Best Practices For Concept Applications: Contents
Best Practices For Concept Applications: Contents
Contents:
1. Variables
2. Structured Data Types
3. Sections
4. Languages
5. Derived Function Blocks
6. Organizing The Project
7. Organizing Multi-User Work
8. Initial Values and State RAM Values
9. Memory Size and Memory Map
10.Concept Converter
11.EFB (C) Tool Kit
12.Animation
Appendixes
A:
B:
Page 1 of 11
file: Bestprac
You do not need to store the same data in different variables (unless other
program requirements exist). Variables occupy memory and moving data takes
CPU time.
Hint: The analyser is able to detect variable overlap for located
variables.
Use located variables for discrete (Boolean) variables only if they have to be
interfaced to I/O, other PLCs or HMI devices. Otherwise use unlocated variables.
Located variables are the traditional 0x, 1x, 3x and 4x Modbus addresses, thus
must be used for I/O. Accesses by HMI can use the full features of Modbus to
maximize data traffic. However, unlocated variables operate faster within the CPU
than located variables.
Concept allows multi-assigned output to variables. Data can thus update within a
scan. Be aware that the last item executed this scan will update to on-screen
animations. The analyser will report (sometimes many) warnings for multiassignments.
2. Structured
Data Types
Organize the structured data types into local and global data types. This gives a clean
structure, and avoids problems when combining subprojects.
Global data types may use data types distributed along with the EFB-libraries, Local
data types may use global data types.
Please note that only one dty-file with structured data types is allowed in a global/local
DFB folder.
Optimize data structures; use only components that are really needed. This saves
memory and improves scantime.
All structures (Located or Unlocated) are BYTE (not WORD) aligned.
Hint: Care is required when laying out structures so that they map on to the normal
WORD boundaries of 4xxxx addresses. This is essential for correct access to
data by HMI devices.
Hint: It is not necessary to develop DFBs to move data structures or arrays. The IEC
MOVE EFB accepts variables of any data type at its input or output.
3. Sections
Page 2 of 11
Do not partition your project into too many small sections. Section organization
consumes CPU memory and time. Keep a balance between the number of
sections and their size. Currently there is a limit of 1600 IEC-sections including
transition sections.
Do not make a section too large. A large section may prevent a download
changes if your program size is getting close to the memory limit of a CPU The
Memory Prediction feature of Concept V2.5 can be used to show the logic size of a
section.
Hint: ST/IL sections can be particularly affected here. The graphical editors
FBD/LD/SFC have boundary limits (but can still be large), while the text editors
ST/IL do not. Use the Section enable/disable feature according to your
application model. Disabled sections are not executed hence scan time will
improve significantly.
Hint: A download changes with too many sections at once may not be possible. All
new sections are held in one temporary area in the PLC until the download is
finished; then they get activated together. Too many new sections together
may exceed memory limits.
Hint: The above problem can be avoided by downloading a few of your modified
sections at a time. This is called Sequential Download. You select a normal
download changes but de-select several of the modified sections. As
downloaded sections match the CPU, they will disappear from the selection
list. Note: sections that logically belong together should be downloaded
together.
file: Bestprac
Pay attention to section execution order. The execution order determines in which
sequence sections get executed during a scan. A wrong sequence will cause the
control application to compute old data (new data will be delayed one scan).
Hint: If any particular logic section is used for the overall application co-ordination,
this section must be executed first.
Hint: If a section contains a SFC CNTRL EFB, then this should be executed before
the SFC section it controls.
4. Languages
Concept is a software toolbox. The control languages (SFC, FBD, LD, ST, IL, 984LL
and C) represent powerful tools for different application purposes. As a rule of thumb
the following guidelines apply:
SFC
Sequential control and batch recipe procedure
FBD
Continuous control and/or discrete control
LD
Discrete control
ST
Equations, table manipulation, complex algorithms
IL
Fastest possible logic execution
984LL
Traditional 984 logic with segments sometimes necessary for interrupt
based logic (for high speed machines)
Note: Structured Text allows you to create loops. While executing loops, array
boundaries are checked and there is an impact on scan time. This option can be
chosen in the Code Generation option Enable Loop Control
Example:
FOR I:=1 TO 100 DO
A[I]:=I;
(* boundary checking *)
END_FOR;
Or
WHILE (I=I) DO
A[I] := I;
(* infinite loop, loop control terminates loop *)
END_WHILE;
For more detail see Concept file README.DOC or appendix B
It is recommended to choose option Enable Loop Control only during the
development phase.
