Optimization Problems
with Excel Solver
for Microsoft Excel 2000
fixed
cost per
lot
Variable Cost
Production
Cost
Variable Cost
Production
Cost
Carrying
Cost
average
carrying cost
per unit
Production
Cost
Carrying
Cost
Variable
values in cell
A2
f(x)
Function
formula in cell
B2
Click on cell B2
Remember
f(x) = 98,000 (500) + 98,000 (5) + x (0.50)
x
2
=(98000/A2)*500+98000*5+(A2/2)*0.50
Remember
f(x) = 98,000 (500) + 98,000 (5) + x (0.50)
x
2
Hit Enter
Using Solver
invoke Solver
Click on Tools
Using Solver
invoke Solver
Click on Solver
Using Solver
invoke Solver
Using Solver
complete the Solver Parameters dialog box
Click on cell B2
NOTE: The cell displayed in the Set Target Cell: box must
contain the formula of the function being optimized
(minimize cell B2)
Denise Sakai Troxell (2000)
Using Solver
complete the Solver Parameters dialog box
Check the
Min: circle
NOTE: The cell displayed in the Set Target Cell: box must
contain the formula of the function being optimized
(minimize cell B2)
Denise Sakai Troxell (2000)
Using Solver
complete the Solver Parameters dialog box
Click on the By
Changing Cells:
box
Using Solver
complete the Solver Parameters dialog box
Click on cell A2
Using Solver
complete the Solver Parameters dialog box
Click on Add
Using Solver
complete the Solver Parameters dialog box
Click on cell A2
Using Solver
complete the Solver Parameters dialog box
Using Solver
complete the Solver Parameters dialog box
Click on the
Constraint: box
and type in 98000
Using Solver
complete the Solver Parameters dialog box
Click on OK
Using Solver
set the Options
Click on Options
Using Solver
set the Options
Using Solver
set the Options
Accept the
remaining default
options by clicking
on OK
Using Solver
execute Solver
Click on Solve
Using Solver
read solution
A lot size of
14,000 units
minimizes the balance
between production
and inventory carrying
costs at $497,000.00.
Using Solver
end execution
Click on OK
Using Solver
end execution
Final Comments
Solver might not find the solution
Try to enter different initial lot sizes (in cell A2), for
example, 1, 49000, or 98000 tand
execute Solver.
o
w
Ho dle
han
ms
e
l
b
pr o i th
w er?
lv
So
Click on the
button if you want
some tips now