Customer
Equipment
re
i
on
PDC
PreDiCon Ltd.
The left most fuse on the upper bank is considerably warmer than all others.
The circuit should be checked for load. Then replace the fuse, clean the fuse clips and check
terminations for security.
Figure #1
Figure #2
Fuse: 33.0C
32.2C
32
30
Background: 27.9C
28
26
24
23.6C
Completion Date:
Comments on Completion
Sign Above
Issue Date
Please complete this form and return to PreDiCon on completion of work on Fax (01253) 400552
Wilmar House
23-25 Windermere Road,
Blackpool FY4 2BX
tel: (01253) 400541
fax: (01253) 400552
email: [email protected]
Area
System
Location
Maintenance
Priority No
Priority Description
Gearbox
236
2
Within 1 month
Analyst
Ron Frend
Reports Date
21-Feb-02
Inspection Date
20-Feb-02
Mill Room
Component
Recommendations
Work Request #
Conveyors
Elevator E4
Analysis and
Comments
Thermography
Customer
Equipment
re
i
on
PDC
PreDiCon Ltd.
The input shaft on this gearbox is hot at over 80'C. This is most likely indicative of a bad bearing
or possibly bad gears.
Figure #1
Figure #2
62.6C
Background: 19.0C
60
50
40
30
20
18.6C
Completion Date:
Comments on Completion
Sign Above
Issue Date
Please complete this form and return to PreDiCon on completion of work on Fax (01253) 400552
Wilmar House
23-25 Windermere Road,
Blackpool FY4 2BX
tel: (01253) 400541
fax: (01253) 400552
email: [email protected]
Area
System
Location
Maintenance
Priority No
Priority Description
Gearbox
237
3
When convenient
Analyst
Ron Frend
Reports Date
21-Feb-02
Inspection Date
20-Feb-02
Component
Recommendations
Work Request #
Mash Tuns
Discharge Screw
Analysis and
Comments
Thermography
Customer
Equipment
re
i
on
PDC
PreDiCon Ltd.
Even though the discharge screw was lightly loaded at the time of measurement, the input shaft
bearings were over 40'C. This is indicative of overloaded bearings or low oil level.
Check the gearbox oil level. If oil level is OK then overhaul the gearbox. On reassembly pay
particular attention to the mounting arrangement for the motor to avoid misalignment.
Figure #1
Figure #2
40.5C
Background: 26.2C
40
30
25
22.5C
Completion Date:
Comments on Completion
Sign Above
Issue Date
Please complete this form and return to PreDiCon on completion of work on Fax (01253) 400552
Wilmar House
23-25 Windermere Road,
Blackpool FY4 2BX
tel: (01253) 400541
fax: (01253) 400552
email: [email protected]
Area
System
Location
Maintenance
Work Request #
Priority No
Priority Description
Component
Motor
238
2
Within 1 month
Analyst
Ron Frend
Reports Date
21-Feb-02
Inspection Date
20-Feb-02
Cellar #2
Hot Liquor Ring Main Pump #1
Recommendations
Thermography
Customer
Equipment
Analysis and
Comments
re
i
on
PDC
PreDiCon Ltd.
The pump drive motor drive end bearing is relatively hot at over 50'C. This could be caused by
over greasing, misalignment or bearing deterioration.
Monitor the bearing temperature in the short term. Arrange to change the motor bearings and
carry out an alignment of the motor to the pump.
Figure #1
Figure #2
Background: 15.1C
54.2C
50
40
30
20
17.1C
Completion Date:
Comments on Completion
Sign Above
Issue Date
Please complete this form and return to PreDiCon on completion of work on Fax (01253) 400552
Wilmar House
23-25 Windermere Road,
Blackpool FY4 2BX
tel: (01253) 400541
fax: (01253) 400552
email: [email protected]
Area
System
Location
Maintenance
Priority No
Priority Description
Fuse 18
239
3
When convenient
Analyst
Ron Frend
Reports Date
21-Feb-02
Inspection Date
20-Feb-02
Switch Room G
Component
Recommendations
Work Request #
Electrical Distribution
Panel EP301
Analysis and
Comments
Thermography
Customer
Equipment
re
i
on
PDC
PreDiCon Ltd.
This fuse is warmer than all others on this panel. Cause may be load or a resistance connection
or even a bad fuse.
Check the load. If the load is low then replace the fuse and remake all connections including
cleaning the fuse clips.