Page 3 of 11
file: Bestprac
DFBs hide a big portion of your application code and as a result programs are
much easier to understand.
Configure only inputs and outputs that are really used by your application. Inputs
and outputs consume memory and increase runtime.
Do not use unnecessarily complex structures for inputs and outputs or variables. If
you are only using a few components of a structured data variable then only pass
those components as inputs.
Often used DFBs (used more than 100 to 200 times) should be converted to EFBs
(using the Concept EFB C Toolkit). EFBs written in C normally execute faster
and consume less memory than DFBs. The following example shows the usage of
DFBs in a real project. The larger usages here should be converted to EFBs. See
Section 11
Hint: Prototype EFBs as DFBs and export them to ST to get the framework for the
C code body.
It is better to design several specialized DFBs than one complex universal DFB.
This saves scantime and memory.
In order to avoid a full download when modifying an existing DFB.
If you have a DFB which, is being used in a running process and you must make
modifications to the DFB, modify per following steps:
1. Using Concept make sure that the project is EQUAL with the controller.
2. Disconnect and close Concept.
3. Open the desired DFB using the DFB Editor.
4. Make the desired modifications to the DFBs logic.
5. Then use File Saves As and save the changes under a new DFB name.
6. Start Concept with your project click on the DFB that you would like to change
7. Click on Objects pull-down menu choose Replace FFBs and choose the new
DFB. You must perform step 7 for every instance of the DFB in your project.
Note: The following are some of the implications to consider when modifying a
DFB:
If you add a new input/output pin in between existing pins (with the DFB
editor) then in a Concept program section, existing logic connections below
the new pin may or may not be removed depending on the new datatype that
gets presented at a given pin position.
If you change the datatype of an existing pin then logic will be removed
The easiest way to add a pin to a DFB is at the bottom. This retains all existing
logic connections while adding the new pin.
If you want to preserve the possibility to convert a DFB to a EFB without much
effort keep in mind that in EFBs in-out pins can be located only at the top.
Page 4 of 11
file: Bestprac
6. Organizing
the Project
Page 5 of 11
There are three different places where you can locate global DFBs (please refer to
Help)
- First, if the PreserveGlobalDFB switch in the Concept.ini file is set, the
directory <projectdir>.GLB is searched. If the folder exists the global DFBs are
assumed to be here. Using this option every project can use its own global
DFB folder without affecting other projects.
- Second, if the switch is reset or if there is no GLB directory, the DFBs are
assumed to be in the folder that the entry GlobalDFBPath refers to in the
Concept.ini file. Using this option DFBs located on a network drive can be
shared by several Concept applications.
- Third, if the entry GlobalDFBPath is empty or refers to a non-existent folder
the DFBs are assumed to be in the <Concept Install Folder>. This was known
as the global folder in Concept 2.2.
When importing projects from ASCII files via the Concept Converter or via the
Archiving feature, you should consider setting the PreserveGlobalDFB switch
and creating a GLB folder manually so as to not override global DFBs and data
types used by other projects. Be careful if you create more than one dty-file in a
DFB folder only one dty-file in a DFB folder is allowed so the other dty-file(s) will
be ignored.
Change used structured data types as little as possible because this means a lot of
internal changes in DFBs, especially in text sections. Use the Update data types in
nested DFBs feature to make the project consistent again. Be aware that you
might change DFBs used by other projects.
Be aware that in contrast to Concept 2.2 declared but unused variables consume
memory from the Global Data area in Concept 2.5.
From time to time execute (at least once) the optimize feature to compress
wasted data or code memory that is not re-usable.
Sometimes a corrupted database can be repaired by deleting the key-files (*.q1
and *.q2) of the database. They will be re-generated the next time the database is
opened.
In most cases a corrupted database can be repaired by an export/import with the
Concept Converter (do not use the mode Re-connect to Equal). If you fail to
export the project because of analysing errors try an export without exporting
DFBs. This does not require a successful analysis.
Deleting an item in a program section is a useful test of the databases
consistency. Deleting an item should also correctly remove other connected logic
items. You can then use undo delete to return to your original logic.
