Statement of Work: October 3rd, 2000

The document is a statement of work outlining responsibilities for introducing a new 2002 model year for the Ford Escort SW and doors between Ford and a supplier. It assigns primary responsibility to the supplier for design and development of the parts to meet specifications, quality targets, and timing for production of 19,000 vehicles per year at the Ford Pacheco plant in Argentina. Key responsibilities for the supplier include component design, testing, manufacturing plans, quality control, and service documentation to support production and sales of the new vehicle model.

Uploaded by

LndIngenieria
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
367 views2 pages

Statement of Work: October 3rd, 2000

The document is a statement of work outlining responsibilities for introducing a new 2002 model year for the Ford Escort SW and doors between Ford and a supplier. It assigns primary responsibility to the supplier for design and development of the parts to meet specifications, quality targets, and timing for production of 19,000 vehicles per year at the Ford Pacheco plant in Argentina. Key responsibilities for the supplier include component design, testing, manufacturing plans, quality control, and service documentation to support production and sales of the new vehicle model.

Uploaded by

LndIngenieria
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 2

October 3rd, 2000

Statement of Work
Program Information:
Introduction Timing

Job#1 Sep.1st, 2001

Program Description

Program is to introduce 2002 Model Year for Escort SW, 4


& 5 doors (unique FSAO)

Assembly Plant

Ford Pacheco - Argentina

Volume Estimated

19.000 Escort SW, 4 & 5 doors per year

Full Service Supplier


Parts
Program Targets:
Design and development of the part mentioned above will be SUPPLIER responsibility with Ford Engineering
supervision and approval;
Meet component durability targets established for this program / WCR requirements / DVP and all Engineering
Specifications;
Component must support the tests at Tatui Proving Ground (Tatu Test Procedures P1 and E2);
Component is to be robust, safe and easy to handle and provide good ergonomics during assembly.
Commodity Assumption / Information:
Styling of Alloy Wheel 6J x 14x 41 must accord to information delivered by Ford Engineering;
See engineering drawing XXX-XXXX-XXX and Engineering Specification SXX-XXXX-XXX attached for
reference, which specifies the standards and regulations that must be considered for the construction of this part,
as well as material and finish notes (except when specified);
Part to be supplied including all components shown in the engineering drawing mentioned above; supplier will
be responsible for all of them, and for the approval of styling requirements;
Supplier will be responsible for the final appearance, and for the approval of Ford Styling requirements;
Detailed-tooling description is required;
Development timing is required;
CAD information (3D Model and 2D drawings) will be supplier responsibility, with logo Ford and part numbers
(according to drawing. Std. E3);
Production parts must have both logo Ford and part numbers inserted, according to spec. S86BB-1K266-AA.

The following is a Statement of Work defining the assignment of responsibilities to be accomplished by the Supplier and Ford
Motor Company:
(L) Lead
assumes primary role in accomplishing task and requests support only when necessary
(V) Verify
conducts a final check on work completed and assumes little/no responsibility in completing task
(S) Support assumes secondary role and assists when requested by team with lead responsibility

October 3rd, 2000


Responsibilities
FSAO Supplier
Design & Development
1 Agree on affordable targets - Cost, Weight, Quality, Function
L
S
2 Work with the Program Team to manage design and development to meet functional objectives and affordable V/S
L
targets
3 Support Program Timing
V/S
L
4 Detailed Assumptions
L
S
5 Component DVP&R (according to material specification)
V/S
L
6 WERS entry
L
S
7 Release responsibility
L
S/V
8 Design FMEA
V/S
L
9 Process FMEA
V/S
L
10 Perform Engineering Specifications (ES) tests and issue results
V/S
L
11 Computer Aided Engineering (CAE) as required
V
L
12 Develop Risk & Opportunity (R&O) list for cost / weight / investment / function for all targets set from program
V
L
inception to launch.
13 Provide all Test Plans (vehicles)
L
S
14 Fully support vehicle launch at vehicle assembly plant
S
L
15 Provide technical / engineering liaison for program support
V/S
L
16 Participate in PMT / PAT meetings as required
V/S
L
17 Report Design and Open issue status / resolution in support of Design meetings
V/S
L
18 Define & identify Critical & Significant Characteristics
V
L
19 Prepare vehicle layout information
L
V/S
20 Prepare detail drawings
V
L
21 Provide assembly drawings
V
L
22 Provide manufacturing feasibility sign-off
V/S
L
23 Provide build and parts requirements schedules
S
L
24 Utilize design software that is compatible with Ford (Usage of PDGS or equivalent/convertible)
S
L
Manufacturing Development
25 Implement complete Statistical Process Control in all areas of the mfg process
V
L
25 Acquire & provide PIST & PIPC data as required
V
L
26 Develop Process Control Plans
V
L
27 Develop Dimensional Control Plans
V
L
28 Conduct capability runs on each process prior to launch & and provide results
V
L
29 Demonstrate conformance to minimum Cpk as required by QS-9000
V
L
30 Arrange plant visits & facility reviews as requested
V
L
Quality
31 Develop plan to meet quality objectives
V
L
32 Develop quality improvement proposals for review with Ford Engineering and STA
V
L
33 Provide quality reports for surrogate and actual process upon request
V
L
34 Provide in-house quality plans
V
L
35 Provide sub-suppliers quality plans upon request
V
L
36 Review & report on assembly plant defects
V
L
37 Utilize Ford 8D problem resolution process throughout the program
V
L
38 Set Quality targets on a subsystem & component level
V
S
Service
39 Develop service part content (additional part content to production parts)
V/S
L
40 Develop service documentation
L
S
41 Provide service part drawings (6 months prior Job#1 latest)
V
L
The above Statement of Work is a guideline to the division of responsibilities between Ford Motor Company and the Supplier. It should
not be considered an all-inclusive list of tasks to be accomplished; it is expected new responsibilities will be added and that existing tasks
will change as the program progresses.