Offshore Load Out Day 3

This document provides information on offshore maritime risk analysis and load out training. It discusses procedures for moving offshore units by tug to designated locations, including considerations for mooring operations, short dock moves, ocean tows, and positioning with dynamic positioning systems and tugs. Details are provided on towing and mooring equipment requirements, configurations, strengths, and inspection. Methods for prelaid moorings, anchor patterns, and the use of assistant tugs for positioning are also covered.

Uploaded by

bubbly_blu2
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
579 views109 pages

Offshore Load Out Day 3

This document provides information on offshore maritime risk analysis and load out training. It discusses procedures for moving offshore units by tug to designated locations, including considerations for mooring operations, short dock moves, ocean tows, and positioning with dynamic positioning systems and tugs. Details are provided on towing and mooring equipment requirements, configurations, strengths, and inspection. Methods for prelaid moorings, anchor patterns, and the use of assistant tugs for positioning are also covered.

Uploaded by

bubbly_blu2
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 109

1| PAGE

Kuala Lumpur, June 2011

Capt. Nol Haegeman

LOAD OUT TRAINING - DAY 3:


OFFSHORE MARITIME RISK ANALYSIS
www.bimv.com

2| PAGE

www.bimv.com

3| PAGE

LOAD OUT MOVES TO LOCATION

www.bimv.com

4| PAGE

Mooring/Move procedures

Consideration of the planning mooring


operations
Short move from docking to heavy weight or
towed move to location
Transported & moored on heavy weight
ships or under tow by tugs & AHTs
Interfield move
Coastal interfield move
Oceanic move
www.bimv.com

5| PAGE

Basic steps

Local law application as on Unclos EEZ considerations


Preparing of checklists based from barge to all assisting
equipment units
Capability of barge / offshore unit for mooring in
designated location
Are AHTs & mooring anchor equipment available & in
good condition
Use of competent, experienced and certified labour
Time schedule planning based on meteological &
geographical limiations
www.bimv.com

6| PAGE

Cont. Basic steps

With drawings provided proposed mooring-anchor pattern


described & approved by authorities & experts
Anchor-mooring procedures & sequence as location approaches
described &planified based on drawings
Positioning by tugs & AHTs based on DP & transponder
observations
Sufficient tugs available as required bollard power based on
Deadweight & prevailing weather conditions
Good communication required between all individual & combined
offshore units
Approvals & permissions by oil/mineral industry departments and
marine underwriters by warranty surveyors-certifications
Certificate of Approval

www.bimv.com

7| PAGE

Approval Certificate

www.bimv.com

8| PAGE

Operations planning check list

www.bimv.com

9| PAGE

Positioning procedure

www.bimv.com

10| PAGE

NOBLE DENTON

www.bimv.com

11| PAGE

Tow - Mooring gear

Considerations of strenght
Arrangements for each different unit
Towing bridles
Tow mooring planifications
Use of mooring-tow lines

www.bimv.com

12| PAGE

TOWING ARRANGEMENTS

www.bimv.com

13| PAGE

STRENGHT TOWING GEAR

www.bimv.com

14| PAGE

TYPICAL TOWING GEAR


REQUIREMENTS

Equipment
Minimum Breakings Strength (ST)1.3 in.
Pendant Wire 6 x 37 Galv. IWRC3602.2 in.
Pendant Wire 6 x 37 Galv. IWRC2723.2 in.
Pendant Wire 6 x 37 Galv. IWRC(Weak Link)1802604.3 in. 85 ton G-2130 Safety Anchor
Shackle4255.2 in. 55 ton G-2130 Safety
Anchor Shackle3306.3 in. G RIII Stud Link
Chain552.57.Triangular Flounder or Fish
Plate290
www.bimv.com