Hint: If you get a database error after the above delete test, use Concept
Converter to export (not in re-connect to Equal-mode) and them re-import
your project. The analyser will clean up your database to assure correct logic
operation.
file: Bestprac
Subproject variables can be merged by exporting them from the subprojects and
importing them into the combined project. Logic can be merged by sequentially
copying sections to the clipboard and saving them in the clipboard format to a
file(s). This makes it unnecessary to constantly switch between the subprojects.
Another feature of Concept Section Import/Export (creating xx.SEC files) can be
used. The advantage with this method is that variables and DFBs come with the
export process. A restriction exists though in that the source and target projects
MUST have the same environment (i.e. same global/local DFBs and DTY files).
When working with several projects sharing the same set of DFBs and data types
this common environment should be located on a server with access restrictions
(use the GlobalDFBPath entry in the concept.ini file).
When changing data types and/or nested DFBs first make the set of DFBs
consistent by opening/closing the DFBs in a hierarchical bottom-up order.
Please see section 10 below about implications of transferring files between PCs.
8. Initial
Values and
State RAM
Values
Located Variables
Initial values of located variables are downloaded to/uploaded from the PLC only if
the corresponding check boxes in the download/upload dialog are checked (State
RAM & Initial Values). Otherwise no State RAM is downloaded/uploaded.
Note Only 4x variables can have initial values.
State RAM
State RAM values are uploaded from the PLC by checking the State RAM check
box in the upload dialog. Only 0x, 1x (along with their disable state), 4x and 6x
memory can be uploaded.
The uploaded State RAM values are stored in a database table and are persistent.
The Concept Converter retains these values during an ASCII export/import.
The values can be visualized either by the RDE if Concept is offline or by looking
into the ASCII export file. 4x State RAM values can be changed by the RDE for the
next download if Concept is offline.
If the database table contains State RAM values (generated by a former upload of
State RAM or by manual changes) State RAM values can be downloaded.
Unlocated Variables
Initial values are downloaded generally by the download/download changes which
follows the creation of the variable. Once the download is executed a change of the
initial value or a new initial value will not affect the PLC until the next full download.
Page 6 of 11
file: Bestprac
Page 7 of 11
The values for x K logic and y K state in the PLC selection dialog mean: y K
state is roughly the memory available for registers, expressed in K ladder logic
instructions (1K ladder logic instructions = 20Kbytes). x K logic is the memory
available for the control application; this value is also expressed in K ladder logic. If
the application does not contain 984-ladder logic, all program memory is available
for the IEC program. The amount equals roughly the number of available bytes in
the loadable instruction configuration dialog.
Please note that the above is only true for the loadable base controllers. For the
32-bit controllers you would have to use the IEC Heap Size (Concept 2.2: IEC
Usable Memory Size) to adjust the user logic area for IEC.
Configure (in memory map) only as many registers as needed (plus 10% reserve
because configuration changes are only possible while PLC is stopped) for the
application. This frees up memory and increases scan time.
The IEC Global Data area (configured in the PLC-selection dialog) should be
adapted to the project needs. This sets the maximum data area available for
unlocated variables. As a part of the IEC Heap (the totally available memory area
for IEC-program and data) it consumes IEC logic space.
Note: Keep in mind that unused IEC Heap is temporarily used for online changes.
Hint: Configure the IEC heap after project start-up so that 20% to 30% reserves
are available for online changes. Note that when using the IEC simulator that
the displayed values for memory and scan time merely represent values that
could be expected using a real controller.
file: Bestprac
The following applies to the Concept Converter when not working with the Re-connect
to Equal feature:
Users may use the Concept Converter to move/copy Concept projects between
PCs. Be aware that when importing Concept files with the Concept Converter that
the internal version date/time stamps of the program are updated. This causes the
following effects:
- Your Concept project will become NOT-EQUAL.
- Note: A particular xx.ASC file will import into different PCs differently. There
are no constraints within Concept to guarantee that the Concept Converter
program on 2 PCs will import variables and logic to exactly the same Concept
memory locations. If programmers have used the Concept Converter to set up
project files on 2 PCs, then files MUST NOT be directly copied between these
PCs if you want to retain online EQUAL status.