Figure #1
Figure #2
27.4C
26
Background: 15.3C
24
22
20
18
16
14.1C
Completion Date:
Comments on Completion
Sign Above
Issue Date
Please complete this form and return to PreDiCon on completion of work on Fax (01253) 400552
Wilmar House
23-25 Windermere Road,
Blackpool FY4 2BX
tel: (01253) 400541
fax: (01253) 400552
email: [email protected]
Area
System
Location
Maintenance
Customer
Priority No
Electrical Distribution
Priority Description
Component
Transformer
240
2
Within 1 month
Analyst
Ron Frend
Reports Date
21-Feb-02
Inspection Date
20-Feb-02
Recommendations
Thermography
Work Request #
Equipment
Analysis and
Comments
re
i
on
PDC
PreDiCon Ltd.
The bottom right connection on the front of the transformer is hot almost 70'C while the
transformer is only 45'C. The pattern of heat distribution indicates a resistance joint in the
connection block.
Clean and retighten the connections.
Figure #1
Cable temp: 54.1C
Figure #2
65.7C
60
50
40
30
28.4C
Completion Date:
Comments on Completion
Sign Above
Issue Date
Please complete this form and return to PreDiCon on completion of work on Fax (01253) 400552
Wilmar House
23-25 Windermere Road,
Blackpool FY4 2BX
tel: (01253) 400541
fax: (01253) 400552
email: [email protected]
Area
System
Location
Maintenance
Customer
Priority No
Electrical Distribution
Priority Description
Component
Contactor CTR01
241
2
Within 1 month
Analyst
Ron Frend
Reports Date
21-Feb-02
Inspection Date
20-Feb-02
Recommendations
Thermography
Work Request #
Equipment
Analysis and
Comments
re
i
on
PDC
PreDiCon Ltd.
Connection 59 (behind connection 90) is hot. This is caused by a bad connection with the
consequent resistance causing an increase in temperature.
Figure #1
Figure #2
55.3C
50
Conn 59: 58.3C
40
30
25.8C
Completion Date:
Comments on Completion
Sign Above
Issue Date
Please complete this form and return to PreDiCon on completion of work on Fax (01253) 400552
Wilmar House
23-25 Windermere Road,
Blackpool FY4 2BX
tel: (01253) 400541
fax: (01253) 400552
email: [email protected]
Area
System
Location
Maintenance
Customer
Priority No
Electrical Distribution
Priority Description
Component
Connection 152
242
2
Within 1 month
Analyst
Ron Frend
Reports Date
21-Feb-02
Inspection Date
20-Feb-02
Recommendations
Thermography
Work Request #
Equipment
Analysis and
Comments
re
i
on
PDC
PreDiCon Ltd.
Connection 152 appears to have a resistance at the crimp causing a high temperature.
Figure #1
Figure #2
42.0C
40
35
30
25
24.1C
Completion Date:
Comments on Completion
Sign Above
Issue Date
Please complete this form and return to PreDiCon on completion of work on Fax (01253) 400552
Wilmar House
23-25 Windermere Road,
Blackpool FY4 2BX
tel: (01253) 400541
fax: (01253) 400552
email: [email protected]
Area
System
Location
Maintenance
Priority No
Priority Description
Contactor CR017
243
2
Within 1 month
Analyst
Ron Frend
Reports Date
21-Feb-02
Inspection Date
20-Feb-02
Component
Recommendations
Work Request #
Electrical Distribution
Analysis and
Comments
Thermography
Customer
Equipment
re
i
on
PDC
PreDiCon Ltd.
The overloads on this contactor are very hot at over 100'C. This indicates that the overloads are
nearing the end of their life.
Figure #1
Figure #2
91.8C
80
60
Overload: 100.9C
40
20.2C
Completion Date:
Comments on Completion
Sign Above
Issue Date
Please complete this form and return to PreDiCon on completion of work on Fax (01253) 400552
Wilmar House
23-25 Windermere Road,
Blackpool FY4 2BX
tel: (01253) 400541
fax: (01253) 400552
email: [email protected]
PreDiCon Ltd.
PDC
re
i
on
235
236
Location
Equipment
Component
Substation #1
Transformer #3
Connection Box
Boiler House
EP713
The circuit should be checked for load. Then replace the fuse,
clean the fuse clips and check terminations for security.
Mill Room
Elevator E4
Gearbox
Underneath
Discharge Screw
Gearbox
Check the gearbox oil level. If oil level is OK then overhaul the
gearbox. On reassembly pay particular attention to the
mounting arrangement for the motor to avoid misalignment.
Cellar #2
Motor
Switch Room
Panel EP301
Fuse 18
Check the load. If the load is low then replace the fuse and
remake all connections including cleaning the fuse clips.
Filtration
Transformer
Filtration
Contactor CTR01
DAIKIN 1/2/3
No.1 DAIKIN
Compressor
Control Panel
Connection 152
DAIKIN 1/2/3
No.1 DAIKIN
Compressor
Panel
Contactor CR017
238
239 G
Description