15| PAGE

STANDARD MAIN BRIDLE

www.bimv.com

16| PAGE

Towing Bridle

Fishplate
Hawser
Tugger line

www.bimv.com

17| PAGE

FISHPLATE

www.bimv.com

18| PAGE

TOWING RINGS & HARP SHACKLE

www.bimv.com

19| PAGE

Connection Details

STUD LINCK &PINS

Dont use Panama

www.bimv.com

20| PAGE

Deep draft towing gear

3/ 85 ton shackles

www.bimv.com

21| PAGE

2 Tugs towing

www.bimv.com

22| PAGE

Towing using anchor/chain

Chain out minimum 150 ft

www.bimv.com

23| PAGE

Narrow Water Towing

Short tow line

www.bimv.com

24| PAGE

LONG DISTANCE OCEAN TOW

www.bimv.com

25| PAGE

TOW GEAR INSPECTION

www.bimv.com

26| PAGE

STRENGHT OF TOWING GEAR

www.bimv.com

27| PAGE

Basic Tow Line Configuration

www.bimv.com

28| PAGE

Towing arrangements for heavy duty semisubmersible

www.bimv.com

29| PAGE

Heavy duty strenght towing gear


components

www.bimv.com

30| PAGE

Stowage of Towing gear

www.bimv.com

31| PAGE

Bridle Stowage

Maintenance bridle & padlocks


Emergency bridles

www.bimv.com

32| PAGE

HIGHLINE TOWING BRIDLE

www.bimv.com

33| PAGE

MINIMUM B.L & STRAND ROPE

www.bimv.com

34| PAGE

SHACKLES STRENGHT

www.bimv.com

35| PAGE

Strenght Requirements Towing Gear

www.bimv.com

36| PAGE

TOWING LINE / PENDANT

www.bimv.com

37| PAGE

MULTIPLE STRAND WIRE ROPE

S- lay strand composition

www.bimv.com

38| PAGE

Strenght composition for mooring lines


( wire synthetic)
1 ) Parallel yarn :
- Highest strenght conversion
- High modulus

www.bimv.com

39| PAGE

Wire/Rope strenght configuration


2) Parallel strand

3) Limited parallel strands

www.bimv.com

40| PAGE

Mooring materials

Strength:Construction:Fibre:(KN)
Wire Rope
Aramid HM strong synthetic fibre
HMPE(high modulus polyethylene)= spectra or
dyneema
LCAP(liquid crystal aromatic polyester) =vectran
Nylon( strong dry / 20% less wet)
Polyester( strength dry = wet)
Polypropylene ( floating)
www.bimv.com

41| PAGE

Minimum Break Load for 8 strand


synthetics

www.bimv.com

42| PAGE

Wire mooring lines

Hexagon wire ( same diam)

Warrington ( diff diam)

Warrington Seal comp.

www.bimv.com

43| PAGE

Tension on wire lines only

2,2 GN ( giga newton) = 10 kip

www.bimv.com

44| PAGE

Only H.M mooring lines

www.bimv.com

45| PAGE

Wire lines & Auxilary synthetics

www.bimv.com

46| PAGE

Wire + Synthetic Fibre mixed Lines

www.bimv.com

47| PAGE

Use of lines by deadweight

www.bimv.com

48| PAGE

TUG HORSE POWER BHP


Field Moves

Ocean Tows

Small semi-submersible
8-10,000
15 16,000
Large semi-submersible with propulsion
8 10.000
10 18,000
Large semi-submersible without propulsion
11 13,000
20 22,000
Small jack-up (100-150 ft. waterdepth)
6 8,000
8 9,000
Medium jack-up (150 250 ft. waterdepth)
8 10,000
12 16,000
Large jack-up (300+ ft. waterdepth)
10 16,000
15 18,000
www.bimv.com

49| PAGE

STILL WATER RESISTANCE vs SPEED

www.bimv.com

50| PAGE

AHTs Supplys Tugs

www.bimv.com

51| PAGE

www.bimv.com

52| PAGE

BOLLARD POWER AHT


BP is tractive force in tonnes or Kn
Depends on propeller type/ available
nozzlesshape of hull draught & trim
Rules of thumb conversion BHP to B.P
- 0,9 x BHP x 1,1/100 (fix pitch - rudder)
- 0,9 x BHP x 1,2/100 (fix pitch - nozzle)
- 0,9 x BHP x 1,25/100 (contr.pitch - rudder)
- 0,9 x BHP x 1,4/100 (contr.pitch - nozzle)

www.bimv.com

53| PAGE

Bollard Power Test

Static bollard power

www.bimv.com

54| PAGE

Cont. BP test

Dynamic bollard power

www.bimv.com

55| PAGE

REQUIRED BOLLARD POWER


Required B.P=
(Displacement (t) x 60) : 100.000 + 40
In still water to move up to 3 4 knts

www.bimv.com

56| PAGE

Warranty B.P for ZERO Knts


-To remain in position meteo elements in opposite
direction of heading
- Wind 44 knts
- Current 3 knts
- Wave height 25 ft

Beaufort Force 9
Strong gale
Wind speed (knots): 41 - 47
Wave height (feet): 23 - 32
Sea state: High waves; sea begins to roll; dense
streaks of foam; spray may reduce
visibility
www.bimv.com

57| PAGE

B.P (resistance factors)

Wind Resistance (Rw) ( area- wind velocity-still water tow speed)

Wave forming Resistance ( Rwf) ( hull shape- under water area)

Current Effect (Rc) ( wetted underwater area)

Hawser Resistance (Rh)

Wave height Effects (Rwh)

Shape Coefficient (Bc)