Hint: Use the Concept Converter as needed to place files on one PC. At this
point, users can directly copy files between PCs and EQUAL status will
be preserved (if DFB files have the same internal version).
Hint:: Use a zip program to transfer files between PCs
Export and re-import your Concept project at the end of the commissioning phase.
This minimizes the used memory by deleting code fragments and improves scan
time.
Hint: Use a site Master PC as the single point of updating a set of site projects.
Then distribute these files as the master set.
Optimize your Concept project at the end of the commissioning phase (menu item
optimize project). Deleting objects and online changes create gaps in the symbol
image. Optimize project eliminates those gaps.
Close all other applications and disable your screen saver when using the Concept
Converter. Problems have been reported occasionally. The converter will also
execute significantly faster.
Note: Please note that project Export/Import or Project Optimization will force a full
download.
Converting with the Re-connect to Equal feature:
In this mode the Concept Converter does not optimize the database.
The ASCII file can be used for archiving purposes.
When importing the ASCII file it is recommended to locate the global DFBs in the
GLB folder.
Page 8 of 11
The EFB-Toolkit Concept 2.1 and higher works with Borland V5.0 Compiler &
Borland Turbo 5.0 Assembler (TASM.EXE AND TASM32.EXE).
Concept comes with many built in EFBs. The user may design more EFBs to meet
local requirements. A good source for EFB designs is the set of site DFBs. See
section 5. Above for more details on this.
If EFBs (Elementary Function Blocks) have to be installed on a different PC, they
can be copied from their folder under Concept\lib on the source PC, into the same
folder name in Concept\lib on the destination PC. The following files have to be
deleted to activate the new EFB library:
Concept\LIB\~AITMP.*
file: Bestprac
start
Output_1
stop
Output_1
A similar animation effect can be observed with DFBs. If an output from a DFB is
connected to a multi-assigned variable, then animated data that the user sees may
not match data from the same pin internally within the DFB (as seen when the DFB
is Refined and animated). Data as seen by the user when a program section is
animated is updated to the PC screen at the end of each program scan not the
data that might exist on a given DFB pin in its order of execution. Data as seen by
the user when a DFB is Refined and animated is read from the DFB (even though
it is updated on the PC screen at the end of the program scan).
Hint: This data display effect can be used as a feature to display intermediate
data along a calculation path.
Page 9 of 11
file: Bestprac
DIRECT
This represents going on-line without an open Project. This will allow the user the same on-line capabilities
as being NOT EQUAL except Download will not be allowed.
EQUAL
This means your project files have the same version time stamps as the one in the PLC. The following
conditions are all satisfied:
The PLC configuration image is identical between PLC and program files.
The checksum for LL984 is identical.
The version time stamps of the DFBs and EFBs used in your program are identical.
The version time stamp of the program is identical.
User defined datatypes are identical to the last time you opened the Project.
MODIFIED
This means that your project assumed PLC timestamp is identical to the actual PLC time stamp, while the
Program time stamp is different.
The other conditions above remain unchanged, while the version time stamp of the program is different.
To finish the modification and make the Project and PLC EQUAL, do a Download Changes.
Concept V2.1 will give the following limitation: If the user attempts to exit while in a MODIFIED state,
Concept will give a warning that the next time the user goes on-line with this Project, it will be in a NOT
EQUAL state.
Beginning with V2.2 Concept will allow the user to be modified, save his changes, exit Concept, re-open
Concept, open the project, and be Modified.
NOT EQUAL
This occurs if the actual PLC time stamp is different from the assumed PLC timestamp. The assumed PLC
timestamp is changed inside Concept upon any of the following:
The PLC configuration image is different between PLC and program files.
The checksum for LL984 is different.
The version time stamps of any of the DFBs and EFBs used in your program are different.
User defined datatypes have changed from the last time you opened the Project.
Note: If a Download Changes is aborted, then NOT EQUAL is displayed. The timestamps are actually
still in the MODIFIED state.
Note: If you are MODIFIED, download changes to the PLC, then exit Concept without saving, you will then
return to Concept NOT EQUAL. You will have downloaded a new version time stamp to the PLC without
saving this to your project files.
Note: Only certain on-line functions will be available when in a NOT EQUAL status.
Page 10 of 11
file: Bestprac
Immediately after the aborted Download Changes go into Online, Object Information.
Page 11 of 11