Caparo Maruti
Caparo Maruti
Training at
Caparo Maruti Ltd.
Gurgaon, Haryana
20th May to 5th July 2014
By:
Submitted
Divyanshu
Jain
2011UME110
Acknowledgement
Divyanshu Jain
Preface
This report presents a very scholastic approach to the industrial training that I
underwent at Caparo Maruti Limited, Gurgaon for eight weeks from 20TH May 2014
to 5TH July 2014. The training was a part of the curriculum of B.Tech. here at
MNIT,Jaipur to be accomplished during summers before the commencement of fourth
year.
This report presents a very simple,impicit yet a very comprehensive study of the
capabilities and responsibilities of the department. This report demonstrates overall
view of working of Productin and Engineering Department, softwares being used for
various analyses, methods of testing being followed in various labs and their incessant
search for innovative ideas.
I was exposed to the assembly line process employed along with practical knowledge
and application of different manufacturing processes as drawing, chipping, along with
the basic ones as CNC machines. The main learning was of the inspection and the
quality testing of each part at every station along the assembly line.
It turned out to be a wonderful experience both industrially and learning wise; living
in a new city altogether, experiencing the functionalities of Reasearch and
Development Department, flow of knowledge as well as decision making processes
within the company. Working with the employees and learning from them was such a
life changing experience.
Contents
Contents
List of tables vi
List of figures vi
1. Company Overview
1
1.1. About the Group
1
1.2. Business Strategy
2
1.3. Global Presence 3
1.4. Caparo India..4
1.5. Customers .5
1.6. Products.6
1.7. Caparo Maruti Limited..7
1.8. Guiding Principles.8
1.9. Gurgaon Plant ...9
2. Departments
10
2.1. Press Shop
11
2.2. Welding
17
2.3. Quality Control Section
22
3. Project: Cost Minimization by reducing the no. of
transport trips in final product supply to customer end
28
3.1. Supply Chain Structure
28
3.2. Shortcomings and Problem breakdown
29
3.3. Before Improvement Status 31
3.4. Savings to supply chain structure 33
4. Conclusion
34
5. References ....35
List of tables
S.
Title
No.
1
2 Data collected before improvement
3 Data calculated after improvement
Table.
No.
3.1
3.1
3.2
Pg.
No.
15
30
32
List of figures
S.
No
1
2
3
4
5
6
7
8
9
Title
Drawing operation
Trimming operation
Restriking operation
Completed part
Resistances
Welding time study curve
Butt welding
5S
Kaizen
Fig.
No
2.1.1
2.1.2
2.1.3
2.1.4
2.2.1
2.2.2
2.2.3
2.3.1
2.3.2
Pg.
No.
13
14
15
16
18
19
20
23
26
CONCLUSION
CML is a world class company in sheet metal technology. Training here has been very
useful in understanding the working environment of the company, relation between
officers and subordinates, shop floor, organizational values of any industry and many
other things. How people work together and achieve mass production in any industry
in prescribed time with quality. We came to know about various processes and
activities done to develop and produce the components effectively and accurately.
The industrial training is very beneficial to me. After the training, I got the practical
knowledge about machines and machine processes and also know how these
machines are used for making different kind of equipments, machines and products.