Height Coefficient ( Freeboard)


www.bimv.com

58| PAGE

Meteological aspects wind current

www.bimv.com

59| PAGE

Forecasting & prevailing synopsis

Petterssen, 1958

www.bimv.com

60| PAGE

Global Meteo Services

For accurate meteo planning acc. Wind,


swell, current
Wefax by NOAA(Nat.Oceon.Atm.Ass)USA
AWT ( applied weather techno.)
BVS ( Bon Voyage System)

www.bimv.com

61| PAGE

WIND VERSUS DRAFT

www.bimv.com

62| PAGE

CANDRIL WAVE/CURRENT

www.bimv.com

63| PAGE

Example AHT

www.bimv.com

64| PAGE

EXAMPLE OCEAN AHT

16.500BHP emergency towing vessel


180 tons bollard pullfull

Built 2002 chinaclassed lloyds +100a1 +lmc, ums2,258 grt / 677 nrt
1,800 dwt
67.40m loa x 15.50m beam x 7.50m x depth x 6.20m draft
2 x wartsila 16v 32lnd main engines 2 x cp propellers in nozzles2 x 9t
bow thrusters1 x 8t stern thrustermax speed 17 knots1 x
triple drum ah/towing winch, 450t brake2 x 10t tugger winches 2 x 10t
capstans 180 cbm
chain locker1 x j-hook344 m2 clear deck area - 12.6m x 27.3m10.0
t/m2
deck strength700 tons deck cargo1 x deck crane (3t @ 15m
420 cbm fresh water 1,200 cbm fuel oilfifi 1: 2 x 1200 cbm/hr
fifi pumps accommodation for 20 persons in 17 cabins

www.bimv.com

65| PAGE

OFFSHORE POSITIONING

www.bimv.com

66| PAGE

ANCHOR PATTERNS

45 symmetric 8 line pattern

www.bimv.com

67| PAGE

10 line spread pattern

www.bimv.com

68| PAGE

12 line spread pattern (e.g FPSO)

www.bimv.com

69| PAGE

Pulling Barge spread

www.bimv.com

70| PAGE

Drilling Tender Spread Combination to


other units

www.bimv.com

71| PAGE

Support Vessel Mooring Spread

www.bimv.com

72| PAGE

Mooring Catery Curves

www.bimv.com

73| PAGE

www.bimv.com

74| PAGE

POSITION CALCULATING

www.bimv.com

75| PAGE

Move to position

2 AHT

www.bimv.com

76| PAGE

3 AHTs

www.bimv.com

77| PAGE

To location

www.bimv.com

78| PAGE

Alongside platform

www.bimv.com

79| PAGE

Dropping anchors

www.bimv.com

80| PAGE

Running Anchors

www.bimv.com

81| PAGE

www.bimv.com

82| PAGE

Move of anchor

www.bimv.com

83| PAGE

PRELAID MOORINGS

www.bimv.com

84| PAGE

AHT Pull Leads

www.bimv.com

85| PAGE

www.bimv.com

86| PAGE

D.O.P use of 2 AHT

www.bimv.com

87| PAGE

MOORING CHAIN EQUIPMENT

www.bimv.com

88| PAGE

D.O.P in Confined Area

Use of 3 AHT

www.bimv.com

89| PAGE

USE OFYOKOHAMA SUPPORT &


SUPPORT BOUY BLOCK

www.bimv.com

90| PAGE

Deploy yokohama support

www.bimv.com

91| PAGE

Yokohama Support Block

www.bimv.com

92| PAGE

Deploy midline support block

www.bimv.com

93| PAGE

Cont. M.S.L

www.bimv.com

94| PAGE

Cont M.S.L

www.bimv.com

95| PAGE

Midline support bouy blocks

www.bimv.com

96| PAGE

MULTIPLE POINT MOORING

www.bimv.com

97| PAGE

MULTIPLE SUPPORT POINT MOORING

www.bimv.com

98| PAGE

SURFACE

BLOCK

www.bimv.com

99| PAGE

SINGLE POINT MOORING

www.bimv.com

100| PAGE

TAKE OFF ANCHOR POSITION

Chase of anchors

www.bimv.com

101| PAGE

TAKE off BUOY / ANCHOR

www.bimv.com

102| PAGE

LIFTING CHAIN

www.bimv.com

103| PAGE

Departure Sequence

Open water 2 AHT

www.bimv.com

104| PAGE

Departure confined space

3 AHT

www.bimv.com

105| PAGE

INSTALLATION OF CALM BUOY

www.bimv.com

106| PAGE

Calm buoy

www.bimv.com

107| PAGE

Positioning Jack up barge

www.bimv.com

108| PAGE

Jack up leg penetration

www.bimv.com

109| PAGE

Thank you & enjoy the offshore

www.bimv.com